Loading…
Loading…
32 live18 closing this weekmost from Yamuna Expressway Industrial Development Authority and Infrastructure And Industrial Development Department Uttar
32 results • Latest
Supply and Fixing Swings in Pocket I,J,1A and 1B in Sector-18 and GH-06 Sector-22D YEIDA WC-H
P/o trees and shrubs on 60 mtr wide road along 50 mtr wide green belt along 60 mtr road from Ch. 18.00 km to 20.10 km with two years maintenance, YEIDA WC-H
P/o trees and shrubs on 60 mtr wide road along 50 mtr wide green belt along 60 mtr road from Ch. 15.00 km to 18.00 km with two years maintenance, YEIDA WC-H
D/o Park No. 4, Sector-32 and M/o trees/shrubs on signage boards in different sectors and M/o trees/shrubs on central verge and green belt towards Sector-32 side and remaining length of 100 mtr road between Sector-29 and Sector-33 for two-year mainte
Barbed Wire Fencing Work on 60 mtr Wide Road along 50 mtr Wide Green Belt from Ch. 20.10 km to 23.70 km, YEIDA WC-H
P/o trees and shrubs on 60 mtr wide road along 50 mtr wide green belt along 60 mtr road from Ch. 21.10 km to 22.70 km with two years maintenance, YEIDA WC-H
P/o trees and shrubs along Rabupura Tirthli Road upto Shakti Dwar gate with two years maintenance, YEIDA WC-H
Barbed Wire Fencing Work on 60 mtr Wide Road along 50 mtr Wide Green Belt from Ch. 15.00 km to 20.10 km, YEIDA WC-H
Repair of barbed wire fencing and painting of aluminum paint on barbed wire fencing along 75 mtr wide road central verge, Road No. 13 and 17, between Sector-28, 29 and 32, 33, YEIDA WC-H
Repair of barbed Wire Fencing work of 60 mtr wide Road ch. 7.10km to ch. 13.60km YEIDA WC-H
D/o 04 parks Pocket 5C Sector 18 with two years maintneace yea. WC-H
Construction of C.C. road and RCC drain from Pratap Nagar house to Sachin house and Laying of dry brick (Kharanja) for Kabristan (approach road) in Village-Salarpur, YEA WC-06
Providing and Laying Interlocking Tiles Work at Patiyat Padha from Hema Shop and Brick Drain in Village Tappal, YEA WC-6
Providing and Fixing Interlocking tiles from Village to Shamshan Ghat in Village- Muradgarhi, YEA WC-06
Construction Of C.C. Road and Laying Interlocking tiles both side Patri R C C Drain in village Manchhipur Yeida WC-06
Construction of chabutra and shed for shamshan ghat in Village- Parsol YEA WC-06
Construction of Boundary Wall of Library Campus at Village-Parsol, YEA. WC-06
Facility Management Services - LumpSum Based - Clearing grass and removal of the rubbish up to a distance of 50 m out side the periphery of the area cleared; Horticulture Services; Consumables to be provided by service provider (inclusive in contract.., Facility Management Services - LumpSum Based - Ploughing the existing ground to a depth of 15cm to 25cm and watering the same; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Rough dressing the trenched ground including breaking clods; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Uprooting weeds from the trenched area after 10 to 15 days of its foolding with water including disposal of uprooted vegetation; Horticulture Services; Consumables to be provided by service provider (inc.., Facility Management Services - LumpSum Based - Fine dressing of the ground; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Digging holes in ordinary soil and refilling the same with the Holes 90cm dia, and90cm deep; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Digging holes in ordinary soil and refilling the same with the Shrubs; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Supply of Labour; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Supply of water
Construction of Service road along 130.00mtr Wide Peripherial road Between Sector-7 and 8 yeida Wc-03
Construction of Service road Drain and Sewer Line (Sector-05 Side) long 130.00mtr wide Peripherial road between Sector-10and 5 and Sector- 4 and 5 yeida Wc-03
Construction of Rcc slab Covering of drain Different Places along Pocket-5A,1A,1B,5B and Pocket 5C in Sector-18 YEA WC-1
Construction of C.C road and Interlocking Tiles work in Village-Khwajpur yea (Including Construction of Drain) wc-06
Construction of Service road along 75.00mtr peripheral road (Sector -8 side) Between Sector-7 and 8 and 8 and 8F yeida Wc-03
Request for Proposal RFP for Selection of Consultant for Design and Structural Consultancy Services for the Entry Gate and surrounding area at Chainage 7.1 km of the Yamuna Expressway Industrial Development Authority YEIDAConsultancy Services for th
Construction of Service road on 45.0mtr. wide road different location along pocket-5A, 1A, 1B Between Pocket- 7C and T.S-2, 7B and 7C, 7D along 7F with Maintenance for Five Year in Sector-18 YEA. WC-01
Balance internal development work industrial sector -29 part -B ,YEIDA WC-04
Development work of 7 Abadi plots of village- Acchheja Bujurg Situated at Doongarpur Reel kha, YEIDA.WC-01
Development work of village .parsol (majra- bagh) to be develop as smart village ,YEA.WC-6
Providing and laying drain and sewer line in sector -10 YEA .WC-02
Development work for 7 Abadi plots of village salarpur yeida. WC-03
Request for Proposal (RFP) for Constituting Panel of Chartered Accountants for conducting Statutory Audit for development of International Film City in YEIDA
Request for Proposal (RFP) for Selection of Agency for Conducting Independent Engineer Services for development of International Film City in YEIDA