Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹22.5 L
EMD Value
₹45,000
Closing Date
30 Nov 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Approach road for Abhyudya Composite School Building in School Campus at Village-Doongarpur Reelika, Thasrana, Mohmmadpur Jadon, Fatehpur Atta, Dankaur and Bhatta in, YEIDA (Phase-2). Wc-06
2026_YEIDA_1207742_23
YEA/GM(PROJECT)/2026/607 DT-30/10/2026
Open Tender
Civil Works
Fixed-rate
60 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹840
₹45,000
30 Nov 2026
13 Nov 2026
1 Dec 2026
13 Nov 2026
30 Nov 2026
13 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | 134.46 | Cum | 72.8 | ₹9,788.69 |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 24.9 | Cum | 5,820 | ₹1,44,918 |
| 3 | M-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | 34.36 | Cum | 4,950 | ₹1,70,082 |
| 4 | Earth work in cutting or embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm. layers including rernming and dressing the surface to required levels and slopes and also including 1.50M lift and 30M lead. The earth from cutting to be used in making embankment or to be depoiseted as spoil banks with in 30M distance as directed by yhe Engineer incharge.Excluding Royality. Wherever applicable for small work or Abadi area. (Only for where machine can not be reach/Move) SORUPPWD/253A+231A/P-14 | 315 | Cum | 217.8 | ₹68,607 |
| 5 | Construction of Granular Sub-Base by providing close graded material, mixing in mechanical mix plant at OMC, carriage of mixed material to work at site, spreading uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for Grade-1 material. (MORTH/(AR/YEIDA/Based on UPPWD/SOR-2020) | 78.75 | Cum | 3,933.9 | ₹3,09,794.63 |
| 6 | Dry brick on edge flooring in required pattern with bricks of class designation 150 on bed including filling joints with local sand (with F.P.S bricks) complete.(Based on DAR/11.2/SOR-2020) | 1,050 | Sqm | 546.75 | ₹5,74,087.5 |
| 7 | Providing and laying 60mm thick I.S.I. mark factory made cement concrete interlocking concrete paver block made by block making machine with strong vibratory compaction of approved size, design, shape, laid in required colour and pattern over and including average 50mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per the direction of Engineer-in-charge with conforming to IS-15658 and IRC:SP:63. (AR/YEIDA/ Based on UPPWD/SOR-2020) | 1,050 | Sqm | 663.8 | ₹6,96,990 |
| 8 | Cement concrete with 4cm based approved stone ballast coarse sand and cement in the proportion of 4:2:1 including supply of all material labour tools and plants etc required for all completion of work. UPPWD2020/279a/P-17 | 5.73 | Cum | 7,000 | ₹40,110.01 |
| 9 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished curb edging shall be measured for payment). (Precast C.C. curb stone shall be approved by Engineer-in-charge). DAR 2018/16.69/Based on UPPWD/SOR-2020) | 33.62 | Cum | 6,920.96 | ₹2,32,682.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
23.pdf
Tender Documents • 1.38 MB
BOQ_2292893.xls
BOQ • 0.27 MB
628.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .