Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹50.2 L
EMD Value
₹1.0 L
Closing Date
27 Nov 2026, 5:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and Fixing Interlocking tiles in Village-Bhaipur Bharmnan YEA(Including Construction of Drain) Wc-06
2026_YEIDA_1204190_19
YEA/GM(PROJECT)/2026/600 DT-24/10/2026
Open Tender
Civil Works
Fixed-rate
60 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹1,690
₹1.0 L
27 Nov 2026
3 Nov 2026
30 Nov 2026
3 Nov 2026
27 Nov 2026
3 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of good earth work banking excavated earth in layers not exceeding 20 cm in depth breaking clods watering rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide banks or filling up ground depressions all lead as per (a.r.) for all kind of soils | 1,073.4 | Cum | 217.8 | ₹2,33,786.52 |
| 2 | Dry brick on edge flooring in required pattern with brick of class designation 150 on bed including filling joints with local sand (with F.P.S. bricks) complete | 1,944 | Sqm | 546.75 | ₹10,62,882 |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) | 208.5 | Cum | 3,933.9 | ₹8,20,218.15 |
| 4 | Providing and laving 60 mm thick factory made cement concrete Interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming (UP PWD SOR 2020) (New SOR Based DAR 16.68) | 2,780 | Sqm | 663.8 | ₹18,45,364 |
| 5 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/281) | 11.39 | Cum | 5,820 | ₹66,289.8 |
| 6 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a) | 121.79 | Cum | 4,950 | ₹6,02,860.5 |
| 7 | 12mm cement plaster of mix:
1:6 (1 cement : 6 coarse sand) (DAR/13.4.2/Based on UPPWD/SOR-2020) | 344.25 | Sqm | 164.8 | ₹56,732.4 |
| 8 | Cement concrete with 2cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/279(a)) | 31.11 | Cum | 7,000 | ₹2,17,770 |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020)) | 6.57 | Cum | 7,743 | ₹50,871.51 |
| 10.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors roof landings balconies and access platform (DAR/5.9.2/Based on UPPWD/SOR-2020)) | 15 | Sqm | 386.35 | ₹5,795.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2281370.xls
BOQ • 0.26 MB
19.pdf
Tender Documents • 1.38 MB
620.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .