| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-Finance | ₹22.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹22.5 LRejected-Finance | ₹22.5 L | L2 | Rejected-Finance L2 |
Tender Value
₹22.3 L
EMD Value
₹45,000
Closing Date
20 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY
Interlocking road construction work from Pradeep Goyal s house to Praveen s house in Phase 5, Pawan Vihar, Ward No. 17. (Block-Cantonment Area)
2026_REDUP_1145674_1
28/11/EE/RED/NIVIDA/2026-27 DATE 01-04-2026
Open Tender
Civil Works
180 days
Cantt Chetra
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹45,000
4 Jun 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - | - |
| 1 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 48.42 | cum | 198.55 | ₹9,613.79 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 |
| 2 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 8 :4 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 275 | 33 | cum | 3,924.45 | ₹1,29,506.85 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. |
| 3 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 56.93 | cum | 5,225 | ₹2,97,459.25 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) |
| 4 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 4 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 198 | Sqm | 206.15 | ₹40,817.7 | Supply & Laying of Polythene sheet 125 Micron for separation layer Including all Material, Labour T&P ……..Complete . |
| 5 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 8.55 | Sqm | 7,441.35 | ₹63,623.54 | Making contraction joint in C.C. Road 0.80 kg maxphalt , 0.01 kg cement & 0.0025 m³ coarse sand Complete as per directed by E/I (senctioned by S.E. Bareilly). |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 108.08 | cum | 2,950.99 | ₹3,18,943 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405. | 81.8 | cum | 3,844.56 | ₹3,14,485.01 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504 |
| 8 | Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge.(new item 1) | 1,090.65 | cum | 831.25 | ₹9,06,602.81 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504 |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.. As per S.I. No. 283 A. | 2.93 | cum | 8,436.95 | ₹24,720.26 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
11T1.pdf
Tender Documents • 1.65 MB
BOQ_2141844.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid