| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance OPP GOVT PRIMARY SCHOOL VILL MAHUA KHERI P O SHAHPUR NURHAD AMBALA 134203 | AMBALA | AMBALA | HARYANA | 134203 | L1 | Accepted-Finance ok | |
| 2 | L2₹1.7 L+₹2,887.24 (1.72%)Accepted-Finance | L2 | Accepted-Finance ok |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
6 Oct 2026, 3:00 pmClosed
Kailash Chander Kala ravi kumar and Vivek Sharma
DIV Ambala
A Mtc of EPHS in Sector 34 UE Ambala Cantt Cleaning of sewer manhole and line removing of silt sludge and construction of manhole complete in all respect and all other works contingent thereto
2026_HBC_551593_1
20269EE0455E 366A 44DC 9805 2217D27EE8AA239HSV
Open Tender
Civil Works
Works
30 days
Ambala City
2 documents required · 2 mandatory
₹250
₹3,380
Yes
12 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 50.9 | Sqm | 147 | ₹7,482.3 |
| 2 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | 4 | Each | 1,058 | ₹4,232 |
| 3 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | 50 | cum | 78 | ₹3,900 |
| 4 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 3,476 | ₹3,476 |
| 5 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 5 | cum | 2,442 | ₹12,210 |
| 6 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4.88 | cum | 4,374 | ₹21,345.12 |
| 7 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 13.5 | Sqm | 208 | ₹2,808 |
| 8 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 225 | Kg. | 66 | ₹14,850 |
| 9 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 11.88 | cum | 4,128 | ₹49,040.64 |
| 10 | Engaging sewer suction tanker (5000 Ltr Capacity) with tractor and driver, fuel all repair maintenance including insurance of driver, labour machinery etc complete in all respect with the entire satisfaction of Engineer-in-charge. | 9 | Each | 5,500 | ₹49,500 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_631414.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .