Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LRejected-Finance | L1 | Rejected-Finance Rate quoted is higher than Estimated cost | |
| 2 | L2₹32.2 L+₹2.0 L (6.77%)Rejected-Finance | L2 | Rejected-Finance L 2 |
Tender Value
Refer Docs
EMD Value
₹55,200
Closing Date
31 Oct 2022, 10:00 amClosed
DIG GC CRPF SONEPAT HARYANA
DIG cum Estate Officer GC CRPF Sonipat HARYANA
Repairing of 13 No lifts and AMC with License renewal and insurance of 24 No lifts at GC CRPF Sonipat Haryana
2022_CRPF_715731_1
B.V-1/2022-23-GC-SPT BLDG
Open Tender
Electrical Works
Works
365 days
DIG cum Estate Officer GC CRPF Sonepat HR
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹55,200
Yes
7 Dec 2022
30 Sept 2022
1 Nov 2022
1 Oct 2022
31 Oct 2022
1 Oct 2022
1 Oct 2022 - 31 Oct 2022
Phase-I (Repairing work of 13 nos lifts) Repairing work of 09 Nos passenger lifts. (Capacity=03 nos 1360kgs/20 passenger & 06 nos 540kgs/08 passenger). II Repairing work of 04 Nos Goods lifts. (Capacity= 02 nos 1020 kgs & 02 nos 1000kgs
Taking down and supplying and fixing in replacement of new Main rope & door weight rope for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new FCV Card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new CCB card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new COB,safety & CCV Card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Door drvive card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Audio card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new HLG & CPU Card for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Door sensor for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Lift lights for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Roller for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Door shoes for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Brake drum & brake cable for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Lop-Cop display for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Door contract for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new lift fan for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Taking down and supplying and fixing in replacement of new Switch indicator,circuit pannel for KONE all as specified and directed by Engr -in-charge.(Make-OEM as per recommendation)
Phase-II (Comprehensive maintenance with Licience renewal and insurance for 1 year of total 24 nos elecrically operated lifts ( passenger =16 Nos and Goods=08 Nos) after completion of repairing work of 13 nos lift mentioned as above ) inclusive all material consumable, spare parts, labour, testing instrument, transportation with materials and partrs.
All inclusive comprehensive operatio & all rutine, preventive and servicing work ( rollers, gears, bearings, break coils, chock brake shoes, liners, contractor, relays, colls, push buttons, door operator, VVF drive, VVVF main drive, cardoor safety device limit switches, governor, hoistway dooe locks, indicator and other minor mechanical parts) as required from time to time per 30 days upto 12 months for compete 24nos, passenger Lifts-16 nos lifts (capacity 20 and 08 persons) and 08 Nos Goods lift make Kone, cost all type of repairs complete as per terms & conditions. Rate to be coated for all spares parts and required Grease, oil, cotton waste to maintain elecator for maintenance/repair and services of lift. All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-charge.
AB ELEVATOR ESCALATOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .