| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.0 LAccepted-Finance | ₹94.0 L | L1 | Accepted-Finance LOW RATE |
| 2 | L2₹94.1 LRejected-Finance | ₹94.1 L | L2 | Rejected-Finance HIGH RATE |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹92 L
EMD Value
₹6.6 L
Closing Date
12 Mar 2026, 12:00 pmClosed
Superintending Engineer
SE BALLIA CIRCLE PWD BALLIA
Construction of a culvert in Singhi Gram Panchayat under Revati development block in Ballia district
2026_CEUAZ_1122377_3
1014/NIVIDA(CD)-BALLIA CIRCLE/2025 DATE 21.02.2026
Open Tender
Civil Works - Bridges
180 days
BALLIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,590
₹6.6 L
SE BALLIA CIRCLE PWD BALLIA
1 Jun 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
7 Mar 2026
Dismantling brick work or stone work in lime or cement mortar and including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. SI no 692
Dismantling RCC or RBC work in cement mortar and including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. SI no 692
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Granular Filling in Foundation Trenches as per Drawing & Technical Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Grade M-25 in Wing wall using batching plant transit mixer & manual placing
RCC Grade M-30 in Foundation using batching plant transit mixer & manual placing
RCC Grade M-30 in Super Structure using batching plant transit mixer & manual placing
RCC Grade M-35 in Super Structure using batching plant transit mixer & manual placing
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Providing and laying filter materials underneath pitching in slopes complete as per drawing and technical specification'
Constn. Of embankment with approved materials obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000m. As per Technical specification clause 301.5 cartage 1 Km
Providing, laying and spreading on a prepared sub grade, adding cement @ 2%by weight to the spread material manually,mixing in place with rotavator & compacting with the road roller at OMC to achieve the desire unconfined compressive strengh and to form a layer of sub base.
Providing, laying and spreading on a prepared sub base, adding cement @ 4%by weight to the spread material manually,mixing in place with rotavator & compacting with the road roller at OMC to achieve the desire unconfined compressive strengh and to form a layer of base.
Providing and applying tack coat with bitumen (V.G.10) using pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with machanical broom as per 503 of MORD data book
Providing and applying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6mm aggregates either using penitation grade bitumen or emulsion to require line grade and level to serve as vearing coarse on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 kn static roller capacity finished to required level and grates to be followde by seal coat or either as per Technical Specification Clause 508
Providing and laying seal coat sealing the voids in a bitumenus surface laid to the specified levels grade and cross fall using type-C as per Technical Specification Clause 510
Constn. Of Subgrade and earthen shoulder with approved materials obtained from borrow pits with a lift upto 1.50M. transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000m. As per Technical specification clause 301.5
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Providing and Laying Brick on Edge for making Diversion including all material T&P etc. complete for proper completion for the work.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2089927.xls
BOQ • 0.25 MB
T2.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid