Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹26.3 L
EMD Value
₹53,000
Closing Date
20 Jun 2019, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, MECHANICAL DIVISION, UTTARAKHAND PEYJAL NIGAM, KOTDWAR
Construction of Tubewell at Jamalpur Khurd Block Bahaderabad, Distt- Haridwar
2019_MDPEY_18072_1
1320
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Item Rate
90 days
Jamalpur Bahadrabad
As per NIT
3 documents required · 3 mandatory
₹2,360
EE MECH DIVN UKPJN KOTDWAR
₹53,000
23 Jan 2020
7 Jun 2019
21 Jun 2019
7 Jun 2019
20 Jun 2019
10 Jun 2019
Amount
Transportation of Rig Machine, Air compressor O.P unit camp equipages, connected T&P & necessary material required for drilling up to Jamalpur Khurd of work, including loading, unloading etc. complete.
Errection and Leveling of Rig Machine at site of work
Dismantling of Rig Machine & Clearance of site after satisfactory completion of work.
Drilling of borehole from GL to 150 BGL mtr.of minimum pilot bore size 550 mm.after reaming including water arrangement for drilling ,back ashing ,collecting of samples from different strata, prepairing and submitting strata chart etc. complete
Supply of TW assembly and other material as below-
300 mm dia MS ERW fincut 7.9 mm thick Plain pipe
300 mm dia MS ERW fincut 7.9 mm thick slotted pipe
Supply of 300 mm dia, 8 mm thick tubewell cap.
Supply of 300 mm dia M.S.D.I housing clamp completed with two nos. 300mm size M.S.channel with 3000 mm length.
Supply of 300 mm dia Bail plug with nut & U- bolt as required.
Supply of Pea gravel
Preparing & Lowering of tubewell assembly starting from G.L to the required depth including cutting, welding as required at site complete with all T&P required .
Fixing of 300 mm dia bail plug with Nut & U-bolt.
Lowering of 300 mm dia M.S ERW housing pipe (Plain & Slotted pipe) as required.
Fixing of 300 mm dia, 8 mm thick tubewell cap.
Fixing of 300 mm dia M.S.D.I housing clamp completed with two nos. 300mm size M.S.channel with 3000 mm length.
Shrouding of Pea Gravel in between bore & tubewell assembly to the entire depth of tubewell.
Development of tubewell by 350 PSI /1100 CFM Air compressor unit to the satisfaction of Engineer in charge to give a sand free discharge & Proper packing of pea gravel.
Yield test of tubewell by the suitable capacity O.P unit. complete with lowering and lifting of pumping plant.
Chemical & bacteriological testing of water sample
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .