Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.0 Cr
EMD Value
₹13 L
Closing Date
31 Mar 2025, 12:00 pmClosed
Executive Engineer, Boleng Division PWD, Boleng
Office of the Executive Engineer, Boleng Division PWD AP, Boleng PO/PS-Boleng, District-Siang, PIN-791103.
Improvement of Pangin ADC, HQ Township Road.
2025_PWDAP_2433_1
BD/e-NIT/CMCSRDP-II/2024-25/07
Open Tender
Civil Works – Roads
Item Rate
1095 days
Pangin ADC, HQ.
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,500
EE PWD Boleng
₹13 L
Office of the Executive Engineer, Boleng Divn.PWD
31 Mar 2025
25 Mar 2025
31 Mar 2025
25 Mar 2025
31 Mar 2025
25 Mar 2025
29 Mar 2025
Amount
SH : C.C. PAVEMENT
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) ii) for grading- I Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )
FOR PLAIN RAODS Cost of Haulage Excluding Loading and Unloading i) Cement
FOR HILL ROADS Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. i) Cement from Pasighat to Work site at Pangin L-71.00 Km
ii) Sand, Stone Aggregate from Boleng Quary to work site at Pangin Lead-28.00 Km
ii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed. Lead-2.00 km
SH : RETAINING WALL 3.00 MTR. HEIGHT.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering) (i) Ordinary soil A. Manual Means (Depth upto 3 m)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonry work in cement mortar 1:3 in Foundation complete as per drawing and Technical Specifications. B) Random Rubble Coursed Rubble Massonry (first sort)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. i) Cement from Pasighat to Work site at Pangin L-71.00 Km
ii) Sand, Stone Aggregate from Boleng Quary to work site at Pangin Lead-28.00 Km
ii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed. Lead-2.00 km
SH : SLAB CULVERT 2.00 MTR. SPAN.
Excavation for Structures(Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) I. Ordinary soil A. Manual Means (i) upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications B) PCC Grade M20 (p) Height upto 5m
Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification A. RCC Grade M20 Case I. Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications A) Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipem extending through the full width of the structure with slope of IV : 20 H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material
FOR HILL ROADS Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. i) Cement and Steel from Pasighat to Work site at Pangin Lead-71.00 Km
ii) Sand, Stone Aggregate from Boleng Quary to work site at Pangin Lead-28.00 Km
ii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed. Lead-2.00 km
SH : C.C. DRAIN
Excavation for Structures (Earth work in excavation of foundation and trenches as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A. Manual Means (i) upto 3 m depth
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: b) Walls including attached buttresses, pilaster etc.
Centring and shuttering including strutting, propping etc and removal of form work for : b) Walls including attached buttresses, pilaster etc.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
FOR HILL ROADS Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. i) Cement and Steel from Pasighat to Work site at Pangin Lead-71.00 Km
ii) Sand, Stone Aggregate from Boleng Quary to work site at Pangin Lead-28.00 Km
ii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed. Lead-2.00 km
M/S ASEAN AGENCIES (BID ID -7143)
stage.html
html • 0.02 MB
finance_2596.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
166736618.xls
BOQ Document • 0.42 MB
166736619.pdf
Tender Document • 2.00 MB
TenderDoc.pdf
Tender Document • 11.82 MB
166736621.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .