Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,120Admitted-Finance | ₹87,120 | L1 | Admitted-Finance |
| 2 | L2₹1.1 L+₹23,360 (26.8%)Admitted-Finance 161 GROUND FLOOR SHRI SAI ELECTRICALS VITTHAL RUKHMINI TEMPLE ROAD WARD NO 02 AT NANDORI TA SAONER NAGPUR MAHARASHTRA 441112 | NAGPUR | MAHARASHTRA | 441112 | ₹1.1 L+₹23,360 (26.8%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 L+₹36,882.32 (42.3%)Admitted-Finance QTR NO 03 WARD NO 06 MAIN ROAD BAZARPERA WEST CHIRIMIRI PONDI DISTT MCB C G 497773 | WEST CHIRIMIRI | MCB | CHHATTISGARH | 497773 | ₹1.2 L+₹36,882.32 (42.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAMEER ELECTRICAL L1 | SHREE SAI ELECTRICALS L2 | M/S SHASHI REWINDERS L3 |
|---|---|---|---|---|---|---|
| 1.00Rewinding of 250 KVA Oil Cooled Transformer 3.3kV/433V of Chirimiri OCM | ||||||
| 1.10 | 99.96% electrolytic copper conductor DPC for primary coil 10 SWG | 132 | Kg | 950 ₹1,25,400 | 1,050 ₹1,38,600 | 435.2 ₹57,446.4 Lowest |
| 1.20 | Re-insulation & re-coiling of damaged secondary winding | 88 | Kg | 70 ₹6,160 | 30 ₹2,640 Lowest | 114.4 ₹10,067.2 |
| 1.30 | Other Insulation materials cost (@15% of Sl. No. 1.1 to 1.2) | 1 | Job | 5,000 ₹5,000 Lowest | 5,000 ₹5,000 Lowest | 10,127.04 ₹10,127.04 |
| 1.40 | Labour Charges (@10% of Sl. No. 1.1 to 1.3) | 1 | Job | 3,000 ₹3,000 Lowest | 5,000 ₹5,000 | 7,764.06 ₹7,764.06 |
| 1.50 | Less Scrap Material (-) (to be subtracted) | 132 | Kg | -750 ₹-99,000 | -750 ₹-99,000 | -220 ₹-29,040 |
| 1.60 | Testing & Supervision Charges @10% of {1.1 to 1.5} | 1 | Job | 3,000 ₹3,000 Lowest | 3,000 ₹3,000 Lowest | 5,636.46 ₹5,636.46 |
| 2.00Rewinding of 250 KVA Oil Cooled Transformer 3.3kV/550V of Chirimiri OCM | ||||||
| 2.10 | 99.96% electrolytic copper conductor DPC for primary coil 10 SWG | 132 | Kg | 950 ₹1,25,400 | 1,050 ₹1,38,600 | 435.2 ₹57,446.4 Lowest |
| 2.20 | Re-insulation & re-coiling of damaged secondary winding | 88 | Kg | 70 ₹6,160 | 30 ₹2,640 Lowest | 114.4 ₹10,067.2 |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
18 May 2026, 5:00 pmClosed
Staff Officer (EnM), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. West Chirimiri, Distt. MCB (C.G.) 497773
Repairing/Rewinding of 02 Nos. 250 KVA Oil Cooled Transformers of Chirimiri OCM
2026_SECL_359185_1
SECL/CHRM/EM/e-NIT/26-27/12 Dtd. 06.05.2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Chirimiri OCM, Chirimiri Area
As per NIT
4 documents required · 4 mandatory
₹2,300
24 Jul 2026
7 May 2026
19 May 2026
7 May 2026
18 May 2026
8 May 2026
8 May 2026 - 15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rewinding of 250 KVA Oil Cooled Transformer 3.3kV/433V of Chirimiri OCM | |||||
| 1.1 | 99.96% electrolytic copper conductor DPC for primary coil 10 SWG | 132 | Kg | 544 | ₹71,808 |
| 1.2 | Re-insulation & re-coiling of damaged secondary winding | 88 | Kg | 143 | ₹12,584 |
| 1.3 | Other Insulation materials cost (@15% of Sl. No. 1.1 to 1.2) | 1 | Job | 12,658.8 | ₹12,658.8 |
| 1.4 | Labour Charges (@10% of Sl. No. 1.1 to 1.3) | 1 | Job | 9,705.08 | ₹9,705.08 |
| 1.5 | Less Scrap Material (-) (to be subtracted) | 132 | Kg | - | - |
| 1.6 | Testing & Supervision Charges @10% of {1.1 to 1.5} | 1 | Job | 7,045.58 | ₹7,045.58 |
| 2Rewinding of 250 KVA Oil Cooled Transformer 3.3kV/550V of Chirimiri OCM | |||||
| 2.1 | 99.96% electrolytic copper conductor DPC for primary coil 10 SWG | 132 | Kg | 544 | ₹71,808 |
| 2.2 | Re-insulation & re-coiling of damaged secondary winding | 88 | Kg | 143 | ₹12,584 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.84 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_372051.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .