Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.6 LAccepted-AOC 05 AYODHYA NAGAR NEAR RAM MANDIR BEHIND HARIYA COLLEGE GOKUL NAGAR JAMNAGAR 361004 | JAMNAGAR | JAMNAGAR | GUJARAT | 361004 | L1 | Accepted-AOC Contract Awarded being lowest bidder. | |
| 2 | L2₹89.5 L+₹4.9 L (5.76%)Rejected-AOC | L2 | Rejected-AOC Rejected due to Higher amount quoted. | |
| 3 | L3₹1.0 Cr+₹19.4 L (22.9%)Rejected-AOC 434 4TH FLOOR CROSS ROAD OPP DKV COLLEGE JAMNAGAR GUJARAT 361 008 | JAMNAGAR | GUJARAT | 361008 | L3 | Rejected-AOC Rejected due to Higher amount quoted. | |
| 4 | L4₹1.3 Cr+₹40.8 L (48.2%)Rejected-AOC | L4 | Rejected-AOC Rejected due to Higher amount quoted. |
| Sl No | Description | Qty | Unit | KEVAL ENTERPRISE L1 | Dhanraj Construction Co L3 | M/s Patel Builders L2 | M/s Mohata Buildcon L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in SCHEDULE 'A' PART-I representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 21 | 1 | LUMP SUM | 69,71,500 ₹69,71,500 | 81,00,000 ₹81,00,000 | 68,90,000 ₹68,90,000 Lowest | 96,90,359.2 ₹96,90,359.2 |
| 2.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE AND DEVELOPMENT" as listed in SCHEDULE 'A' PART-II representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 22 | 1 | LUMP SUM | 1,09,792 ₹1,09,792 Lowest | 3,50,000 ₹3,50,000 | 3,55,000 ₹3,55,000 | 3,65,857.26 ₹3,65,857.26 |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in SCHEDULE 'A' PART-III representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 24 | 1 | LUMP SUM | 25,000 ₹25,000 | 20,761 ₹20,761 | 18,000 ₹18,000 Lowest | 25,952.46 ₹25,952.46 |
| 4.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIC SUPPLY" as listed in SCHEDULE 'A' PART-IV representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 28 | 1 | LUMP SUM | 4,25,000 ₹4,25,000 Lowest | 4,60,000 ₹4,60,000 | 4,50,000 ₹4,50,000 | 5,37,092.4 ₹5,37,092.4 |
| 5.00 | Lump sum price worked out by the contractor for "HARD STANDING" as listed in SCHEDULE 'A' PART-V representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 29 | 1 | LUMP SUM | 3,61,533 ₹3,61,533 Lowest | 4,20,000 ₹4,20,000 | 4,50,000 ₹4,50,000 | 5,87,179.63 ₹5,87,179.63 |
| 6.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in SCHEDULE 'A' PART-VI representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 31 | 1 | LUMP SUM | 97,500 ₹97,500 Lowest | 1,37,175 ₹1,37,175 | 1,25,000 ₹1,25,000 | 1,64,610.92 ₹1,64,610.92 |
| 7.00 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in SCHEDULE 'A' PART-VII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 33 | 1 | LUMP SUM | 25,000 ₹25,000 | 25,599 ₹25,599 | 23,000 ₹23,000 Lowest | 33,278.97 ₹33,278.97 |
| 8.00 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in SCHEDULE 'A' PART-VIII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 34 | 1 | LUMP SUM | 58,500 ₹58,500 | 90,000 ₹90,000 | 58,000 ₹58,000 Lowest | 90,727.86 ₹90,727.86 |
| 9.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in SCHEDULE 'A' PART-IX representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 36 | 1 | LUMP SUM | 1,95,000 ₹1,95,000 Lowest | 4,00,000 ₹4,00,000 | 3,20,000 ₹3,20,000 | 3,62,662.94 ₹3,62,662.94 |
| 10.00 | Lump sum price worked out by the contractor for "COOLING APPLIANCES" as listed in SCHEDULE 'A' PART-X representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 37 | 1 | LUMP SUM | 85,000 ₹85,000 | 1,20,000 ₹1,20,000 | 75,000 ₹75,000 Lowest | 1,01,347.6 ₹1,01,347.6 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
13 Nov 2025, 6:00 pmClosed
CWE AHMEDABAD
CWE Ahmedabad Hanuman Camp Shahibaug Ahmedabad PIN-380003
CONSTRUCTION OF CADETS AMENITY CENTRE (CSD,BANK AND POST OFFICE) FOR SAINIK SCHOOL AT BALACHADI UNDER GE (A) JAMNAGAR
2025_MES_730321_2
87426/E8
Open Tender
Civil Works
Lump-sum
365 days
ARMY AREA JAMNAGAR
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹1,000
GE (A) JAMNAGAR
₹1.7 L
Yes
6 Feb 2026
24 Oct 2025
21 Nov 2025
24 Oct 2025
13 Nov 2025
8 Nov 2025
24 Oct 2025 - 7 Nov 2025
Amount
Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in SCHEDULE 'A' PART-I representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 21
Lump sum price worked out by the contractor for "SITE CLEARANCE AND DEVELOPMENT" as listed in SCHEDULE 'A' PART-II representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 22
Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in SCHEDULE 'A' PART-III representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 24
Lump sum price worked out by the contractor for "INTERNAL ELECTRIC SUPPLY" as listed in SCHEDULE 'A' PART-IV representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 28
Lump sum price worked out by the contractor for "HARD STANDING" as listed in SCHEDULE 'A' PART-V representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 29
Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in SCHEDULE 'A' PART-VI representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 31
Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in SCHEDULE 'A' PART-VII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 33
Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in SCHEDULE 'A' PART-VIII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 34
Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in SCHEDULE 'A' PART-IX representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 36
Lump sum price worked out by the contractor for "COOLING APPLIANCES" as listed in SCHEDULE 'A' PART-X representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 37
SCHEDULE 'A' PART-XI (MISCELLANEOUS ITEMS) NOTES:- (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule.
(INTERNAL WATER SUPPLY) Supply and fixing Health faucet with 1.50 mtr tube & Hook any description including flexible attachment make prayag or equivalent Cat No: BEA-86 Prayag (Make: Prayag, Jaquar, Cera)
(SEWAGE DISPOSAL) Supply and fixing DWCPE (SN8) pipes nominal dia 163mm ID (180 O/D) laid in trenches for sewer network fixed jointed with integral socket or coupler and EPDM sealing ring (depending on pipe ends) as per manufacturer instructions complete all as specified and as directed .
Material and Labour for Fly Ash bricks masonry Septic Tank to carry sewage and sludge water including excavation and earth work in any type of soil, disposal of surplus soils to a distance n.exc 50M, RCC cover slab M-30, vent shaft, connection etc complete for 50 users all as per drawing No CEJZ/TD/30 Sheet No 1/3 to 3/3.
Material and Labour for Fly Ash bricks masonry soakage well, excavation, in any type of soil walls of honey comb masonry with Top RCC cover slab in M-30 filled with broken stone boulder aggregate, size 2.40m internal dia x 3.00m effective depth all as per drawing No CEJZ/TD/29 Sheet No 2/3.
(EXTERNAL WATER SUPPLY) Material and Labour for construction of masonry valve chamber of size 600mm X 600mm X 600mm internal dimension complete with 3.15 mm thick MS sheet cover angle iron frame duly painted with locking arrangment including all necessary excavation and earth work PCC cover complete.
(COOLING APPLIANCES) Voltage stabilizer for automatic operation single phase naturally air cooled indoor type & designed for input voltage between 170 V to 250 V to with output voltage stabilizer at 230 V with accuracy of +-2.5 % and capacity 2 KVA.
M/s Patel Builders (BID ID -3478512)
Dhanraj Construction Co (BID ID -3476365)
M/s Mohata Buildcon (BID ID -3478598)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.31 MB
Additional Documents
Additional Documents • 2.79 MB
Additional Documents
Additional Documents • 16.48 MB
Tender Documents
Tender Documents • 1.47 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .