Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹42.8 L
EMD Value
₹85,600
Closing Date
30 Nov 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Room and Boundary wall and Repair for Shamshan Sthal in Village-Rustampur, YEA. Wc-06
2026_YEIDA_1207742_19
YEA/GM(PROJECT)/2026/607 DT-30/10/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹1,020
₹85,600
30 Nov 2026
13 Nov 2026
1 Dec 2026
13 Nov 2026
30 Nov 2026
13 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | 144 | Cum | 72.8 | ₹10,483.2 |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 20.2 | Cum | 5,820 | ₹1,17,564 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (DAR 5.1.2/ UPPWD SOR 2020) | 45.67 | Cum | 7,743 | ₹3,53,622.81 |
| 4 | Reinforced Cement concrete work in walls (any Thickness ), including attatched Pilasters, Buttresses, plinth and String courses , fillets , columns, pillars piers, abutments , posts and struts etc. upto Floor V Level, Excluding the cost of Centring , Shuttring, Finishing and Reinforcement: (Cast in situ) 1:1.5:3 (1 Cement : 1.5Coarse Sand: 3 Graded Stone Aggregete 20mm Nominal Size) (DAR 5.2.2/ UPPWD SOR 2020) | 37.3 | Cum | 8,622.7 | ₹3,21,626.71 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for all heights : | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 76.44 | Sqm | 181.65 | ₹13,885.33 |
| 5.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 33.6 | Sqm | 300.7 | ₹10,103.52 |
| 5.03 | Columns, Pillars, Piers, Abutments, Posts and Struts. (DAR/5.9.6/Based on UPPWD/SOR-2020)) | 147.53 | Sqm | 426.8 | ₹62,965.8 |
| 5.04 | Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR-2020)) | 131.73 | Sqm | 386.35 | ₹50,893.89 |
| 5.05 | Edges of slabs and breaks in floors and walls: Under 20 cms wide. (DAR/5.9.16.1/Based on UPPWD/SOR-2020) | 602.8 | Mtr | 127.4 | ₹76,796.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
19.pdf
Tender Documents • 1.38 MB
BOQ_2292818.xls
BOQ • 0.39 MB
628.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .