Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LQualified Make: REE
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | Make: REE
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | L1 | Qualified MII | |
| 2 | L2₹8.4 L+₹1.0 L (14.0%)Qualified Make: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | Make: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | L2 | Qualified MII | |
| 3 | L3₹8.8 L+₹1.4 L (19.4%)Qualified Make: GEM/2025/B/5814701
Model: GEM/2025/B/5814701
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | Make: GEM/2025/B/5814701
Model: GEM/2025/B/5814701
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | L3 | Qualified MII | |
| 4 | L4₹9.5 L+₹2.1 L (29.0%)Qualified Make: NA
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | Make: NA
Model: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE
Title: OVERHAULING /CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES | L4 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
13 Feb 2025, 1:00 pmClosed
OVERHAULING/CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES
REPAIR/MANUFACTURING OF ASTERN FUEL COUPLING FOR UNDERTAKING FUELLING WITH NON VESSELS
REPAIR REFURBISHMENT OF GTG NYLON FILTERS AS PER SAMPLE VIEW DETERIORATED
7370847
GEM/2025/B/5814701
Two Packet Bid
OVERHAULING/CALIBRATION OF 4TH STAGE RELIEF VALVE
30 days
Visakhapatanam, Andhra Pradesh
Total value wise evaluation
PRODUCT_CUSTOM
7 documents required · 7 mandatory
3 yrs
₹3
30%
Exempted
23 Jan 2025
23 Jan 2025
13 Feb 2025
OVERHAULING/CALIBRATION OF 4TH STAGE RELIEF VALVE OF HPAC -3 IN AER VIEW DEFECTIVE ( OPERATING PRES
REPAIR/MANUFACTURING OF ASTERN FUEL COUPLING FOR UNDERTAKING FUELLING WITH NON VESSELS
REPAIR REFURBISHMENT OF GTG NYLON FILTERS AS PER SAMPLE VIEW DETERIORATED
REPAIR/REFURBISHMENT OF GTG NYLON FILTERS AS PER SAMPLE VIEW DETERIORATED
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7370847.pdf
GEM_BID
specifications_equipment-1_2025-01-13-13-06-31_bd4996b341e396c345b7f22ca0149e7d.pdf
SPECIFICATION
specifications_equipment-1_2025-01-13-13-09-52_4b528abf7d53aed823aec75fe3c54f6e.pdf
SPECIFICATION
specifications_equipment-1_2025-01-13-13-05-22_df4e5c4af551bcc83ecc3d76e2a8b7ab.pdf
SPECIFICATION
1736758972.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .