Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹69.1 L
EMD Value
₹1.4 L
Closing Date
8 Feb 2023, 5:00 pmClosed
Excutive Engineer
Office Of The Executive Engineer, Construction Division, Uttarakhand Peyjal Nigam, Kotdwar
Construction of source CWR laying jointing and testing of GI pipe line providing FHTC and other appurtenant works in Sinala Solar Pumping water supply scheme Phase-II along with handing over the works after commissioning to maintenance agency jjm
2023_MDPEY_54341_1
421/Nivida/130 dt 21-01-2023
Open Tender
Civil Works - Water Works
Item Rate
270 days
Rikhnikhal
As per tender document
3 documents required · 3 mandatory
₹4,720
Executive Engineer, UKPJN, Kotdwar
₹1.4 L
Kotdwara
28 Jun 2025
25 Jan 2023
10 Feb 2023
25 Jan 2023
8 Feb 2023
28 Jan 2023
25 Jan 2023 - 27 Jan 2023
27 Jan 2023
stage.html
html • 0.02 MB
finance_66305.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.32 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Sinala.pdf
Tender Documents • 1.57 MB
BOQ_66305.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .