Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
8 Mar 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Central University of Kashmir, Ganderbal JK UT
e-Tender for Construction of RCC columns (3Nos) on isolated footings for main Gate at Watlar township CUK, Ganderbal
2021_CUoK_619703_1
RCCcolumns-at-Watlar-NIT No. 01 of 2021
Open Limited
Civil Works
Works
40 days
CUK Township Watlar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
10 Mar 2021
1 Mar 2021
9 Mar 2021
1 Mar 2021
8 Mar 2021
1 Mar 2021
90 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Supplying & filling of stone soiling hand packed including cost of hand ramming etc & carriage upto the site of work. Complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering & shuttering. All works upto plinth level 1:4:8 ( 1cement: 4Coarse sand zone III: 8 graded stone agg. 40mm nominal size) crusshed incl. of all carriages complete.
Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing & reinforcement. All works upto plinth level. 1:1.5:3 mix incl. of all carriages complete.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth/ above plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more incl. of all carriages complete.
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Syed Gazanfar Ali Shah
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .