Tender Value
₹21.2 L
EMD Value
₹22,000
Closing Date
4 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Shedhi Irrigation Division Nadiad
Construction of Box Type VRB In Place of Damaged Pipe VRB at Ch.2100 mt of Savli Tank to Dahiyap to Anara to Luni River Drain.
315814
03 of 2026-27
Open
Civil Works - Others
Nadiad
6 documents required · 4 mandatory · 2 optional
₹900
Executive Engineer Shedhi Irrigation Division Nadiad
₹22,000
19 Jun 2026
19 Jun 2026
19 Jun 2026
4 Jul 2026
19 Jun 2026
Bill Of Quantities
Construction Of Box Type VRB In Place Of Damaged Pipe Vrb at Ch: 2100 mt of Savli Tank to Dahiyap to
Name of work :-
Anara to Luni River Drain.
Quantity Unit Item Rate Per Amount
Dewatering the foundation trenches during excavation, laying
180.00 Hp-hr foundation concrete,masonry etc. till completion and diversion of 52.50 Hp-hr
surface and subsurface water etc. complete as directed.
Dismentalling the existing R.C.C. pipes including sorting out and
stacking the useful material of the following diameter including
8.00 Meter 1270.70 Meter
refilling the trenches etc. complete as directed. NP 2 Pipes.
Excavation for foundation in all sorts of soil including yellow sandy
gravelly soils, soft & hard murrum etc. in dry condition including
326.00 Cum depositing the excavated stuff in uniform layers in banks or as and 102.40 Cum
where directed etc. complete for lead upto 500 m and all lift. (BY
Excluding dewatering.
Providing & Laying in position "NOMINAL MIX" cement concrete
using cement, sand and crushed aggregate by mass and machine
mix for C.C./R.C.C work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as directed with all lead 3346.00 Cum
& lift etc complete Without Dewatering and excluding cost of
steel reinforcement. (A)For Foundation
Concrete/General purpose
(a) C.C Nominal Mix M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost of steel
(A) For Footing of column / Abutment / Pier / Bottom slab of
56.00 Cum barrel / Plinth course / Coping/Approach Slab etc. 4190.00 Cum
(a) Concrete grade M-15 and MSA-20 mm
(B) For Pier and Abutments / Wing wall / Head wall / Return
114.00 Cum wall / Dowel Wall etc. 4344.00 Cum
(h) Concrete grade M-15 and MSA-40 mm
(E) For Column / Beam / Solid Slab of Road Bridge / Barrel /
37.00 Cum Cutoff wall etc. 5642.00 Cum
(q) Concrete grade M-25 and MSA - 20 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of
24.00 Cum barrel / Plinth course / Coping / Approach Slab etc. 4651.00 Cum
(e) Concrete grade M-25 and MSA-20 mm
(D) For Kerb / Wearing coat.
(n) Concrete grade M-25 and MSA -10 to 20mm
(F) For Perapet wall of Road Bridge / Structure .
2.00 Cum 8023.00 Cum
(t) Concrete grade M-25 and MSA -10 to 20 mm
Providing & Placing in position reinforcement bars including
cutting, bending, welding joints where necessary, hooking etc.
complete as per drawing for all lead and lifts.
TMT /CRS (FE 500D)
Providing and fixing in position pre-moulded asphalt or bitumen
cork board of approved quality and specifications as per design and
5.00 Sqmt 1286.50 Sqmt
20 mm thickness
Providing and fixing 110 mm diameter P.V.C..Pipe (6 kgf /
3.00 Meter 369.20 Meter
sqcm) Water spout with necessary iron gratting as per design
Providing and laying in position 110 mm dia (6 kgf/sqcm) P.V.C.
18.00 Meter Pipe for weep holes with non corroding jali in abutments, wing 262.50 Meter
walls, retaining walls etc. complete.
Providing and fixing in position P.V.C. heavy duty water stops in
barrels, troughs and wing walls with 25 mm wide expansion joint
as shown in drawing including filling the joints with asphalt pad or
13.00 Meter 587.70 Meter
bitumen cork board of approved quality. (Asphalt pad or bitumen
cork board will be paid seperatly)
(a)225 mm WIDE P.V.C. WATER STOP
Quantity Unit Item Rate Per Amount
Providing and filling the polysulphide joint sealent of the approved
10.00 Meter make in the expansion and contraction joints in the c.c. lining 181.20 Meter
including clearing the joints with air water jet.
Providing temporary all weather and fair weather diversion
suitable for traffic during the construction period of the bridge
1.00 No including providing necessary drains and all safty measures 34790.00 No
including red lamps/ signals at night for traffic etc. comp.
( For R.A. attached)
Excavaion in all sort of soil by machinery incl. preparin etc (where
35.00 hr quantity cannot be measured) Hyundai Long Reach Hydraulic 2901.00 hr
Excavator R 210 LC 7LR (0.52 CM) chainage
Excavaion in all sort of soil by machinery incl. preparing rad etc
35.00 hr (where quantity cannot be measured) Tractor with Trailer, (RA 661.00 hr
as per. Annexure-8)
(Rupees Twenty One Lakh Fifteen Thousand Six Hundred and Fifty one paisa Only/-)
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words…………………………………
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in inkand total of entries in last
column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good for work under all conditions,
site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-24)
Signature of agency Tender Clerk Deputy Executive Engineer
Shedhi Irrigation Division Drainage Sub Division
Executive Engineer Divisional Accoutant
Shedhi irrigation Division Shedhi Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. SBD Dahiyap 2100 mt.pdf
02. Schedule B.pdf
03._Item_wise_specification - Dahiyap 2100.pdf
04. GENERAL CONDITIONS.pdf
05. WORK AND SITE CONDITIONS.pdf
06. SPECIFICATIONS FOR MATERIALS.pdf
07 Drawing Dahiyap.pdf
08.Tender Notice No.03 of 2026-27.pdf
Download all tender documents and submit your bid