| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC THE LOWEST BIDDER | |
| 2 | L2₹21.2 L+₹3.9 L (22.8%)Rejected-Finance | L2 | Rejected-Finance Other than the lowest bidder | |
| 3 | L3₹21.5 L+₹4.3 L (24.9%)Rejected-Finance | L3 | Rejected-Finance Other than the lowest bidder |
| Sl No | Description | Qty | Unit | SDG CONSTRUCTIONS L2 | SRI LAKSHMI GANAPATHI CONSTRUCTIONS L1 | LAKSHMI NARASIMHA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Taking up or down 15 mm bore steel tubing and connections complete all as specified and directed. | 15 | RM | 45 ₹675 | 10 ₹150 Lowest | 50 ₹750 |
| 2.00 | S&F of 20 mm outer diameter CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified complete all as specified and as directed. | 15 | RM | 90 ₹1,350 Lowest | 150 ₹2,250 | 100 ₹1,500 |
| 3.00 | Taking up or down 20 mm bore steel tubing and connections complete all as specified and directed. | 30 | RM | 55 ₹1,650 | 7 ₹210 Lowest | 60 ₹1,800 |
| 4.00 | S&F of 25 mm outer diameter CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified complete all as specified and as directed. | 30 | RM | 100 ₹3,000 Lowest | 150 ₹4,500 | 110 ₹3,300 |
| 5.00 | S&F Rotational moulded polythene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position of capacity 500 Ltrs including dismatling of old unserviceable one complete all as specified and directed. | 2 | EACH | 5,000 ₹10,000 | 4,337 ₹8,674 Lowest | 5,500 ₹11,000 |
| 6.00 | S&F Rotational moulded polythene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position of capacity 1000 Ltrs including dismatling of old unserviceable one complete all as specified and directed. | 4 | EACH | 8,000 ₹32,000 | 7,997 ₹31,988 Lowest | 8,200 ₹32,800 |
| 7.00 | Demolition of brick work or stone / boulder masonry, built in cement mortar including all quoins, pillars etc stacking the serviceable bricks after removing mortar and cleaning for re-use and disposal of debris and rubbish to a distance n.exc 100m complete all as specified and directed. | 6 | CUM | 700 ₹4,200 | 97 ₹582 Lowest | 750 ₹4,500 |
| 8.00 | M & L for Brick work with fly ash brick, straight or curved on plan exc 6m mean radius, built in cement mortar 1:6 using old size brick complete all as specified and directed. | 6 | CUM | 5,000 ₹30,000 | 4,807 ₹28,842 Lowest | 5,100 ₹30,600 |
| 9.00 | Taking down cement plaster of any description on brick or stone walls or concrete surfaces etc including ranking out joints hacking for key scrubbing down with water etc. | 150 | SQM | 50 ₹7,500 | 17 ₹2,550 Lowest | 60 ₹9,000 |
| 10.00 | M & L for rendering 15 mm thick cement plastering on wall surfaces in two coats (10mm+5mm each) on fair faces of brick work or concrete surfaces in cement mortar 1:4, mixed with liquid water proofing compound in top layer as per manufacturer's instructions and finished the surface even and fair without using extra cement complete all as specified and directed. (Note : WPC shall be measured and paid separately against respective item). | 140 | SQM | 150 ₹21,000 Lowest | 197 ₹27,580 | 160 ₹22,400 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
15 Jun 2026, 6:00 pmClosed
GE (I) CG VIZAG
GE (I) (CG) VIZAG Military Engineer Services CGWO Building, Fleet Mail Office Visakhapatnam-530 014
DAY TO DAY MAINTENANCE AT OTM ACCN MALKAPURAM DHQ 6 CG EASTERN SEABAORD, RUSHIKONDA AND JETTY CAMPUS UNDER AGE BR I UNDER GE (I)(CG) VIZAG
2026_MES_767541_1
GE(I)CG/VIZ/TOKEN/37 OF 2026-27
Open Tender
Miscellaneous Works
Item Rate
270 days
VISAKHAPATNAM
DETAILS AS PER NIT OF THE TENDER
9 documents required · 9 mandatory
₹500
GE (I) (CG) VIZAG
₹40,000
Yes
23 Jul 2026
25 May 2026
17 Jun 2026
25 May 2026
15 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking up or down 15 mm bore steel tubing and connections complete all as specified and directed. | 15 | RM | - | - |
| 2 | S&F of 20 mm outer diameter CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified complete all as specified and as directed. | 15 | RM | - | - |
| 3 | Taking up or down 20 mm bore steel tubing and connections complete all as specified and directed. | 30 | RM | - | - |
| 4 | S&F of 25 mm outer diameter CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified complete all as specified and as directed. | 30 | RM | - | - |
| 5 | S&F Rotational moulded polythene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position of capacity 500 Ltrs including dismatling of old unserviceable one complete all as specified and directed. | 2 | EACH | - | - |
| 6 | S&F Rotational moulded polythene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position of capacity 1000 Ltrs including dismatling of old unserviceable one complete all as specified and directed. | 4 | EACH | - | - |
| 7 | Demolition of brick work or stone / boulder masonry, built in cement mortar including all quoins, pillars etc stacking the serviceable bricks after removing mortar and cleaning for re-use and disposal of debris and rubbish to a distance n.exc 100m complete all as specified and directed. | 6 | CUM | - | - |
| 8 | M & L for Brick work with fly ash brick, straight or curved on plan exc 6m mean radius, built in cement mortar 1:6 using old size brick complete all as specified and directed. | 6 | CUM | - | - |
| 9 | Taking down cement plaster of any description on brick or stone walls or concrete surfaces etc including ranking out joints hacking for key scrubbing down with water etc. | 150 | SQM | - | - |
| 10 | M & L for rendering 15 mm thick cement plastering on wall surfaces in two coats (10mm+5mm each) on fair faces of brick work or concrete surfaces in cement mortar 1:4, mixed with liquid water proofing compound in top layer as per manufacturer's instructions and finished the surface even and fair without using extra cement complete all as specified and directed. (Note : WPC shall be measured and paid separately against respective item). | 140 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
8506Tender37.pdf
Tender Documents • 1.97 MB
BOQ_859585.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .