Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
26 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of C.C. Main Road Kadalpur to Jahnawad and RCC Drain in Village-Kadalpur, YEA. Wc-06
2026_YEIDA_1207742_41
YEA/GM(PROJECT)/2026/607 DT-30/10/2026
Open Tender
Civil Works
Fixed-rate
150 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹3,010
₹3.7 L
16 Nov 2026
16 Nov 2026
27 Nov 2026
16 Nov 2026
26 Nov 2026
16 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of atoms. lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m all kind of soil. (AR/YEIDA/Based on UPPWD/SOR-2020) 0-1.50M B.G.L | 641.03 | Cum | 72.8 | ₹46,666.98 |
| 2 | Cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including supply of all material labour tools and plants etc required for all complation of work. UPPWD/SOR/281/P-17 | 224.1 | Cum | 5,820 | ₹13,04,262 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (DAR 5.1.2/ UPPWD SOR 2020) | 433.51 | Cum | 7,743 | ₹33,56,667.93 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) | 51,045.21 | Kg | 77.04 | ₹39,32,522.98 |
| 5 | "Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,mixed a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needie, screed and plate vibrators and| finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including all taxes, material, T&P, Machinary. royalty, labour cess all taxes complete. Excluding GST as per E/l." | 888 | Cum | 8,146.7 | ₹72,34,269.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 333 | Sqm | 181.65 | ₹60,489.45 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DAR/5.9.2/Based on UPPWD/SOR-2020)) | 3,596.4 | Sqm | 335.55 | ₹12,06,772.02 |
| 6.02 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR-2020)) | 14 | Sqm | 386.35 | ₹5,408.9 |
| 6.03 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Edges of slabs and breaks in floors and walls: Under 20 cms wide. (DAR/5.9.16.1/Based on UPPWD/SOR-2020) | 62.4 | Mtr | 127.4 | ₹7,949.76 |
| 7 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. UP PWD SOR 2020/ DAR-18/10.25.2 | 730.22 | Kg | 101.1 | ₹73,825.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
41.pdf
Tender Documents • 1.58 MB
BOQ_2295121.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .