Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.0 L+₹7,878.36 (2.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.1 L+₹15,922 (4.07%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.1 L+₹16,472.94 (4.21%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.1 L+₹19,778.54 (5.06%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.5 L
EMD Value
₹5,509
Closing Date
9 Jul 2026, 5:00 pmClosed
Superintending Engineer, RW Division-II, Umerkote
O/o the Superintending Engineer, Rural Works Division-II, Nabarangpur, Umerkote
Badatemera to Dongriguda_Road_Repair of RCC Slab Culvert -2X6X3- Railing, Bed Concrete, Cutoff WallAt 5.100 Km.5.000 to 5.100
2026_CERWI_133840_1
Online Tender 02 RWD UKT 2026 27
Open Tender
Civil Works - Roads
Percentage
90 days
Umerkote
2 documents required · 2 mandatory
₹4,000
₹5,509
Yes
14 Aug 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
30 Jun 2026 - 8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge. | 56 | cum | 282.88 | ₹15,841.28 |
| 2 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 31.8 | cum | 1,407.86 | ₹44,769.95 |
| 3 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. | 0.01 | cum | 0.01 | ₹0 |
| 4 | In Foundation | 58.36 | cum | 6,204.58 | ₹3,62,099.29 |
| 5 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications direction of Engineer in charge. | 24 | cum | 2,718.21 | ₹65,237.04 |
| 6 | Proving R.C.C M-30 Casting in Wearing Coat including cost canveyance rayality & taxes of all materials cost of all labour T&P etc, complete. | 6.75 | cum | 7,555.11 | ₹50,996.99 |
| 7 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications | 1.07 | qtl | 11,205.41 | ₹11,989.79 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_598969.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .