| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance GSTIN: 05AANCS0855K1Z1176 RACE COURSE DEHRADUN | BAGESHWAR | UTTARAKHAND | 263619 | ₹1.2 Cr | L1 | Accepted-Finance QUALIFIED |
| 2 | L2₹1.2 CrRejected-Finance GSTIN: 05AIEPB1542NIZJVILLAGE MANDOW TEHSIL JOSHIYARA DISTT UTTARKASHI | UTTAR KASHI | UTTARAKHAND | 249128 | ₹1.2 Cr | L2 | Rejected-Finance DISQUALIFIED BIDDER |
| 3 | L3₹1.2 CrRejected-Finance GSTIN: 05ABAPJ7834J1ZN, 05ABGFP4244G1ZD | ₹1.2 Cr | L3 | Rejected-Finance DISQUALIFIED BIDDER |
| 4 | L4₹1.5 CrRejected-Finance 1 2 | ₹1.5 Cr | L4 | Rejected-Finance DISQUALIFIED BIDDER |
| 5 | L5₹1.6 CrRejected-Finance GSTIN: 05AENPN2998F1Z2LINE JEEVANGARH AMBARI DISTT DEHRADUN | ₹1.6 Cr | L5 | Rejected-Finance DISQUALIFIED BIDDER |
| Sl No | Description | Qty | Unit | M/S SATISH KUMAR L6 | M/S KUNWAR SINGH NEGI L5 | daya sankar baluni L2 | Parag Jain L3 | Shiv Pratap Singh Pundir L4 | Shivalik Infraventures (P) Limited L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m Rubble Stone Masonry in Cement Mortar | 488 | Cum | 398.8 ₹1.9 L | 392.82 ₹1.9 L | 287.14 ₹1.4 L | 291.12 ₹1.4 L | 358.92 ₹1.8 L | 284 ₹1.4 L |
| 2.00 | Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per Technical Specification Clause 202. | 6,237 | Sqm | 21.5 ₹1.3 L | 21.18 ₹1.3 L | 15.48 ₹96,548.76 | 15.69 ₹97,858.53 | 19.35 ₹1.2 L | 15.33 ₹95,613.21 |
| 3.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 1,322 | Cum | 400.8 ₹5.3 L | 394.79 ₹5.2 L | 288.58 ₹3.8 L | 292.5 ₹3.9 L | 360.72 ₹4.8 L | 285.93 ₹3.8 L |
| 4.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 8 gauge BWG GI wire conforming to IS: 280 & IS:4826 in 150mm x150mm mesh laid with stone boulders weighing not less than 25 kg each. | 452 | Cum | 1,901.2 ₹8.6 L | 1,872.68 ₹8.5 L | 1,368.86 ₹6.2 L | 1,388 ₹6.3 L | 1,711.08 ₹7.7 L | 1,356.31 ₹6.1 L |
| 5.00 | Providing concrete for plain /reinforced concrete in open foundation (P.C.C. grade M 10) Nominal Mix 1:3:6 | 660 | Cum | 5,644.9 ₹37.3 L | 5,560.23 ₹36.7 L | 4,064.33 ₹26.8 L | 4,120 ₹27.2 L | 5,080.41 ₹33.5 L | 4,027.07 ₹26.6 L |
| 6.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204.Random rubble masonry. In cement mortar (1:5) | 990 | Cum | 4,225 ₹41.8 L | 4,161.62 ₹41.2 L | 3,042 ₹30.1 L | 3,084 ₹30.5 L | 3,802.5 ₹37.6 L | 3,014.11 ₹29.8 L |
| 7.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets, scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work | 119 | Cum | 2,252.5 ₹2.7 L | 2,218.71 ₹2.6 L | 1,621.8 ₹1.9 L | 1,644 ₹2.0 L | 2,027.25 ₹2.4 L | 1,606.57 ₹1.9 L |
| 8.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 7,907 | Cum | 80.8 ₹6.4 L | 79.59 ₹6.3 L | 58.18 ₹4.6 L | 59 ₹4.7 L | 72.72 ₹5.7 L | 57.64 ₹4.6 L |
| 9.00 | Providing concrete for plain /reinforced concrete in open foundation (P.C.C. grade M 20) Nominal Mix 1:2:4 | 900 | Cum | 6,172.1 ₹55.5 L | 6,079.52 ₹54.7 L | 4,443.91 ₹40.0 L | 4,505.6 ₹40.6 L | 5,554.89 ₹50.0 L | 4,403.17 ₹39.6 L |
| 10.00 | 15 mm thick cement plaster in 1:4 i/c all cost of labour, material, T&P etc. | 720 | Sqm | 199.5 ₹1.4 L | 196.51 ₹1.4 L | 143.64 ₹1.0 L | 146 ₹1.1 L | 179.55 ₹1.3 L | 142.32 ₹1.0 L |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
14 May 2026, 5:00 pmClosed
SANJAY RAJ
Office of Superintending Engineer Irrigation Works Circle Maharani bagh G M S Road, Dehradun
Project for renovation of Chiliyon Canal in Vikasnagar Block of Distt. Dehradun (Reach 0.00 to 6.875 Km.)
2026_IRDCE_95110_1
03/SE/2026-27
Open Tender
Civil Works - Canal
180 days
VIKASNAGAR
REQUIRED DETAILS TO BE FILLING AS PER STANDARD BIDDING DOCUMENT
4 documents required · 4 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION
₹3.9 L
23 May 2026
5 May 2026
15 May 2026
5 May 2026
14 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m Rubble Stone Masonry in Cement Mortar | 488 | Cum | - | - |
| 2 | Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per Technical Specification Clause 202. | 6,237 | Sqm | - | - |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 1,322 | Cum | - | - |
| 4 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 8 gauge BWG GI wire conforming to IS: 280 & IS:4826 in 150mm x150mm mesh laid with stone boulders weighing not less than 25 kg each. | 452 | Cum | - | - |
| 5 | Providing concrete for plain /reinforced concrete in open foundation (P.C.C. grade M 10) Nominal Mix 1:3:6 | 660 | Cum | - | - |
| 6 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204.Random rubble masonry. In cement mortar (1:5) | 990 | Cum | - | - |
| 7 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets, scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work | - | Cum | - | - |
| 8 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 7,907 | Cum | - | - |
| 9 | Providing concrete for plain /reinforced concrete in open foundation (P.C.C. grade M 20) Nominal Mix 1:2:4 | 900 | Cum | - | - |
| 10 | 15 mm thick cement plaster in 1:4 i/c all cost of labour, material, T&P etc. | 720 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
Tendernotice_2.pdf
PDF • 0.44 MB
Tendernotice_3.pdf
PDF • 3.36 MB
BOQ_112474.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid