| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.5 LAdmitted-Finance KANNUR | KERALA | 670001 | L1 | Admitted-Finance | |
| 2 | L2₹65.9 L+₹36,565.41 (0.56%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V J JOY L2 | Prasad K A L1 |
|---|---|---|---|---|---|
| 1.00amdekar | |||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.AII kinds of soil | 76.5 | cum | 314.27 ₹24,041.66 | 295 ₹22,567.5 Lowest |
| 1.02 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40
nominal size) | 9 | cum | 7,212.72 ₹64,914.48 | 6,800 ₹61,200 Lowest |
| 1.03 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level: 1:2:4 (cement: 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)nominal size) | 33.5 | cum | 8,457.35 ₹2,83,321.23 | 8,000 ₹2,68,000 Lowest |
| 1.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form forFoundations, footings, bases of
columns, etc for mass concrete | 250 | sqm | 354.88 ₹88,720 | 333 ₹83,250 Lowest |
| 2.00PROTECTION WALL | |||||
| 2.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and | 84 | cum | 317.75 ₹26,691 | 300 ₹25,200 Lowest |
| 2.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality
blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site | 304 | cum | 3,736.24 ₹11,35,816.96 | 3,550 ₹10,79,200 Lowest |
| 2.03 | 413
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:2:4 (cement: 2 coarsie sand : 4 graded stone aggregate 20 mm
nominal size) | 20 | cum | 8,551.16 ₹1,71,023.2 | 7,941 ₹1,58,820 Lowest |
| 2.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form forFoundations, footings, bases of
columns, etc for mass concrete | 80 | sqm | 358.82 ₹28,705.6 | 333 ₹26,640 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
30 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DEPUTY DIRECTOR
DEPUTY DIRECTOR Parambikulam TR
Estimate for Ambedkar settlement development scheme-Improvement activities in Poopara Tribal settlement under Karimala Range at Parambikulam Tiger Reserve
2026_FD_881452_1
D-761/2025
Open Tender
Civil Works - Others
Percentage
140 days
ANAPPADY
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹50,000
2 Nov 2026
23 Oct 2026
2 Nov 2026
23 Oct 2026
30 Oct 2026
23 Oct 2026
23 Oct 2026 - 30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1amdekar | |||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.AII kinds of soil | 76.5 | cum | 295.1 | ₹22,575.15 |
| 1.02 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40
nominal size) | 9 | cum | 6,772.67 | ₹60,954.03 |
| 1.03 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level: 1:2:4 (cement: 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)nominal size) | 33.5 | cum | 7,941.36 | ₹2,66,035.56 |
| 1.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form forFoundations, footings, bases of
columns, etc for mass concrete | 250 | sqm | 333.24 | ₹83,310 |
| 2PROTECTION WALL | |||||
| 2.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and | 84 | cum | 295.1 | ₹24,788.4 |
| 2.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality
blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site | 304 | cum | 3,469.81 | ₹10,54,822.24 |
| 2.03 | 413
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:2:4 (cement: 2 coarsie sand : 4 graded stone aggregate 20 mm
nominal size) | 20 | cum | 7,941.36 | ₹1,58,827.2 |
| 2.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form forFoundations, footings, bases of
columns, etc for mass concrete | 80 | sqm | 333.24 | ₹26,659.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1499910.xls
BOQ • 0.33 MB
preliminaryagreement.pdf
Tender Documents • 0.22 MB
epaymentform.pdf
Tender Documents • 0.00 MB
tenderschedulepoopara.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .