| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.5 LAccepted-AOC TENDER DOCUMENTS DO NOT CONTAIN THE FULL ADDRESS FOR THIS PRIVATE COMPANY | L1 | Accepted-AOC L1 | |
| 2 | L2₹63.8 L+₹6.4 L (11.1%)Rejected-Finance PLAMPARAMPIL HOUSE MAROOR P O ENADIMANGALAM PATHANAMTHITTA | PATHANAMTHITTA | KERALA | 685533 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RAJU THOMAS L2 | G.SASIDHARAKURUP L1 |
|---|---|---|---|---|---|
| 1.00Construction of New Pump House and VCBs | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 321.6 | sqm | 22 ₹7,075.2 | 21 ₹6,753.6 Lowest |
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 60 | metre | 1,700 ₹1,02,000 Lowest | 1,700 ₹1,02,000 Lowest |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 400 | hour | 550 ₹2,20,000 | 500 ₹2,00,000 Lowest |
| 1.00 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | 45 | Day | 1,350 ₹60,750 | 1,200 ₹54,000 Lowest |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 28.5 | cum | 2,750 ₹78,375 Lowest | 2,800 ₹79,800 |
| 1.01 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 8.1 | cum | 850 ₹6,885 | 800 ₹6,480 Lowest |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 984.88 | cum | 300 ₹2,95,465.5 Lowest | 350 ₹3,44,709.75 |
| 1.01 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 417 | metre | 180 ₹75,060 | 153 ₹63,801 Lowest |
| 1.01 | OD8619/2026-2027:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6x15 = 90m. | 417 | metre | 290 ₹1,20,930 Lowest | 350 ₹1,45,950 |
Tender Value
₹53.9 L
EMD Value
₹50,000
Closing Date
4 Jul 2026, 6:00 pmClosed
Superintending Engineer
O/o SE, MIC, Jalavijnana Bhavan, TVM
GENERAL-Polachira Ela ( Vadakke Pump House)-Improving Irrigation facilities to Polachira ela (Vadakke pump house) in Chirakkara panchayath-General Civil Work
2026_Irrig_857507_1
IRR/IA/TR/1475/2026_5_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
365 days
Nedungolam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
23 Sept 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of New Pump House and VCBs | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | - | metre | - | - |
| 1.003 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.004 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | - | Day | - | - |
| 1.005 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.006 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 1 | cum | - | - |
| 1.007 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.008 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | - | metre | - | - |
| 1.009 | OD8619/2026-2027:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6x15 = 90m. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449532.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
IntegrityPact.pdf
Other Document • 0.05 MB
Preliminary.pdf
Other Document • 0.09 MB
sbdfinal.pdf
Tender Documents • 4.41 MB
Epayment.pdf
Other Document • 0.07 MB
Affidavit.pdf
Other Document • 0.03 MB
FormofTender.pdf
Other Document • 0.03 MB
BOQ_1449532.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .