Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance THOTTAPPALLY HOUSE EMILY KALPETTA P O KERALA 673121 | WAYANAD | KERALA | 673121 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹30.7 L (19.6%)Admitted-Finance DOOR NO XXVII 1580 KOITHARA ROAD PANAMPILLY NAGAR KOCHI 682 036 | KOCHI | ERNAKULAM | KERALA | 682036 | ₹1.9 Cr+₹30.7 L (19.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹31.1 L (19.9%)Admitted-Finance | ₹1.9 Cr+₹31.1 L (19.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAIJAL T M L1 | Albert Rebello and Company L3 | M.J.JOY AND COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' B/R WORKS | ||||||
| 2.00 | Excavation over areas not exceeding 1.5m deep and getting out in hard/dense soil complete all as specified and as directed by Engineer-in-Charge. | 520 | Cum | 350 ₹1,82,000 Lowest | 400.3 ₹2,08,156 | 450 ₹2,34,000 |
| 3.00 | Returning, filling in including spreading, levelling, watering and well ramming in layers in soil complete all as specified and as directed by Engineer-in-Charge. | 49 | Cum | 420 ₹20,580 | 150 ₹7,350 | 130 ₹6,370 Lowest |
| 4.00 | Removing excavated material to a distance exceeding 250m and not exceeding 500m and depositing where directed at a level not exceeding 1.5m above starting point complete all as specified and as directed by Engneer-in-Charge. | 471 | Cum | 420 ₹1,97,820 | 250 ₹1,17,750 Lowest | 300 ₹1,41,300 |
| 5.00 | Material and labour for Plain cement concrete 1:4:8 type D2 using 40mm graded stone aggregate in foundations, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 115 | Cum | 9,000 ₹10,35,000 | 6,000 ₹6,90,000 Lowest | 6,400 ₹7,36,000 |
| 6.00 | Material and Labour for Plain cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in coping, bands,bed plates kneelers,apex stones,bed plates,kerbs, water troughs and the like including weathering, slightly rounded or chamfered angles and throating, exposed surfaces without using extra cement including necessary form work etc complete all as specified and as directed by Engineer-in-Charge. | 57 | Cum | 11,500 ₹6,55,500 | 9,600 ₹5,47,200 | 7,800 ₹4,44,600 Lowest |
| 7.00 | Material and Labour for Reinforced cement concrete[Nominal mix]1:2:4 type B1 using 20mm graded stone aggregate s in foundations, including rafts, footings, foundation beams, plinth beams, bases for columns etc basement slabs, under reamed piles and mass concrete complete all as specified and as directed by Engineer-in-Charge. | 141 | Cum | 11,700 ₹16,49,700 | 9,300.2 ₹13,11,328.2 Lowest | 9,400 ₹13,25,400 |
| 8.00 | Walling of random rubble uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as specified and as directed by the Engineer - in - Charge.Note: Stone will be issued under Schedule 'B'(Quary Stone). Stone shall be broken as per site requirement. | 453 | Cum | 4,120 ₹18,66,360 Lowest | 5,500 ₹24,91,500 | 5,800 ₹26,27,400 |
| 9.00 | Walling of random rubble masonry work uncoursed built in cement mortar 1:6 complete all as specified and as directed by the Engineer - in - Charge.Note: Stone will be issued under Schedule 'B''(Quary Stone). Stone shall be broken as per site requirement. . | 681 | Cum | 4,120 ₹28,05,720 Lowest | 6,500 ₹44,26,500 | 6,500 ₹44,26,500 |
| 10.00 | Stone boulder pitching hand packed tightly pitching and grouted with cement and sand mortar 1:6 complete all as specified and as directed by Engineer-in-Charge. Note: Stone will be issued under Schedule 'B''(Quary Stone). Stone shall be broken as per site requirement. | 1,130 | Cum | 3,900 ₹44,07,000 Lowest | 6,300 ₹71,19,000 | 6,100 ₹68,93,000 |
Tender Value
₹1 Cr
EMD Value
₹1.8 L
Closing Date
16 Dec 2022, 6:00 pmClosed
CE NW Kochi
Naval Base Kochi
As per Tender documents
2022_MES_564115_1
891034
Open Tender
Civil Works
Item Rate
180 days
Kochi
As per Tender documents
7 documents required · 7 mandatory
₹1,000
Yes
GE NS Kochi
₹1.8 L
Yes
22 Dec 2022
19 Nov 2022
19 Dec 2022
19 Nov 2022
16 Dec 2022
2 Dec 2022
21 Nov 2022 - 25 Nov 2022
Amount
SCHEDULE 'A' B/R WORKS
Excavation over areas not exceeding 1.5m deep and getting out in hard/dense soil complete all as specified and as directed by Engineer-in-Charge.
Returning, filling in including spreading, levelling, watering and well ramming in layers in soil complete all as specified and as directed by Engineer-in-Charge.
Removing excavated material to a distance exceeding 250m and not exceeding 500m and depositing where directed at a level not exceeding 1.5m above starting point complete all as specified and as directed by Engneer-in-Charge.
Material and labour for Plain cement concrete 1:4:8 type D2 using 40mm graded stone aggregate in foundations, filling and mass concrete complete all as specified and directed by Engineer-in-Charge.
Material and Labour for Plain cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in coping, bands,bed plates kneelers,apex stones,bed plates,kerbs, water troughs and the like including weathering, slightly rounded or chamfered angles and throating, exposed surfaces without using extra cement including necessary form work etc complete all as specified and as directed by Engineer-in-Charge.
Material and Labour for Reinforced cement concrete[Nominal mix]1:2:4 type B1 using 20mm graded stone aggregate s in foundations, including rafts, footings, foundation beams, plinth beams, bases for columns etc basement slabs, under reamed piles and mass concrete complete all as specified and as directed by Engineer-in-Charge.
Walling of random rubble uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as specified and as directed by the Engineer - in - Charge.Note: Stone will be issued under Schedule 'B'(Quary Stone). Stone shall be broken as per site requirement.
Walling of random rubble masonry work uncoursed built in cement mortar 1:6 complete all as specified and as directed by the Engineer - in - Charge.Note: Stone will be issued under Schedule 'B''(Quary Stone). Stone shall be broken as per site requirement. .
Stone boulder pitching hand packed tightly pitching and grouted with cement and sand mortar 1:6 complete all as specified and as directed by Engineer-in-Charge. Note: Stone will be issued under Schedule 'B''(Quary Stone). Stone shall be broken as per site requirement.
Material and Labour for Keyed pointing to random or polygonal rubble, uncoursed or brought upto course with cement mortar 1:4 complete all as specified and as directed by the Engineer-in-Charge.
Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams;top coping and similar work; vertical or to batter complete all as specified and directed by Engineer-in-Charge.
Material and Labour for mild steel TMT bars 10mm dia and over cut to length, bend to shape required including cranking, bending spirally or hooping for column, hooking ends ad binding with mild steel wire annealed not less than 0.9mm dia complete all as specified and as directed by Engineer-in-Charge.
Material and Labour for mild steel TMT bars 5mm dia over upto and including 10mm dia in stirrups, spacers, binders, hooking ends and binding with and including mild steel wire annealed not less than 0.9mm dia complete all as specified and as directed by Engineer-in-Charge.
M.J.JOY AND COMPANY
Albert Rebello and Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .