Loading…
Loading…
Tender Value
₹34.7 L
EMD Value
₹35,000
Closing Date
16 May 2026, 6:00 pmClosed
Executive Engineer, N P Canal Division No.5, Miyagam-Karjan
The work of diversion of Karjan-Umaj Road at MDR Bridge of Sambhoi Distributary Canal at Ch.2.54 km at village Khandha Ta. Karjan Dist. Vadodara
300085
02 of 2026-27
Open
Civil Works - Canal
Works
Vadodara
14 documents required · 13 mandatory · 1 optional
₹1,770
Executive Engineer, N P Canal Division No.5, Miyagam Karjan
₹35,000
30 Apr 2026
30 Apr 2026
30 Apr 2026
16 May 2026
30 Apr 2026
Name of Work :- Diversion work for Sambhoi Distry at Ch. 2+540 upon Karjan - Umaj
Road (MDR) (Km. 0/000 to 16/200) Ta. Karjan, Dist. Vadodara
BILL OF QUANTITIES
It. No. Description of Item Quantity Unit Rate in Figure Total
1 Providing Diversion of Road 7.00 mt Width (Having 146.00 Rmt. 21437.2500
12.00 mt Formation Width) For the Structure by
providing & Spreading Earth work, 200mm GSB,
100mm WMM, 50mm BM & 20mm MSS with Side
Shoulder and Loose Pipe with necessary road
furniture. The Length of Road is depend on Site
condition etc. as directed by Engineer in Charge.
2 Excavation for foundation upto 1.5 m depth 40.00 Cum. 247.8439
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto any lead. (B) Dense or Hard soil
3 Providing and filling in foundation with ordinary 5.00 Cum. 3306.8410
Cement concrete M-100 mix and providing
necessary vertical pin headers including formwork,
vibrating, ramming and curing complete.
4 Providing & casting in situ oridinary cement 72.00 Cum. 3885.4700
concrete M-150 Mix and providing necessary pin
headers including shuttering, scaffolding, laying,
vibrating and finishing concrete without v-grooves
5 Providing TMT Bar FE500D reinforcement for 451.00 Kg. 77.2852
R.C.C. work including bending, binding and placing
in position complete upto floor two level.
Rs. Thirty Four Lakhs, Seventy Thousand, Eight Hundred Ninety Five and Ninety three
I/We am/are willing to carry out the work @ ______________ % ______________
percent (should be written in figures and words) below / above, the estimated rates
mentioned above, amount of my/our tender works out as under :
It. No. Description of Item Quantity Unit Rate in Figure Total
Above all items of "Bill of Quantities" with Item Description, Unit, Qty, Rate & Amount have verified
by me and found order.
It. No. Description of Item Quantity Unit Rate in Figure Total
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
5 The contractor will have to submit the mix design for different grades of cement concrete
and asphalt at his own cost before execution as directed and to be approved from the
engineer in charge.
Deputy Executive Engineer Executive Engineer
N.P. Canal Sub Dn. No. 5/1 N.P.Canal Dn. No.
Miyagam, Karjan Karjan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD BOOK SSNNL.pdf
0.1. General Techical Specification.pdf
BOQ.pdf
Typical Diversion Drawing.pdf
R1_Diversion_MSS_ KANDA_13_03_2026.pdf
Annexure-5.pdf
Annexure-6.pdf
Annexure-7.pdf
Annexure-8.pdf
Index GRs Govt.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .