| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 LAccepted-AOC | L1 | Accepted-AOC lowest tender | |
| 2 | L2₹64.8 L+₹2.7 L (4.36%)Rejected-AOC | L2 | Rejected-AOC second lowest tender | |
| 3 | L3₹65.0 L+₹2.9 L (4.73%)Rejected-Finance | L3 | Rejected-Finance third lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical fifth lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical eighth lowest |
Tender Value
₹79.6 L
EMD Value
₹50,000
Closing Date
3 Aug 2023, 5:00 pmClosed
EE MID TVPM
O/o the EE MID TVPM
Construction of Side Protection wall and Shutter arrangements in Malamelkunnil and Shutter arrangements in Mangulam Vairamangalam at Estate Ward of Thiruvananthapuram Corporation-
2023_Irrig_589252_2
10/EEMI/2023-24
Open Tender
Civil Works - Water Works
Item Rate
270 days
Thiruvananthapuram corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
4 Sept 2023
22 Jul 2023
5 Aug 2023
22 Jul 2023
3 Aug 2023
22 Jul 2023
Amount
Appendix A - Construction of side protection wall and shutter arrangements in Malamelkuunnil
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD20062/2022-2023:Putting up ring bund by engaging man coolies during the course of construction and removing the bund after the completion of the work etc. complete as directed by the departmental officers at site
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD26650/2022-2023:Supplying and fixing wooden shutter of suitable size to with standard design and maximum pressure as prescribed by the departmetnal officers and using and installing the M.S Channel procieded in the grooves arranged, M.S. angle 50 x50 x 6mm, teak wood planks 0,065cm thick, M.S. shaft of size 63.5mm dia. and 5.0m long, 150mm long nut & bolt, including taring with coat tar over new wood, painting with aluminium paint over iron works etc. complete as per the direction of departmental officers at site
Appendix B - Construction of shutter arrangements in Mangulam Vairamangalam
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD20246/2022-2023:Putting up ring bund by engaging man coolies during the course of construction and removing the bund after the completion of the work etc. complete as directed by the departmental officers at site
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
OD26653/2022-2023:Supplying and fixing wooden shutter of suitable size to with standard design and maximum pressure as prescribed by the departmetnal officers and using and installing the M.S Channel procieded in the grooves arranged, M.S. angle 50 x50 x 6mm, teak wood planks 0,065cm thick, M.S. shaft of size 63.5mm dia. and 5.0m long, 150mm long nut & bolt, including taring with coat tar over new wood, painting with aluminium paint over iron works etc. complete as per the direction of departmental officers at site
REVATHY CONSTRUCTIONS
J RAJESH
RAJENDRAN T
G.ROBINSON
S.R.SATHYASEELAN
SHIBU
K V SHIBU
Bidder Name
S.R.SATHYASEELAN
G.ROBINSON
K V SHIBU
SHIBU
J RAJESH
ABHIJITH P R
REVATHY CONSTRUCTIONS
RAJENDRAN T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_871783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .