Loading…
Loading…
Tender Value
₹21.6 L
EMD Value
₹1.1 L
Closing Date
16 Apr 2026, 12:00 pmClosed
Chief Engineer
LDA Gomti Nagar, lko
Faizullahganj dwitiya ward ke antargat krishna lok colony me shri nanhu prashad ke ghar se shri suresh kashyap ke ghar tak C.C. sadak va naali nirmaan ka karya
2026_LDAUP_1135165_1
01/E-Nivida/CE/2026-27/20
Open Tender
Civil Works
Percentage
60 days
LDA Gomti Nagar, lko
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,475
Secretary LDA
₹1.1 L
9 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. | - | Cum | - | - |
| 2 | Carriage of materials transport including loading unloading and stacking Lime,moorum,building,rubbish,5.0 km sanction Rate | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 0.4 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level., Mild steel and Medium Tensile steel bars | - | Kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 | 1 | Sqm | - | - |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) | 1 | Cum | - | - |
| 8 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand) | 1 | Sqm | - | - |
| 9 | Trimixing on RCC surface | - | Sqm | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.45 MB
BOQ_2119371.xls
BOQ • 0.34 MB
TD.pdf
Tender Documents • 2.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .