Tender Value
₹48.3 L
EMD Value
₹96,600
Closing Date
27 Aug 2026, 3:30 pm3d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WA SECTION
74 conditions · 2 needing a document upload
Beam bottom's line, level & width should be checked.
Beam side's line , level & plumb should be checked.
Beam to beam measurements shall be checked as per architectural drawing.
Individual level & diagonal of each slab bay shall be checked.
Slab thickness level shall be marked with nails on the peripheral beam's outer side.
Slab thickness & beam depths should be checked
Support props for slab & beam bottoms should be in line & plumb, Bamboo bracing should be done at around 4' ht from floor level. Support props for double staging terraces shall be carefully checked.
Line of external/peripheral beam's side shall be checked & should be cross supported to avoid building out of sides.
Junctions of column & beam shall be checked & should be cross supported to avoid building out of sides.
De-shuttering oil shall be applied to beam/slab shuttering
Formwork of staircase shall be checked for dimensions of tread and riser, level of treads, plumb of risers.
Reinforcement shall be checked for beams and slab as per RCC drawing.
Proper cover for bottom/sides shall be checked for beams.
Proper cover shall be checked for slab.
Electrical points, electrical piping (conduits)/fan hooks shall be checked as per drawing.
Reduction of column as per drawing shall be done if any.
Proper no. of chairs shall be provided for slab.
Parapet (pardi) bars shall be left for balconies/staircase etc.
Ring (stirrups) shall be provided at the free end of each column reinforcement
Gaps between plates/planks should be filled. Taping should be done at ply joints in care of ply shuttering
Approval of architect and RCC consultant shall be taken prior to pouring.
Check the availability of required labour strength, mixer, lift, vibrators, masons, weigh batcher, diesel/petrol and plastics sheets etc. before start of concreting.
Hidden beams/inverted beams/cantilever beams should be checked.
Check for the sunk if any as per the approved drawings.
Packing below supports props should be avoided. If not, single wooden plank should be inserted as packing
In case of large slabs, position of concrete joints shall be decided in advance as per approval by RCC consultant.
Availability of raw material for concrete/RMC per grade of concrete, water. Electricity shall be checked in advance before the start of concreting.
Concreting shall be done for the beams first & then slabs.
Compaction of concrete shall be done by vibrators & tamping rods. (Spare vibrators with fuel shall be ensured.)
The top level of slabs shall be finished by the mason and no one should be allowed to walk on the fresh finished concrete.
Carpenter shall be present below the slab shuttering during concreting to ensure the tightness of the form work.
In case of rains, the finished concrete shall be covered with the big plastic sheets.
Cast 6 cube moulds for testing.
Curing the slab shall be done with pounding method by making ponds in cement & sand mortar(1.10) of size around 5'X5' curing of beams and slabs shall be done for 7 to 10 days or as directed by the consultant.
Date of casting and slab no shall be painted on the front side beam.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Labour Cooperative Societies shall submit only 50% of bid security for which the tenderers are required to upload Registration certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that -" We are a Labour Cooperative Society and our Registration No. is .................... with .......................and hence required to deposit only 50% of Bid Security
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security on submission of Registration Certificate issued by appropriate authority. For such firms it is required to upload a copy of Registration Certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that - I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Bid Security.
THE OFFERS WITHOUT EARNEST MONEY EXCEPT IN CASE OF EXEMPTION CLAIMED AS PER COMMERCIAL COMPLIANCE OF NIT WILL BE SUMMARILY REJECTED.
Kota - Provision of New yard master office to avoid frequent main line crossing by staff to ensure safety to staff.
142-2026~WCR
142-2026
Open
Works - General
8 Months
Kota, Rajasthan
₹0
₹96,600
4 Aug 2026
4 Aug 2026
13 Aug 2026
113 items across 3 schedules · ₹54,20,715.07 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | cum | — | 90 | 286.85 | 25,816.5 |
| 2 | cum | — | 45 | 253.95 | 11,427.75 |
| 3 | cum | — | 35 | 104.5 | 3,657.5 |
| 4 | cum | — | 15 | 2,161.2 | 32,418 |
| 5 | cum | — | 8 | 7,365.15 | 58,921.2 |
| 6 | cum | — | 30 | 6,833.4 | 2,05,002 |
| 7 | Sqm | — | 40 | 307.95 | 12,318 |
| 8 | Sqm | — | 180 | 766.55 | 1,37,979 |
| 9 | Sqm | — | 160 | 608.35 | 97,336 |
| 10 | Sqm | — | 60 | 804.25 | 48,255 |
| 11 | Kg | — | 2700 | 89.65 | 2,42,055 |
| 12 | Kg | — | 6500 | 89.65 | 5,82,725 |
| 13 | cum | — | 30 | 8,683.8 | 2,60,514 |
| 14 | cum | — | 60 | 10,306.2 | 6,18,372 |
| 15 | cum | — | 45 | 7,676.3 | 3,45,433.5 |
| 16 | cum | — | 30 | 6,653.45 | 1,99,603.5 |
| 17 | Sqm | — | 50 | 1,063.45 | 53,172.5 |
| 18 | cum | — | .4 | 1,06,720.85 | 42,688.34 |
| 19 | Sqm | — | 24 | 2,818.5 | 67,644 |
| 20 | Each | — | 30 | 194.35 | 5,830.5 |
| 21 | Each | — | 16 | 234.9 | 3,758.4 |
| 22 | Each | — | 8 | 75.55 | 604.4 |
| 23 | Each | — | 16 | 60.05 | 960.8 |
| 24 | Each | — | 16 | 62.25 | 996 |
| 25 | Sqm | — | 12 | 1,051.75 | 12,621 |
| 26 | Kg | — | 2500 | 142.3 | 3,55,750 |
| 27 | Kg | — | 180 | 612.25 | 1,10,205 |
| 28 | cum | — | 10 | 7,958.65 | 79,586.5 |
| 29 | Sqm | — | 160 | 1,706.6 | 2,73,056 |
| 30 | Sqm | — | 22 | 2,038.55 | 44,848.1 |
| 31 | Sqm | — | 16 | 935.6 | 14,969.6 |
| 32 | Metre | — | 30 | 319.75 | 9,592.5 |
| 33 | Each | — | 10 | 119.95 | 1,199.5 |
| 34 | Each | — | 10 | 309.5 | 3,095 |
| 35 | Sqm | — | 430 | 282 | 1,21,260 |
| 36 | Sqm | — | 20 | 382.1 | 7,642 |
| 37 | Sqm | — | 430 | 137.85 | 59,275.5 |
| 38 | Sqm | — | 50 | 131.45 | 6,572.5 |
| 39 | Sqm | — | 430 | 123.85 | 53,255.5 |
| 40 | Each | — | 2 | 5,540.55 | 11,081.1 |
| 41 | Each | — | 1 | 5,426.8 | 5,426.8 |
| 42 | Each | — | 3 | 5,268.85 | 15,806.55 |
| 43 | Each | — | 3 | 1,404 | 4,212 |
| 44 | Each | — | 4 | 90.95 | 363.8 |
| 45 | Metre | — | 25 | 304.15 | 7,603.75 |
| 46 | Metre | — | 25 | 491.2 | 12,280 |
| 47 | Metre | — | 25 | 485.2 | 12,130 |
| 48 | Metre | — | 25 | 541.1 | 13,527.5 |
| 49 | Metre | — | 25 | 417.95 | 10,448.75 |
| 50 | Metre | — | 25 | 654.2 | 16,355 |
| 51 | Each | — | 10 | 757.1 | 7,571 |
| 52 | Each | — | 10 | 1,513.7 | 15,137 |
| 53 | Each | — | 2 | 506.65 | 1,013.3 |
| 54 | Each | — | 2 | 573.5 | 1,147 |
| 55 | Each | — | 2 | 1,173.65 | 2,347.3 |
| 56 | Each | — | 2 | 1,320.8 | 2,641.6 |
| 57 | Litre | — | 1000 | 9.7 | 9,700 |
| 58 | Each | — | 4 | 143.3 | 573.2 |
| 59 | Each | — | 6 | 136.6 | 819.6 |
| 60 | Kg | — | 400 | 433.95 | 1,73,580 |
| 61 | Kg | — | 225 | 531.8 | 1,19,655 |
| 62 | Sqm | — | 20 | 1,019.8 | 20,396 |
| 63 | Each | — | 60 | 70.95 | 4,257 |
| Schedule total | ₹46,78,490.84 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ApprovedBrandListTill12.11.25.pdf
ATTACHMENT
SCAFFOLDINGDRAWING4.80MHT1.pdf
ATTACHMENT
electricalspecialcondition.pdf
ATTACHMENT
Electricaltechnicalspecification.pdf
ATTACHMENT
TENDERDOCUMENT56-2026approvedforuploading.pdf
ATTACHMENT
Vigilanceguidelines-PublicProcurement.pdf
ATTACHMENT
PCE CIRCULAR
ATTACHMENT
Acceptance of E Bank guarantee
ATTACHMENT
Civilspecialcondition_1.pdf
ATTACHMENT
ANNEXURE-PCECIRCULAR2016-17-ilovepdf-compressed1-compressed.pdf
ATTACHMENT
Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC2026_06_16.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].