| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.2 L+₹82,230.29 (2.71%)Rejected-AOC KOOTHATTUKULAM | THIRUVANANTHAPURAM | KERALA | 695001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹32.7 L+₹2.4 L (7.85%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Jerin J Royees L3 | Sainudheen P K L1 | DELEEP KUMAR N M L2 |
|---|---|---|---|---|---|---|
| 1.00Building | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 373.91 | sqm | 18 ₹6,730.38 | 16.29 ₹6,090.99 Lowest | 16.74 ₹6,259.25 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 55.02 | cum | 348 ₹19,147.66 | 322.3 ₹17,733.59 Lowest | 330.94 ₹18,208.98 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.96 | cum | 7,690 ₹1,15,057.78 | 7,107.86 ₹1,06,347.8 Lowest | 7,298.26 ₹1,09,196.57 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 99.85 | sqm | 374 ₹37,344.65 | 345.99 ₹34,547.79 Lowest | 355.27 ₹35,474.42 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 8.1 | sqm | 970 ₹7,857 | 903.66 ₹7,319.65 Lowest | 927.87 ₹7,515.75 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 97.95 | sqm | 740 ₹72,481.52 | 683.54 ₹66,951.38 Lowest | 701.85 ₹68,744.8 |
| 1.01 | OD306046/2024-2025:Providing and laying in position machine batched and machine mixed design mix M30 Grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS:9103 to accelerate , retard setting of concrete , improve work ability without impairing strength and durability as per direction of Engineer-in-charge. Note :- minimum cement content considered in this item is @ 340kg/cum.All work up to plinth level - Excess or less cement used as per design mix is not payable /recoverable . | 25.71 | cum | 10,645 ₹2,73,672.31 | 9,834.4 ₹2,52,832.59 Lowest | 10,097.83 ₹2,59,605.11 |
| 1.01 | OD306048/2024-2025:Providing and laying in position machine batched and machine mixed design mix M 30 grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS:9103 to accelerate , retard setting concrete , improve work ability without impairing strength and durability as per direction of Engineer - in - charge . Note :- Cement content considered in this item is @ 340 kg/cum .All work above plinth level up to floor V level Excess or less cement used as per design mix is not payable / recoverable . | 19.71 | cum | 12,400 ₹2,44,428.8 | 11,659.48 ₹2,29,831.67 Lowest | 11,971.79 ₹2,35,987.92 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,956.53 | kilogram | 110 ₹3,25,218.85 | 100.73 ₹2,97,811.77 Lowest | 103.44 ₹3,05,823.98 |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
3 Sept 2025, 5:00 pmClosed
Executive Engineer PWD Building Division Alappuzha
Executive Engineer PWD Building Division Alappuzha
GENERAL Smart Village Office Aroor Construction of New Building General Civil Work
2025_PWD_791124_1
PWD/BLDG/7584/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
365 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
13 Nov 2025
25 Aug 2025
10 Sept 2025
25 Aug 2025
3 Sept 2025
25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1304251.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .