| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.4 L+₹50,706 (13.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.4 L+₹53,905 (13.9%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BIJO K P L3 | ABDUL SALEEM M L1 | SELVAM A L2 |
|---|---|---|---|---|---|---|
| 1.00Stadium | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 23.23 | cum | 285 ₹6,621.98 | 200 ₹4,647 Lowest | 285.8 ₹6,640.56 |
| 1.00 | 19.35.2:Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including
collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2
(1 cement : 2 fine sand) including testing of joints etc. complete.600 mm dia RCC pipes. | 28.5 | metre | 3,063 ₹87,295.5 | 3,200 ₹91,200 | 3,040.38 ₹86,650.83 Lowest |
| 1.00 | OD175282/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 35.2 | cum | 3,195 ₹1,12,476.78 | 2,600 ₹91,530.4 Lowest | 3,172.88 ₹1,11,698.07 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.52 | cum | 7,975 ₹20,057.13 | 7,000 ₹17,605 Lowest | 7,916.52 ₹19,910.05 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 94.5 | kilogram | 90 ₹8,505 | 103 ₹9,733.5 | 89.32 ₹8,440.74 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.65 | sqm | 309 ₹1,745.85 | 354 ₹2,000.1 | 306.81 ₹1,733.48 Lowest |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 387.03 | cum | 357 ₹1,38,169.71 | 265 ₹1,02,562.95 Lowest | 354.13 ₹1,37,058.93 |
| 1.01 | 2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited) | 7 | cum | 1,189 ₹8,323 | 1,364 ₹9,548 | 1,179.95 ₹8,259.65 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.25 | cum | 6,859 ₹36,009.75 | 6,500 ₹34,125 Lowest | 6,808.34 ₹35,743.79 |
Tender Value
₹5.1 L
EMD Value
₹12,705
Closing Date
27 Aug 2025, 6:00 pmClosed
AE
LID EW PUTHUPPADY GP
CIVIL WORK
2025_LSGD_788320_1
564/2025/AE/LSGD/PDY
Open Tender
Civil Works - Others
Item Rate
180 days
PUTHUPPADY GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,125
Yes
₹12,705
Yes
21 Nov 2025
20 Aug 2025
30 Aug 2025
20 Aug 2025
27 Aug 2025
20 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1297496.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .