Tender Value
₹8.1 L
EMD Value
₹20,300
Closing Date
14 Sept 2026, 5:00 pmClosed
Deputy Chief Engineer
O/o the Deputy chief Engineer, Civil Circle, Kothamangalam
Upper Sengulam Hydro Electric Project 1x24 MW Powerhouse and pressure shaft Geological exploration Taking 6 Nos. boreholes Nx size
2026_KSEB_867769_1
04/CCK/2026-27/05.09.2026
Open Tender
Civil Works - Others
Percentage
60 days
Vellathooval, Sengulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
₹20,300
16 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transporting drilling machine, pumpset and other accessories to the proposed USHEP Power House site and pressure shaft including loading and unloading charges and transporting back after completion of works as per the direction of departmental officers. (Approximate weight 5 MT) | 1 | set | 33,508.25 | ₹33,508.25 |
| 2 | Conveying drilling machine, pump set and accessories to the drilling location, erecting, dismantling and shifting to the nearest location / road access including all leads, lifts, labour and machine charges etc. | 6 | Nos | 9,338.46 | ₹56,030.76 |
| 3 | Drilling in soil consisting of earth and boulders using diamond drill (Nx), and re-drilling wherever required, including labour charges, machinery, air, water, etc. | 65 | m | 785.15 | ₹51,034.75 |
| 4 | Drilling in rock / concrete using diamond drill-Nx size(with double core barrel), and re-drilling wherever required, taking cores, serially numbering with paint, placing the same in core boxes and transporting including labour charges,machinery, air, water, etc. (excluding cost of core box). | 90 | m | 4,980.44 | ₹4,48,239.6 |
| 5 | Grouting with cement during drilling overburden and jointed rocks where water loss is observed as per the direction of the Deptl. officers at site. | 450 | kg | 30.46 | ₹13,707 |
| 6 | Supplying M.S core boxes with 150x60x10cm with 7 inside compartments and hinged top cover with locking arrangements and 2 Nos. handle on sides, using 2mm thick M.S plate and 30 x 5mm M.S flats including cutting, shaping, welding, applying a coat of iron primer after scrapping and cleaning, painting with 2 coats of synthetic enamel paint, painting bore hole details and name scheme on both sides of lid for identification, etc. complete as per direction of departmental officers. | 515 | kg | 259.88 | ₹1,33,838.2 |
| 7 | Conducting field permeability test in the holes of different elevations of average 2.5m interval using pressure 2kg/cm², 4kg/cm² and 6kg/cm², 4kg/cm² and 2kg/cm² in each elevation (each pressure should be maintained for 15minutes) using grout pumps including charges for making connection to the holes, washing etc.complete as per the direction of the Dept. officers | 28 | reach | 2,670.61 | ₹74,777.08 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
standardbiddocborehole.pdf
Tender Documents • 2.64 MB
annexureborehole.pdf
Tender Documents • 0.48 MB
BOQ_1469938.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .