Loading…
Loading…
Tender Value
₹7.1 L
EMD Value
₹8,000
Closing Date
10 Jul 2026, 6:00 pm2d left
Office of the Executive Engineer, Bhavnagar Irrigation Division, Bhavnagar
Installation of various instruments at Lakhanka and Hamirpara Irrigation Scheme
318249
8 For 2026-27
Open
Instrumentation - All
Bhavnagar
8 documents required · 7 mandatory · 1 optional
₹900
EXECUTIVE ENGINEER, BHAVNAGAR IRRIGATION DIVISION BHAVNAGAR
₹8,000
26 Jun 2026
26 Jun 2026
26 Jun 2026
10 Jul 2026
26 Jun 2026
MEMORANDUM SHOWING ITEMS OF WORK TO BE CARRIED OUT
It. Qty. Description of Item. Estimated Unit Amount
Providing, Supplying, installing, testing, and
commissioning of a V-Notch Weir (Mechanical
Flow Measuring Device) for measuring low flow
seepage in dams. The device shall have a notch
angle of 22.5°, 45°, 60°, or 90° depending on
discharge range, a stainless steel SS-304 / SS-316
plate with thickness of 3–5 mm, and be suitable for
1 measurement ranges of approximately 0–50 L/s
depending on notch angle. The weir shall have
±1% full-scale reading accuracy, operate under
5–100% humidity, temperature −20°C to +60°C,
and provide corrosion protection through anti-
corrosion finish. Complete in all respects as
directed by the Engineer-in-Charge.
(1) 90° V-NOTCH-20 X 40 Secticin 15 Lit/Sec
Providing, installing and commissioning
permanent Ground Control Point (GCP) Settlemnt
Marker comprising MS base plate (250×250×5 mm
conforming to IS 2062), GI riser pipe 25 mm dia
(medium class as per IS 1239), sand filling (clean
river sand, loose), optional PVC/GI outer casing
(min 100 mm dia), precast concrete cover (M20,
2 32 500×500×50 mm with central hole), MS/GI 10000 Nos.
reference cap, and painting in black & white
checkerboard pattern using weather-resistant
enamel paint, complete with excavation,
installation, alignment, and all materials, labour,
tools, and accessories, suitable for survey works
using Total Station / drone survey, complete as
per specifications and direction of Engineer-in-
Providing & Laying in position 'NOMINAL MIX'
cement concrete using cement sand and crushed
30.582 aggregate by machine mix incl. necessary
3 formworks ,centering ,scaffolding compaction by 3822.00 m3
mechanical vibrator curing as directed with all
lead & lift etc.
C) Concrete grade 1:2:4 and MSA-40mm(Graded)
I/We am/are willing to carry out the work at above/below (should be written in figures and words) of
the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated Amount *Estimated Amount
Put to tender ………….Rs. Put to tender …….Rs.
Deduct. % below Rs. Add.......% above. Rs.................
1) All work shall be carried out as per Public Works Department Hand book and other
specifications of Division or as directed.
2) All the columns of Schedule should be filled in ink and t e total of the entries in the last column
should be struck by the contractor under his signature.
3) Rates quoted include clearance of site (prior commencement of work and at its close) in all.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Ite Description of Item (with Quantity Unit Rate Amount
m brief specification and In
No reference to book of figure
specifications) s
Attached Separately
I/We am/are willing to carry out the work at… % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Ite Description of Item Quantity Unit Rate Amount
m (with brief specification
No and reference to book In In
of specifications) figure Word
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Signature of Contractor Irrigation Sub division Bhavnagar Irrigation Division
Bhavnagar Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Installation of various instruments Hamirpara Lakhanka.pdf
BOQ.pdf
Tender Notice No.08 of 2026-27.pdf
Download all tender documents and submit your bid