| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹64.7 L+₹31,079.15 (0.48%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹65.6 L+₹1.2 L (1.87%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹66.5 L+₹2.1 L (3.27%)Rejected-Finance | L4 | Rejected-Finance Fourth Lowest | |
| 5 | L5₹68.3 L+₹3.9 L (6.07%)Rejected-Finance | L5 | Rejected-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | P.O.ANTONY L1 | Babu Antony L4 | TENNY T J L3 | K R PAULSON L5 | V L POLACHAN L6 | ROCHBECK ESTATE PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 5.71 | cum | 300 ₹1,714.2 Lowest | 3,205 ₹18,313.37 | 3,157.82 ₹18,043.78 | 3,671.89 ₹20,981.18 | 3,178.55 ₹18,162.23 | 3,157.06 ₹18,039.44 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 16.81 | cum | 1,850 ₹31,094.8 | 1,860 ₹31,262.88 | 1,831.66 ₹30,786.54 Lowest | 2,129.84 ₹35,798.35 | 1,843.25 ₹30,981.35 | 1,890.28 ₹31,771.83 |
| 1.00 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 207.71 | sqm | 890 ₹1,84,861.9 | 880 ₹1,82,784.8 | 867.35 ₹1,80,157.27 | 792.72 ₹1,64,655.87 Lowest | 920.07 ₹1,91,107.74 | 866.88 ₹1,80,059.64 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 182.26 | sqm | 635 ₹1,15,732.56 | 665 ₹1,21,200.24 | 656.07 ₹1,19,572.69 | 599.62 ₹1,09,284.34 Lowest | 692.27 ₹1,26,170.36 | 655.32 ₹1,19,436 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 319.36 | sqm | 870 ₹2,77,843.2 | 840 ₹2,68,262.4 | 826.66 ₹2,64,002.14 | 755.53 ₹2,41,286.06 Lowest | 869.08 ₹2,77,549.39 | 826.46 ₹2,63,938.27 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 82.4 | metre | 185 ₹15,244 | 200 ₹16,480 | 196.19 ₹16,166.06 | 179.31 ₹14,775.14 Lowest | 217.25 ₹17,901.4 | 196.08 ₹16,156.99 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 59.1 | sqm | 902 ₹53,308.2 | 890 ₹52,599 | 878.86 ₹51,940.63 | 803.24 ₹47,471.48 Lowest | 961.53 ₹56,826.42 | 878.06 ₹51,893.35 |
| 1.01 | OD227515/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Cement content obtained as per mix design shall be used by the contractor at site to obtain the required strength. Excess cement used as per design mix is not payable separately as per circular no. CE/BL/GL/6541/2015 dtd. 30.08.17 of CE, BLDS PWD.-All work above plinth level upto floor V level<br> As per data Min. Cement Content 330Kg/m3 | 83.72 | cum | 10,900 ₹9,12,515.3 | 11,250 ₹9,41,816.25 | 11,114.69 ₹9,30,488.5 | 10,158.31 ₹8,50,423.24 Lowest | 12,050 ₹10,08,789.85 | 11,114.64 ₹9,30,484.32 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 9,627.45 | kg | 92.5 ₹8,90,539.59 Lowest | 98 ₹9,43,490.59 | 96.68 ₹9,30,782.35 | 112.43 ₹10,82,414.77 | 112.4 ₹10,82,125.94 | 96.32 ₹9,27,316.47 |
Tender Value
₹76.3 L
EMD Value
₹50,000
Closing Date
18 Oct 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division,Thrissur
GENERAL-GED-Annual plan 2023-24 -Construction of School Building for Govt. Model Boys Higher Secondary School Irinjalakuda Thrissur-New building-General Civil Work-1
2025_PWD_806133_1
48/2025-26/EE(B)TSR
Open Tender
Civil Works - Buildings
Item Rate
365 days
Irinjalakuda
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
3 Nov 2025
7 Oct 2025
21 Oct 2025
7 Oct 2025
18 Oct 2025
7 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1343046.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1343046.xls
BOQ • 0.32 MB
viewsbd.pdf
Tender Documents • 1.93 MB
viewnit.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .