Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | -19.50% | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹6.9 L (2.77%)Admitted-Finance | -19.00% | ₹2.6 Cr+₹6.9 L (2.77%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹10.0 L (4.00%)Admitted-Finance | -18.81% | ₹2.6 Cr+₹10.0 L (4.00%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹41.2 L (16.5%)Admitted-Finance | -13.25% | ₹2.9 Cr+₹41.2 L (16.5%) | L4 | Admitted-Finance |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
27 Feb 2020, 6:00 pmClosed
ACE PHED Region Kota
ACE PHED Region Kota
CONVERSION OF P and T SCHEME TO PIPED SCHEME DANTA TEHSIL SHAHBAD DISTRICT BARAN ON SPR BASIS
2020_PHCJA_176508_1
NIT No.08/2019-20
Open Tender
Civil Works - Water Works
Turn-key
365 days
Region Kota
as per TD
2 documents required · 2 mandatory
₹10,000
ACE PHED Region Kota
₹6.4 L
Yes
21 Apr 2020
7 Feb 2020
28 Feb 2020
7 Feb 2020
27 Feb 2020
7 Feb 2020
Amount
Procurement and installation of 15 HP centrifugal pump sets ( 2 nos) capable to discharge 8 LPS at 55 mtr head (1 no working+ 1 no standby) , electric pannels(2 nos) with soft starter sitable for 15 HP, cables suitble for 15 HP pump sets , cable tray MS 50x50x5 mm with all accessories, pressure guage( 2 nos) 0-6 kg/sqm range and specials(MS pipes (200 mm dia suction pipes and 150 mm dia deliver pipes ), reducers 200x150, enlargers 150x150, delevery pipes, suction pipes), valves ( 50 mm dia kinetic air valves, 150mm and 200 mm dia sluice valves, 150 mm dia NRV)as per P&I diagram including civil works RCC pump foundation with minimum reinforcement for intallation of pump sets. All MS pipes shall be 8 mm thick minimum and epoxy coated inside and out side .
Cost for Basic Service Charges, including all chemicals required, for disinfection of water , Administration and Management, Running of Office, Staff Quarters, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of Lubricants, Consumables, Spare Parts etc as per Scope of Work & terms & conditions of contract. After execution of the project and issuance of completion certificate as per relevant clause in Vol-1, Defect Liability Period shall be of 12 months. During Defect liability period O&M shall be done by contractor for which no payment shall be made separately. O&M period shall commence after completion of defect liability period.
For year 1 of O&M
For year 2 of O&M
For year 3 of O&M
M/S SUMANGAL CONSTRUCTION
M/S gulab chand kumawat
M/S SACHIN CONST.
M/S SUMANGAL CONSTRUCTION
M/S gulab chand kumawat
M/S SACHIN CONST.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.21 MB
TD.pdf
Tender Documents • 5.90 MB
BOQ_311159.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .