| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC l1 |
| 2 | L2₹4.7 LRejected-AOC NORTH BEYPORE CALICUT 15 KERALA | KOZHIKODE | KERALA | 612906 | ₹4.7 L | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | ARAVIDAKSHAN K L1 | gopakumar.kv L2 |
|---|---|---|---|---|---|
| 1.00Thirunavaya 1st | |||||
| 1.00 | OD53310/2025-2026:Hire charges for crane and Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. | 1 | each | 9,560 ₹9,560 | 10,000 ₹10,000 |
| 1.00 | OD53309/2025-2026:Hire charges for Crane , Lowering down and erecting above 110 HP motor, starter and other electrical
accessories,( Accessories when necessary ) and erecting the motor on the base
plate coupling with pump, erecting the starter regulator TP switch etc in position
giving connections checking correct alignment and trial run on full load | 1 | each | 13,370 ₹13,370 | 14,000 ₹14,000 |
| 1.00 | OD53311/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump,
detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and
placing them conveniently on the platform. | 1 | each | 810 ₹810 | 800 ₹800 |
| 1.00 | OD65722/2025-2026:Dismantling the 5-10 HP motor into stator and rotor, cleaning the windings attending minor
repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish,
cleaning and greasing the bearings with good quality grease, heating the windings,
reassembling, test running including scrapping, cleaning and painting with enamel paint. | 1 | each | 2,026 ₹2,026 | 2,020 ₹2,020 |
| 1.00 | OD65719/2025-2026: Refitting up to 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,(
Accessories when necessary ) and erecting the motor on the base plate coupling with pump,
erecting the starter regulator TP switch etc in position giving connections checking correct
alignment and trial run on full load | 1 | each | 820 ₹820 | 850 ₹850 |
| 1.01 | OD53312/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 1,015 ₹1,015 | 1,100 ₹1,100 |
| 1.01 | OD53316/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed | 1 | job | 2,500 ₹2,500 | 2,500 ₹2,500 |
| 1.01 | OD53315/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 30,475 ₹30,475 | 32,000 ₹32,000 |
| 1.01 | OD83101/2025-2026:Fully Comprehensive Annual Maintenance contract of above110 HP squirrel cage induction
motor with split case / End suction pump set controlling electrical accessories , panel board
,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush,
carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing
spares with original make as per sample , removing foreign bodies , renewal of gland packing ,
gasket packing , rubber packing , greasing the bearing etc as and when required including
overhauling and maintenance of pump and motor through out the year as required( excluding
motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc
and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in
good working condition all time during the period of contract and the faults should be rectified
with in the time allowed | 1 | job | 25,975 ₹25,975 | 26,000 ₹26,000 |
Tender Value
₹4.1 L
EMD Value
₹10,240
Closing Date
21 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Thirunavaya 1st Irringalloor and Ullanam LIS Malappuram Dt Fully Comprehensive Annual Maintenance Contract General Electrical Work
2026_Irrig_826030_4
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹905
₹10,240
6 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
Thirunavaya 1st
OD53310/2025-2026:Hire charges for crane and Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53309/2025-2026:Hire charges for Crane , Lowering down and erecting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53311/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD65722/2025-2026:Dismantling the 5-10 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD65719/2025-2026: Refitting up to 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53312/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53316/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD53315/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD83101/2025-2026:Fully Comprehensive Annual Maintenance contract of above110 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Irringallur
OD53290/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53291/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53288/2025-2026:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
OD75486/2025-2026:Refitting the MCCB above 250A to 630 A ,attach to the Panel board and giving connection,
OD260135/2025-2026:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
OD260136/2025-2026:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
OD260137/2025-2026:Refitting the 16 HP to 60HP star delta starters ,attach to the Panel board or Metal Frame and giving connection, testing and trail run on full load
OD260138/2025-2026:Refitting the 5HP to 15 HP DOL / star delta starters ,attach to the Panel board or Metal Frame and giving connection, testing and trail run on full load.
OD53298/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD53289/2025-2026:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD53293/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53292/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53299/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD82975/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC)all time during the period of contract and the faults should be rectified with in the time allowed
OD53297/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD82976/2025-2026:Fully Comprehensive Annual Maintenance contract of above31-60 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Ullanam
OD53301/2025-2026:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53303/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD75978/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53302/2025-2026:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53304/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD75977/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53308/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD53307/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD53305/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Rewinding
OD65007/2025-2026:Conveyance charge of 20 - 120 HP motor / pump / panel board / starter board etc by Tata acefrom pump house to workshop and bring back to pump house
OD264559/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
Bearing
OD65783/2025-2026:Replacing old bearing and supply new bearing no 6313 SKF/FAG or equivalent
OD65784/2025-2026:Replacing old bearing and supply new bearing no 6312 SKF/FAG or equivalent
OD260132/2025-2026: Supply & renewal of bearing No. 7310 BEP
OD260133/2025-2026: Supply & renewal of bearing No. NU 310 ECJ
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1385508.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.32 MB
BOQ_1385508.xls
BOQ • 0.34 MB
Thirunavaya10245NITSBDmerged.pdf