Loading…
Loading…
Tender Value
₹11.4 L
EMD Value
₹12,000
Closing Date
13 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Irri. Mech. Dn. No.1, Vadodara
Tender for Requirement of Spares and job work for installation of fuel level monitoring sensor in various Heavy Earth-Moving machinery like Excavator, Dozer, Dumper, Truck, Trailor.
290730
NIT-26 of 2025-26
Open
Electronics Equipment
Vadodara
14 documents required · 13 mandatory · 1 optional
₹900
Yes
Executive Engineer, Irrigation Mechanical Division No.1, Vadodara
₹12,000
Yes
27 Mar 2026
27 Mar 2026
27 Mar 2026
13 Apr 2026
27 Mar 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes
and duties, together with all general risks, liabilities and obligations set out or
implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items
are provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates
or prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy dutyripper.
Signature of the Contractor Executive Engineer
BILL OF QUANTITIES
(A)Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with Quantity Unit Rate in Amount
No brief specification and figure
reference to book of
specifications)
1 Estimate for Requirement of Spares 01 Job 11,42,685.00
and job work for installation of fuel
level monitoring sensor in various
Heavy Earth-Moving machinery
like Excavator, Dozer, Dumper,
Truck, Trailor.
I/We am/are willing to carry out the work at………………….% above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my
/our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Signature of the Contractor Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT-26 of 2025-26 (Fuel Senser) IInd Attempt.pdf
BOQ Nporocure.pdf
DTP of Fuel Sensor .pdf
Mendatory Documents1.pdf
Mendatory Documents2.pdf
Download all tender documents and submit your bid