Executive Engineer drainage Dept.
Construction Of Stormwater Network for Outgrowth Village Area of Bhavnagar City
270832
Tender Notice No.- 20 BMC/DRAINAGE/SJMMSVY/TENDER/2025-26( second attept)
Open
Civil Works
Works
Bhavnagar
9 documents required · 8 mandatory · 1 optional
₹6,000
Yes
Commissioner, Municipal Corporation, Bhavnagar
₹3.4 L
Yes
29 Jan 2026
29 Jan 2026
29 Jan 2026
18 Feb 2026
29 Jan 2026
Online Downloading of Technical Bid & Price Bid AS Per Volume I
Pre – Bid Conference AS Per Volume I
Last Date of Online Submission of Technical Bid &
AS Per Volume I
Last Date for Physical Submission of Tender Fee, EMD
AS Per Volume I
and other Documents
Online Opening of the Technical Bid AS Per Volume I
CONSULTANT: CLIENT:
Executive Engineer (Drainage Department),
Bhavnagar Municipal Corporation
Sir Mangalsinhji Road,
E-mail: [email protected] OR
1.0 FORM OF PRICE PROPOSAL
Bidders are required to fill up all blank spaces in this Bid Form
To DEPUTY COMMISSIONER (ADMIN),
Bhavnagar Municipal Corporation,
Mangal Sinhji Road,
Bhavnagar – 364
(Gujarat) – INDIA.
SUB : Construction Of Stormwater Network For Outgrowth Village Area Of
We have examined the Conditions of Contract, Employer's Requirements, Schedules, Addenda’s and
the matters set out in the Appendix hereto. We have understood and checked these documents and
have not found any errors in them. We accordingly offer to design, execute commission and to
maintain for the three years the said Works and remedy any defects, fit for purpose in conformity
with these documents and the enclosed Proposal, I am agree to complete work within given time
limit with___________% above or below ( strikeout which is not applicable) and other such sums as
may be determined in accordance with the terms and conditions of the Contract. The above
We confirm our agreement with the appointment of Dispute Adjudication Board of General Condition
We agree to abide by this Bid until 180 days and it shall remain binding upon us and maybe accepted
at any time before that date. We acknowledge that the Appendix forms part of our Bid.
If our bid is accepted, we will provide the specified performance security, commence the Works as
soon as reasonably possible after receiving the Employer's Representative's notice to commence, and
complete the Works in accordance with the above-named documents within the time stated in the
Appendix to Technical Proposal.
Unless and until a formal Agreement is prepared and executed, this Bid, together with your written,
acceptance thereof, shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any bid you may receive.
We are, Gentlemen
Yours faithfully
Signature _______________________ in the capacity of ________________ duly authorized to sign
bids for and on behalf of
APPENDIX TO PRICE PROPOSAL
2.0 APPENDIX TO PRICE PROPOSAL
Conditions of Contract
Employer’s name and address City Engineer
Bhavnagar Municipal Corporation,
Mangal Sinhji Road,
Bhavnagar – 364
(Gujarat ) – INDIA.
Contractor’s name and address ________________________________________
Time for notice to commence 7 Days
Name and address of the Employer’s To be nominated by Employer at the time of
Representative/Engineer Award of Contract
Time for Completion of construction As mentioned in Vol I
Validity Period of Tender Offered 180 days from the last date of receiving of the
Defects liability period 36 months after commissioning
Period for O & M Contract NA
Language for communications English
Electronic transmission systems
Confidential Details ________________________________________
Currency of all payments Indian Rupees
Amount of insurance for work Total cost of work
Amount of third party insurance As per law per occurrence, number of
occurrences: maximum three
Periods of insurance Up to contract period till completion of WORK
a) Evidence of insurance 30 days from commencement date
c) Relevant policies 60 days -do-
Number of members of Arbitral
Members of Dispute Adjudication
Board (if not agreed) to be nominated As per the Arbitration and Conciliation Act
by India along with its latest amendments.
Arbitration rules
Language of arbitration English
Place of arbitration Bhavnagar, Gujarat, India
Procedural Law Indian as governed by the Arbitration and
Conciliation Act, 1996, India and its latest
Limit of Retention Money As mentioned in Vol I
Payments in Local Currencies In Indian Rupees
Time for access to the Site Within 15 days from the date of Letter of Work
Order Acceptance / Letter of Intent/ Handing
over of clear site will prevail.
Amount of performance security As mentioned in Vol I
Damages for delay 0.1 % per day with limit as 10% of the
Construction Contract Price or as decided by Hon.
Commissioner, BMC
Deductions of Labor Cess : 1 % of contract price for construction workers
welfare fund from all R.A. Bills & final Bill.
Deductions of GST : GST as per prevailing Government Rules, will be
paid extra in all R.A. Bills & final Bill.
Deductions of Income Tax : 2% and additional cess if applicable , as
applicable of contract price from all R.A. Bills &
1. As mentioned in the Conditions of contract, the provision of measurement will be applicable for the
assessment of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items for Civil works specified
3. Each item of Schedule B has been divided into broad components. The Employer's Representative
shall assess the value of each component as indicated in paragraph 6 herein below.
4. Percentages are indicated against each component of each item of Civil works specified in Schedule
B, based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other unforeseen work(s) / item(s)) is
included in each breakdown of schedule and the tenderer shall at the time of tendering indicate
any additional items which he considers necessary but cannot be covered by any of the heads
indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B
6. The contractor shall, after approval of designs and drawings, furnish to the Employer's
Representative an initial bill of quantities to all major items, to be reviewed and updated
periodically with the Employer's Representative. This bill of quantities will be used for assessment
of percentage progress of the component at any stage. By measurement jointly taken by the
Employer's Representative and the Contractor, mutually agreed and entered in the measurement
books in the form and by the method approved by the Employer's Representative, and signed
jointly by both the parties
7. The payment on running bills & final bill will be regulated as per percentage shown in each item.
8. 5% amount of all running bills shall be recovered and kept in deposit and shall be released after
successful completion of all hydraulic tests for pumping station and as per Clause IT-27 of General
Instructions of Section 5, Vol. I.
9. % age of total cost means cost quoted in schedule B and finally approved by the employer.
BHAVNAGAR MUNICIPAL CORPORATION
DRAINAGE DEPARTMENT
CONSTRUCTION OF STORMWATER NETWORK FOR OUTGROWTH VILLAGE AREA OF BHAVNAGAR CITY
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
1 Clearing the canal by Km 0.66 25,703.00 Rupees Twenty Five
cleaning/removing the thick weed, Thousand Seven
shrubs and all other vegetations Hundred Three Only
including silt upto 10cm
thickness,stones,debris etc from canal
bed and side slope of canal upto outer
toe of canal bank and disposing as
g) For canal capacity from 100.0 to
2 i) For canal capacity from 300.0 to Km 0.11 35,522.00 Rupees Thirty Five
400.0 cusecs. Thousand Five
Hundred Twenty Two
3 Excavation in all sort of strata and Cu.m. 648.00 77.00 Rupees Seventy
formations incl. depositing the unuseful Seven Only
excavated stuff as and where directed
incl sorting and stacking useful
materials as directed upto 30 mt lead
etc. complete incl. dewatering.
( Depth 0 TO 3.0 mt )
For all type canal & foundation
trenches of C.D. works (Average
a) IN OVERBURDEN INCL. HARD
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
4 Excavation for pipe line trenches for Cu.m. 16419.00 102.35 Rupees One Hundred
water supply, sewerage line, manhole Two and Thirty Five
etc. all with shoring and struting if Paise
required as per required gradient and
line including safety provisions using
site rails and stacking excavated stuff
including up to all required lead
cleaning the site etc. complete for all
lifts and strata as specified. etc.
Completed as per director.
(Excavation for Pipe, Manhole and
0.00 to 1.50 mt depth
a) in all sorts of soil and soft murrum
5 b) in hard murrum, boulders incl. Cu.m. 4535.00 155.25 Rupees One Hundred
macadam road. Fifty Five and Twenty
6 c) In In soft rock and/or masonry in CM Cu.m. 1164.00 187.45 Rupees One Hundred
or L M or Lime Concrete. Eighty Seven and
Forty Five Paise
7 d) In hard rock and or c.c. 1:2:4 or RCC Cu.m. 1164.00 427.80 Rupees Four Hundred
with plasting, breaking, chiseling or by Twenty Seven and
chiseling/ breaking only Eighty Paise
8 1.5 to 3.0 mt depth Cu.m. 907.00 112.70 Rupees One Hundred
a) in all sorts of soil and soft murrum Twelve and Seventy
9 b) in hard murrum, boulders incl. Cu.m. 453.00 170.20 Rupees One Hundred
macadam road. Seventy and Twenty
10 c) In In soft rock and/or masonry in CM Cu.m. 76.00 205.85 Rupees Two Hundred
or L M or Lime Concrete. Five and Eighty Five
11 d) In hard rock and or c.c. 1:2:4 or RCC Cu.m. 76.00 446.20 Rupees Four Hundred
with plasting, breaking, chiseling or by Forty Six and Twenty
chiseling/ breaking only Paise
12 3.0 to 4.50 mt depth Cu.m. 10.50 118.45 Rupees One Hundred
a) in all sorts of soil and soft murrum Eighteen and Forty
13 b) in hard murrum, boulders incl. Cu.m. 9.90 177.10 Rupees One Hundred
macadam road. Seventy Seven and
14 c) In In soft rock and/or masonry in CM Cu.m. 4.30 215.05 Rupees Two Hundred
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
or L M or Lime Concrete. Fifteen and Five Paise
15 d) In hard rock and or c.c. 1:2:4 or RCC Cu.m. 4.30 456.55 Rupees Four Hundred
with plasting, breaking, chiseling or by Fifty Six and Fifty Five
chiseling/ breaking only Paise
16 Excavation for foundation upto 1.5 m Cu.m. 1615.23 275.33 Rupees Two Hundred
depth including sorting out and Seventy Five and
stacking of useful materials and Thirty Three Paise
disposing off the excavated stuff upto
50 Meter lead.(C) Hard Murrum
17 Excavation for foundation for depth Cu.m. 164.48 294.05 Rupees Two Hundred
from 1.5 m to 3.0 m including sorting Ninety Four and Five
out and stacking of useful materials and Paise
disposing off the excavated stuff upto
50 Meter lead.(C) Hard Murrum
18 Excavation for foundation for depth Cu.m. 49.21 307.16 Rupees Three
from 3.0 m to 5.0 m including sorting Hundred Seven and
out and stacking of useful materials and Sixteen Paise
disposing of the excavated stuff upto
50 Meter lead.(C) Hard Murrum
19 Excavation for foundation in sand, Cu.m. 668.00 523.28 Rupees Five Hundred
gravel, clay soft soils and murrum etc. Twenty Three and
including shoring, strutting dewatering Twenty Eight Paise
as necessary and disposing of the
excavated stuff as directed.(A) Depth
upto 3.0 M. and lead upto 100m for
20 Carrying of stacking excavated stuff Cu.m. 166.47 165.23 Rupees One Hundred
including up to 5 KM required lead Sixty Five and Twenty
cleaning the site etc. As Directed by Three Paise
Engineering-In-charge
21 Dewatering In all sorts of soil and soft Cu.m. 88.23 19.55 Rupees Nineteen and
murrum, hard Murrum and boulders, Fifty Five Paise
Soft Rock, Hard Rock, beyond 1.5 mt.
depth from G. L.
upto 1.5 m depth
22 1.5 to 3.0 mt depth Cu.m. 1598.23 31.05 Rupees Thirty One
23 3.0 to 4.5 mt depth Cu.m. 77.21 42.55 Rupees Forty Two
and Fifty Five Paise
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
24 Excavation in bituminous road as per Cu.m. 160.13 288.65 Rupees Two Hundred
required gradient and line including Eighty Eight and Sixty
safety provisions using site rails and Five Paise
stacking excavated stuff including up to
all required lead cleaning the site etc.
complete for all lifts as specified.
25 Providing bedding incl. ramming, Cu.m. 405.00 378.35 Rupees Three
watering, levelling, consolidating etc. Hundred Seventy
Complete as per standard and Eight and Thirty Five
instruction of engineer incharge as Paise
above with required quality Sand
brought from outside including all lead
26 Providing and laying rubble for appron Cu.m. 38.00 1092.52 Rupees One
(each stone weighting not less than Thousand Ninety Two
40Kg.) including and packing and filing and Fifty Two Paise
in the interestices with quarry-spalls.
27 Providing and supplying ISI Standard Rmt. 498.00 755.00 Rupees Seven
R.C.C. pipes(of Sulphate Resisting Hundred Fifty Five
Cement) in standard lengths of Only
following class and diameter suitable
for either collar joints or rubber ring
joints including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores,
stacking etc. complete. (IS - 458/
Note : One collar should be supplied
with each full length plain ended RCC
pipe, cost included in rates below. One
rubber ring should be supplied with
each full length socketed pipe, cost
included in rates below.
Class NP3 Test Pressre 0.7 Kg/sq.cm
300 mm dia pipe ID
28 400 mm dia pipe ID Rmt. 288.00 1150.00 Rupees One
Hundred Fifty Only
29 500 mm dia pipe ID Rmt. 942.00 1485.00 Rupees One
Hundred Eighty Five
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
30 600 mm dia pipe ID Rmt. 76.00 1946.00 Rupees One
Hundred Forty Six
31 700 mm dia pipe ID Rmt. 127.00 2897.00 Rupees Two
Hundred Ninety Seven
32 800 mm dia pipe ID Rmt. 63.00 3175.00 Rupees Three
Hundred Seventy Five
33 1200 mm dia pipe ID Rmt. 100.00 5899.00 Rupees Five
Hundred Ninety Nine
34 Lowering, laying and jointing R. C. C. Rmt. 498.00 136.85 Rupees One Hundred
pipes in C. M. 1:1 1/2 of following Thirty Six and Eighty
diameters in proper position, grade and Five Paise
alignment at all level as directed by
Engineer-in-charge including
conveyance from stores to site of work,
labour, giving hydraulic testing as per
ISI code. Class NP2,NP3,NP4
300 mm dia pipe ID
35 400 mm dia pipe ID Rmt. 288.00 174.80 Rupees One Hundred
Seventy Four and
36 500 mm dia pipe ID Rmt. 942.00 217.35 Rupees Two Hundred
Seventeen and Thirty
37 600 mm dia pipe ID Rmt. 76.00 262.20 Rupees Two Hundred
Sixty Two and Twenty
38 700 mm dia pipe ID Rmt. 127.00 308.20 Rupees Three
Hundred Eight and
39 800 mm dia pipe ID Rmt. 63.00 347.30 Rupees Three
Hundred Forty Seven
and Thirty Paise
40 1200 mm dia pipe ID Rmt. 100.00 506.00 Rupees Five Hundred
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
41 Refilling of Pipeline trenches Cu.m. 20517.00 25.30 Rupees Twenty Five
Refiling the pipeline trenches incl. and Thirty Paise
ramming, watering, consolidating
desposal of surplus stuff as directed
within state limit.
42 Filling available excavated earth Cu.m. 1220.78 137.47 Rupees One Hundred
(excluding rock) in trenches. plinth, Thirty Seven and Forty
sides of foundations etc. in layers not Seven Paise
exceeding 20 cm. in depth
consolidating each disposited layer by
ramming and watering.
43 Providing and constructing Sewer No. 2.00 14005.85 Rupees Fourteen
manholes, scraper manholes and unit Thousand Five and
house connection chamber, as per the Eighty Five Paise
type design in brick masonary in C. M.
1:5 and inside and outsice 20mm thick
plastering in C. M. 1:3 necessary
mm coping with reinforcement in RCC
M- 200 fixing C. I. steps and fixing
manhole frame and covers (But
excluding supply of manhole frame and
covers) over manholes and house
connection chambers and fixing
Manhole covers (but excluding
supplying of manhole covers) over
scraper manhole etc. complete,
providing and fixing safety chain
wherever necessary as per the
stipulations in the type desing
complete as per latest CPHEEO manual
(excl. excavation).
a) Manhole type 'A' Circular type having
inside diameter of 1200 mm for depth
up to 1.5 M.T. depth ( for 150 mm to
500 mm dia sewer).
i) Manhole type 'A' as above but up to
44 ii) Extra Depth beyond 1.0 M but upto Rmt. 1.00 7622.20 Rupees Seven
1.5 m depth for type "A" manhole Thousand Six Hundred
above. Twenty Two and
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
45 b) Manhole type 'B' Circular type having No. 55.00 24283.40 Rupees Twenty Four
inside diameter of 1500 mm for depth Thousand Two
from 1.5 mt to 4.0 mt ( for 150 mm to Hundred Eighty Three
600 mm dia sewer ). and Forty Paise
i) Manhole type 'B' as above but up to
46 ii) Extra Depth beyond 1.5 M but upto Rmt. 29.00 14159.95 Rupees Fourteen
4.0 m depth for type "B" manhole Thousand One
above. Hundred Fifty Nine
and Ninety Five Paise
47 g) Scraper Manhole type 'S1' regular No. 6.00 60166.85 Rupees Sixty
type for 600 mm dia to 1200 mm dia Thousand One
sewer pipes and for depth 2.5m to 9.0 Hundred Sixty Six and
m. Eighty Five Paise
i) Scraper Manhole type "S1" as above
but upto 2.5 m depth
48 ii) Extra Depth beyond 2.5 m and upto Rmt. 6.00 36693.05 Rupees Thirty Six
9.0 m depth for type "S1" Scraper Thousand Six Hundred
manhole above manhole above. Ninety Three and Five
49 RCC precast MH frame & cover No. 57.00 1,121.00 Rupees One
maufacture, supply & delivery at store Thousand One
or at site of work precast RCC M200 Hundred Twenty One
frame & cover suitable to drainage MH Only
and as per type design & drawing
including cost of reinforcement MS
angle or flat, curing mold work etc.
Frame suitable for 50 cm opening of
50 Cover suitable for 50 cm opening of MH No. 57.00 1,173.00 Rupees One
Hundred Seventy
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
51 Vertical Drop MH No. 4.00 2477.10 Rupees Two
providing and constructing vertical Thousand Four
drop arrangement of 0.60 m and more Hundred Seventy
height as required including providing Seven and Ten Paise
and jointing special such as double T.
bend required stoneware pipe fixed in
M100 C.C. at required level as type
design cutting, jointing and filtering as
per specification etc. complete
Vertical Drop arrangement as above up
to 0.6 m height
52 Extra over item above for additional Rmt. 2.00 2214.90 Rupees Two
drop beyond 0.6 m Thousand Two
Hundred Fourteen
and Ninety Paise
53 Earthwork for embankment including Cu.m. 7794.00 182.14 Rupees One Hundred
breaking clods, dressing with all lead Eighty Two and
and lift and including watering rolling Fourteen Paise
and consolidation of subgrade in layers
at O.M.C. to required dry density
including filling the depression which
occur during the process using power
roller 8T to 10T.(E) From Borrow area
within 3.0KM. lead (Average Filling)
54 Providing and laying dry rubble stone Sq.m. 6487.00 405.00 Rupees Four Hundred
pucca pitching without base , inverted Five Only
filter and header stone but with 10 cms
thick murrum layer ( for base )
incl.hand packing and trimming &
dressing slopes etc complete.b) 23 cms
thick stone pitching with pointing in
55 Providing and laying cement concrete Cu.m. 110.00 3106.67 Rupees Three
1:3:6 (1-Cement : 3- coarse sand : 6- Thousand One
hand broken stone aggregates 40 mm Hundred Six and Sixty
nominal size) and curing complete Seven Paise
excluding cost of formwork in (A)
Foundation and Plinth
56 Providing and laying cement concrete Cu.m. 5.00 3824.10 Rupees Three
1:2:4 (1- Cement : 2- Coarse sand : 4- Thousand Eight
graded stone aggregates 20 mm Hundred Twenty Four
nominal size) and curing complete and Ten Paise
excluding cost of formwork in (A)
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
Foundation and Plinth
57 Brick work using common burnt clay Cu.m. 46.00 5245.48 Rupees Five
building bricks having crushing strength Thousand Two
not less than 35 kg./Sq.Cm. in Hundred Forty Five
foundation and plinth in Cement and Forty Eight Paise
Mortar 1:5. (1- Cement : 5 -fine
sand)(C) Fly Ash Bricks
58 Providing 15mm thick cement plaster in Sq.m. 79.00 200.08 Rupees Two Hundred
single coat on Rough (Similar)side of and Eight Paise
single or half brick walls for interior
plastering upto floor two level and
finished even and smooth in (i) Cement
mortar 1:3 (1-cement:3-sand)
59 Extra over items 58 for providing and Per 13.00 49.26 Rupees Forty Nine
mixing water proofing materials in bag and Twenty Six Paise
cement mortar in proportion of
recommended by the manufacturer. 50Kg
60 Providing and filling rubbles including Cu.m. 7.00 1101.71 Rupees One
hand packing and filling interstices with Thousand One
quarry spalls behind abutments and Hundred One and
between returns as directed. Seventy One Paise
61 Filling available excavated earth Cu.m. 126.53 137.47 Rupees One Hundred
(excluding rock) in trenches. plinth, Thirty Seven and Forty
sides of foundations etc. in layers not Seven Paise
exceeding 20 cm. in depth
consolidating each disposited layer by
ramming and watering.
62 Providing and casting in situ Ordinary Cu.m. 52.00 3816.61 Rupees Three
cement concrete M-150 for R.C.C. Raft Thousand Eight
and cut-off walls including necessary Hundred Sixteen and
shuttering laying, vibrating, ramming Sixty One Paise
and curing complete.
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
63 Providing and cast in situ R.C.C. in Cu.m. 193.00 5043.55 Rupees Five
grade M.250 Proportions of ingredients Thousand Forty Three
as per mix design (Minimum Cement and Fifty Five Paise
content 410 Kg /cum) by weigh
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structures
64 Providing and laying controlled cement Cu.m. 146.00 8554.99 Rupees Eight
concrete M.250 and curing complete Thousand Five
excluding the cost of formwork and Hundred Fifty Four
reinforcement for reinforced concrete and Ninety Nine Paise
work in (B) Walls, from top of
foundation level upto floor two level
65 Providing and laying controlled cement Cu.m. 129.00 8554.99 Rupees Eight
concrete M.250 and curing complete Thousand Five
excluding the cost of formwork and Hundred Fifty Four
reinforcement for reinforced concrete and Ninety Nine Paise
(C)Slabs,landing,shelves,Balconies,
Lintels, Beams, Girders and Cantilever
upto floor two level.
66 Providing and cast in situ R.C.C. in Cu.m. 42.00 5303.97 Rupees Five
grade M-30 Proportions of ingredients Thousand Three
as per mix design (Minimum Cement Hundred Three and
content 410 Kg /cum) by weigh Ninety Seven Paise
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structures
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
For Base Slab and Key of Box , Return
wall base and Key, Base of Curtain Wall
67 Providing and cast in situ R.C.C. in Cu.m. 120.00 6339.74 Rupees Six Thousand
grade M-30 Proportions of ingredients Three Hundred Thirty
as per mix design (Minimum Cement Nine and Seventy
content 410 Kg /cum) by weigh Four Paise
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structuresFor RCC
68 Providing and cast in situ R.C.C. in Cu.m. 26.00 6347.29 Rupees Six Thousand
grade M-30 Proportions of ingredients Three Hundred Forty
as per mix design (Minimum Cement Seven and Twenty
content 410 Kg /cum) by weigh Nine Paise
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structuresFor RCC
For Middle and end wall of Box
Curtain Wall above base, Haunch,
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
69 Providing and cast in situ R.C.C. in Cu.m. 20.00 6205.62 Rupees Six Thousand
grade M-30 Proportions of ingredients Two Hundred Five and
as per mix design (Minimum Cement Sixty Two Paise
content 410 Kg /cum) by weigh
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structuresFor RCC
For RCC Solid Slab , Cantilever slab etc.
70 Providing and cast in situ R.C.C. in Cu.m. 45.00 5719.58 Rupees Five
grade M-30 Proportions of ingredients Thousand Seven
as per mix design (Minimum Cement Hundred Nineteen
content 410 Kg /cum) by weigh and Fifty Eight Paise
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structuresFor RCC
For Approach Slab
71 Providing and cast in situ R.C.C. in Cu.m. 16.00 5688.46 Rupees Five
grade M-30 Proportions of ingredients Thousand Six Hundred
as per mix design (Minimum Cement Eighty Eight and Forty
content 410 Kg /cum) by weigh Six Paise
batching mixer, using granite, quazite
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
height/depth for all structuresFor RCC
for wearing coat
72 Providing and cast in situ R.C.C. in Cu.m. 24.00 5882.75 Rupees Five
grade M-30 Proportions of ingredients Thousand Eight
as per mix design (Minimum Cement Hundred Eighty Two
content 410 Kg /cum) by weigh and Seventy Five
batching mixer, using granite, quazite Paise
trap metal of size 6 mm to 20 mm
including scaffolding centering,
formwork with sheating steel
shuttering so as to give fair finish in
concrete, needle vibrated
consolidating, curing and testing etc.
complete (excluding cost of
reinforcement) up to required
height/depth for all structuresFor RCC
For Crash Barier
73 Providing and fixing in position MT 24.00 74942.42 Rupees Seventy Four
Corrosion resistance steel (CRS) Thousand Nine
Thermo mechanically Treated bars Hundred Forty Two
(TMT) Fe500D steel conforming to IS and Forty Two Paise
1786 reinforcing bars of various
diameters for all structure as per
detailed designs and drawings and
schedule including cutting, bending,
hooking the bars, binding with 18 SWG
GI wires with cost of all labour,
materials, tools, plants, equipments,
supporting as required with all lifts and
leads etc. complete as per specification
and as directed by Engineer. The rate
includes for supply, loading, unloading,
transporting to site, cutting, bending,
hooking, placing, tying in position with
contractor's own binding wire, welding,
forming reinforcement cage etc.
Welding and supporting in position to
ensure lines and levels during
concreting, maintaining proper cover /
spacing, all leads & lifts, etc. including
contractor's own equipment, labour,
supervisor, taxes, machineries, etc.
complete as per drawings and
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
For RCC raft Base Slab, End wall,
Middle wall, Haunch, Bracket, Return
wall, Curtain wall etc.
74 Providing TMT Bar FE 500D Kg. 46500.00 77.29 Rupees Seventy
reinforcement for R.C.C. work including Seven and Twenty
bending, binding and placing in position Nine Paise
complete upto floor two level
75 Providing & laying weep hole in Each 108.00 62.93 Rupees Sixty Two and
Aburtments, and returns by using A.C. Ninety Three Paise
pipe of 100mm including laying in
proper grede and jointing the
completed as per detailed specification.
76 Providing and laying - Fitter Media Sq.m. 108.00 1268.86 Rupees One
600mm thick directed at the back of Thousand Two
abutments, returns and wing walls as Hundred Sixty Eight
per detailed specifications. and Eighty Six Paise
77 Providing and filling sand behind Cu.m. 99.00 571.92 Rupees Five Hundred
abutments and between returns in Seventy One and
layers as directed Ninety Two Paise
78 Providing and fixing premoulded Sq.m. 15.00 803.22 Rupees Eight
compressible filler board in blackcolour Hundred Three and
confirming to MoRT&H Specifications Twenty Two Paise
(Clause 1015), having minimum density
95kg/cum. non-staining with less than
1% water absorption & compression
recovery of 93% minimum as per
specification for 20 mm wide expansion
joint including cutting to required size
and shape at all levels etc. complete as
79 Providing G.I. 100mm diameter water Nos. 12.00 536.03 Rupees Five Hundred
spouts including necessary iron gratings Thirty Six and Three
as per drawings. Paise
80 Demolition including stacking of Cu.m. 59.40 1108.12 Rupees One
serviceable materials and disposal of Thousand One
unserviceable materials with all lead Hundred Eight and
and lift. (i) RCC work Twelve Paise
81 Demolition brick work and stone Cu.m. 59.40 576.30 Rupees Five Hundred
masonry including stacking of Seventy Six and Thirty
serviceable materials and disposal of Paise
unserviceable materials with all lead
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
and lift. (i) in Cement mortar
82 Demolition including stacking of Cu.m. 59.40 637.86 Rupees Six Hundred
serviceable materials and disposal of Thirty Seven and
unserviceable materials with all lead Eighty Six Paise
and lift. (i) Cement Concrete work
83 Constructing Brick masonry road gully Each. 114.00 2017.19 Rupees Two
chamber 500mm x 450mm x 600mm Thousand Seventeen
including 500mm x 450mm C.I. and Nineteen Paise
horizontal grating wih frame complete.
84 Constructing brick masonry chamber Each. 1.00 3,660.76 Rupees Three
for underground C.I. Inspection Thousand Six Hundred
chamber and bends with bricks having Sixty and Seventy Six
crushing strength not less than Paise
35Kg/Cm2 in C.M. 1:5 C.I. cover with
frame (Light duty) 455mm x 610mm
intenal dimensions total weight of
cover with frame to be not less than
38Kg. (Wt. of cover 23 Kg.) and Wt. of
frame 15Kg. ) (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand :4-
graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside
plaster 15mm thick with cement mortar
1:3 finished smooth with a floating coat
of neat cement on walls and bed
concrete etc. complete.(ii) Inside
dimensions 500mm x 700 mm and
450mm deep for pipe line with one or
85 Extra over item 84 for every additional Each. 5.50 264.86 Rupees Two Hundred
depth of 0.1M. of part thereof beyond Sixty Four and Eighty
450mm depth for Brick masonry Six Paise
chamber.(ii) for 500mm x 700mm size.
(for Depth upto 1m)
Sr. Description Unit Quantity Final Rate Rate in Words Amount (Rs.)
86 Providing & laying of 300mm Cu.m. 166.40 1264.52 Rupees One
compacted thickness Granular sub Thousand Two
base (GSB) in grading V in table 400-1 Hundred Sixty Four
of the specification MORT&H fifth and Fifty Two Paise
revision and compactor to the required
density with 8 - 10 tonne vibratory
roller with plain drum or heavy
pneumatic tyred roller of minimum
to 300 KN weight in all seasons as per
MORT&H , maintaining the required
slope & grade during the operation as
approved by the engineer in charge &
watering to the proper moisture
content and sprinkled with the help of
truck mounted water tank fitted with
suitable arrangement .( fully saturated
having CBR value greater or equal to
87 Reinstatement of Bituminious Road Sq.m. 1120.88 2042.00 Rupees Two
including excavation, providing, laying, Thousand Forty Two
spreading 200mm Hard Murrum, Only
200mm GSB, 250mm WMM, 25-40mm
bitumen surface grouting, 60mm
premix asphalt carpet, asphalting
Painting and thermoplastic paints
marking including compacting to
achieve desired density as per MoRt& H
detail specification and drawings.
88 Reinstatement of Concrete Road Sq.m. 1042.00 3296.00 Rupees Three
including excavation, providing, laying, Thousand Two
spreading, compacting 200mm Hard Hundred Ninety Six
Murrum, 200mm GSB , 150mm PCC Only
1:3:6 concrete, 250mm M25 grade
concrete with reinforcement @
40kg/Cu.m. of concrete with expansion
joint and thermoplastic paints marking
as per MoRt& H detail specification and
89 Providing and supplying precast 6 Nos No. 6.00 14438.95 Rupees Fourteen
manhole cover of size 1100 x 230mm Thousand Four
size and Frame. (6 nos of cover for 1 Hundred Thirty Eight
manhole) and Ninety Five Paise
1. Charges for the testing of material will be borne by Work Agency.
2. Joint venture will not allowed.
3. Bidder has to must submit all the filled up annexure and adequate detailed documents with
technical bid/physical submissions for fulfilling qualifying criteria , failing witch BMC will
disqualify the bidder without giving chance for submission of missing documents etc. for
further clarifications.
4. The quoted rates should be inclusive of all taxes , insurance, labor overhead charges,
constrictor's profit, royalties etc. except GST.
5. GST will be paid extra as per prevailing rules in all running/final account bills.
SUBMISSION OF PRICE PROPOSAL : I HAVE VISITED THE SITE OF WORK AND THOURGHLY GO
THROUGH STATED SPECIFICATIONS AND CONDITIONS OF CONTRACT, HENCE , I AM
SUBMITTING/QUOTTING RATE …………………………….% ABOVE OR BELOW THEN ESTIMATED
WORK AMOUNT Rs. 3,36,30,848.00 (Indian Rupees) .
Signature of Contractor : Executive Engineer( Drainage)
Name : Bhavnagar Municipal Corporation,
Company’s Seal : Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Vol 1 Technical Bid PQ.pdf
02. Vol-IB Generel and Special Conditions of Contract.pdf
03. Vol II Itemwise Technical Specification.pdf
04. Vol III_Price Bid.pdf
05. Vol-IV_Drawings.pdf
6 Vendar List.pdf
1. TOPOGRAPHICAL SURVEY AKWADA 24 48.pdf
2. TOPOGRAPHICAL SURVEY NARI 24 05 2024.pdf
2.2 TOPOGRAPHICAL SURVEY NARI 24 05 2024.pdf
3. TOPOGRAPHICAL SURVEY RUVA.pdf
4.1. TOPOGRAPHICAL SURVEY TARSAMIYA.pdf
4.2. TOPOGRAPHICAL SURVEY TARSAMIYA.pdf
5. AKWADA Design.pdf
6. RUVA Design R1 A3 L.pdf
7. NARI Design R2 dwg.pdf
8. NARI Design R2.dwg.pdf
9. TARSAMIYA Design R1.pdf
10. TARSAMIYA Design A3.pdf
11. CANAL SECTION R1 12. TRAPEZOIDAL DRAIN.pdf
12. CANAL SECTION R1 13 TRAPEZOIDAL DRAIN.pdf
13. CANAL SECTION R1 14 TRAPEZOIDAL DRAIN.pdf
14. Structural Drawing for 4.5 1m channel A3.pdf
15. Single Cell Box Culvert 2m 2m A2 L1 NARI.pdf
16. Typical Reinforcement detail Single Cell Box Culvert NARI.pdf
17. CLOSE DRAIN STR A3.pdf
18. CLOSE DRAIN STR A3.pdf
19. CLOSE DRAIN STR A3.pdf
20. OUTFALL STRUCTURE R1 A3.pdf
21. OUTFALL STRUCTURE R1 A3.pdf
22. MANHOLE Layout1 A3.pdf
23. CATCH BASIN Layout1A3.pdf
Document
25. Akwada Watershed A3_compressed.pdf
26. Nari Watershade 1 A3_compressed.pdf
27. Ruva Extension Watershed Delineation A3_compressed.pdf
28. Tarsamiya Watershed A3_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .