| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-AOC | ₹24.4 L Quoted ₹28.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹37.0 LRejected-AOC KRISHNAKRIPA KOTTARAKARA | ₹37.0 L | 2 | Rejected-AOC L2 |
| 3 | 3₹52.7 LRejected-AOC | ₹52.7 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | K K Associates L2 | DSK ELECTRIC POWER L3 | NASEEMA BEEVI A L1 |
|---|---|---|---|---|---|---|
| 1.00Civil and Mechanical works (Part-A) | ||||||
| 2.00Dismantling of following exhaust pipe of DG sets and related accessories with atmost care and support from the existing location and dismembering and stacking not more than 200 metres lead without any damage in the existing system as per site conditions and instructions from Technopark. | ||||||
| 2.10 | 6" dia MS Pipe with related accessories | 13 | Mtr | 1,000 ₹13,000 | 2,714 ₹35,282 | 554.06 ₹7,202.78 |
| 2.20 | 8" dia MS Pipe with related accessories | 21 | Mtr | 1,500 ₹31,500 | 3,186 ₹66,906 | 619.5 ₹13,009.50 |
| 3.00 | Dismantling of MS Supporting structure fabricated out of MS angles (ISA) and MS flats, Existing DG Yard steel work in built up sections in angles, tees, flats, channels etc. including all gusset plates, bolts, nuts, cutting riverts, welding ,water channel etc. including dismembering and stacking within 200 metres lead without any damage in the existing system and as per site conditions and instructions from Technopark. | 3,000 | kg | 100 ₹3 L | 81 ₹2.4 L | 10.62 ₹31,860 |
| 4.00 | Dismantling of existing DG Yard roofing including GS sheets, ridges, hips, valleys and gutters etc., and stacking the material within 200 metres lead without any damage in the existing system and as per site conditions and instructions from Technopark. | 320 | sqm | 150 ₹48,000 | 253 ₹80,960 | 221.25 ₹70,800 |
| 5.00 | Dismantling of the existing silencer with associated accessories of the 500kVA DG Sets. The process will be executed with utmost care and precision to ensure no damage to the components. Following dismantling, the silencer pipe will be systematically stacked at a designated location within 200 meters, adhering to the instructions provided by Technopark. | 2 | Nos | 60,000 ₹1.2 L | 78,470 ₹1.6 L | 8,260 ₹16,520 |
| 6.00 | Dismantling of existing acoustic enclosure with associated equipment of the 500kVA DG Sets with atmost care and supports without any damage of the acoustic enclosure and existing system. Following dismantling, the acoustic enclosure will be systematically stacked at a designated location within 200 meters by mechanical means, adhering to the instructions provided by Technopark. | 2 | Nos | 1,00,000 ₹2 L | 78,470 ₹1.6 L | 46,020 ₹92,040 |
| 7.00 | Dismantling of the existing 990-litre capacity Fuel Oil Tank (Day Tank) made of steel along with heavy diesel fuel line pipe. The work also includes the disconnection and removal of the 25mm heavy diesel fuel line pipe (approximate 57 meter) and related equipment from the DG set to the fuel tank. The entire process will be executed with utmost care and support to prevent any damage. Following dismantling, the fuel tank and fuel pipe will be systematically stacked at a designated location within 200 meters, adhering to the instructions provided by Technopark. | 3 | Nos | 60,000 ₹1.8 L | 70,800 ₹2.1 L | 10,620 ₹31,860 |
| 8.00 | The Dismantling, shifting and commissioning of the 500 kVA Generator Sets(include alternator diesel engine, radiator etc with all accesories) from existing location to the newly constructed site near the Gayarti substation involves lifting by mechanical means and refixing of the existing Engine, Alternator and Radiator, along with the DG auto control panel, Battery with battery stand, and related accessories etc. Both the engine and alternator will be mounted on the existing base frame made of MS channel, including the required nut, bolts, plates, channels, angles, and other accessories as per the specified requirements. Additionally, necessary vibration isolation arrangements will be implemented as needed. Proper rectification works, civil works (excluding DG foundation), along with all other necessary tasks for the engine, alternator, and radiator, confirming to all the IS/IES/Manufactural standards, site conditions and adhering to the instructions provided by Technopark. | 2 | Nos | 1,50,000 ₹3 L | 1,95,880 ₹3.9 L | 49,560 ₹99,120 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
1 Aug 2024, 3:00 pmClosed
Chief Executive Officer
Park Centre Technopark Phase I Campus Thiruvananthapuram
Shifting of 3 nos of DG Sets at Gayathri Building, Technopark Phase-I Campus.
2024_ETPK_680387_1
ETPK/PH-I/2024-25/E-03
Open Tender
Electrical Works
60 days
Gayatri Building Technopark Phase I Campus
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹50,000
3 Jun 2026
12 Jul 2024
2 Aug 2024
12 Jul 2024
1 Aug 2024
12 Jul 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1058308.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid