Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.2 Cr
EMD Value
₹22.2 L
Closing Date
30 Nov 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development work for 7percent abadi plots of Village-Kherlibhav Wc-02.
2026_YEIDA_1209379_2
YEA/GM(PROJECT)/2026/612 DT-06/11/2026
Open Tender
Civil Works
Fixed-rate
365 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents
5 documents required · 5 mandatory
₹6,770
₹22.2 L
17 Nov 2026
17 Nov 2026
1 Dec 2026
17 Nov 2026
30 Nov 2026
17 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning grass and removal of the rubbish up to a distance of 50m Outside the periphery of the area cleared DAR-18/2.32 | 53,784 | Sqm | 3.1 | ₹1,66,730.4 |
| 2 | Supplying and laying of good earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, | 36,307.69 | Cum | 352.4 | ₹1,27,94,829.96 |
| 3 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). | 4,699.19 | Cum | 9.59 | ₹45,065.23 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres. | 17,936.23 | Sqm | 83.65 | ₹15,00,365.64 |
| 5.01 | Supplying and Stacking at site.. 90 mm to 45 mm size stone aggregate. (SOR 18/16.3.1) | 3,370.95 | Cum | 2,518.13 | ₹84,88,490.32 |
| 5.02 | Supplying and Stacking at site.. 63 mm to 45 mm size stone aggregate. (SOR 18/16.3.2) | 2,887.43 | Cum | 2,571.56 | ₹74,25,199.49 |
| 5.03 | Supplying and Stacking at site.. 53 mm to 22.4 mm size stone aggregate. (SOR 18/16.3.3) | 2,371.86 | Cum | 2,635.44 | ₹62,50,894.72 |
| 6 | Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate watering and compacting to the required density SOR-18/16.4 | 8,630.24 | Cum | 381.06 | ₹32,88,639.25 |
| 7 | Supplying and stacking at site Moorum (SOR 18/16.3.10) | 1,726.05 | Cum | 2,602.92 | ₹44,92,770.07 |
| 8 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With bricks of class designation 150 SOR-18/16.7.1 | 8,842 | Mtr | 139.95 | ₹12,37,437.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
2.pdf
Tender Documents • 1.52 MB
BOQ_2296353.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .