Executive Engineer, Capital Project Division No.3, Gandhinagar
3054 M & R to Road Repairing of road using Jet Patcher material Technology, C.C road and various other works on Koba - Sabarmati SH-71 Km.10/000 to 12/000 & Gandhinagar - Koba Aerodrome road SH-43 road Km.10/000 to 14/600.
310220
Tender Notice No.SK-2 of 2026-27. (Sr.No.3)
Open
Civil - All
Gandhinagar
6 documents required · 6 mandatory
₹1,500
Executive Engineer, Capital Project Division No.3, Gandhinagar
₹42,148
1 Jun 2026
1 Jun 2026
1 Jun 2026
10 Jun 2026
1 Jun 2026
Name of Work :-3054 M & R to Road Repairing of road using Jet Patcher material Technology, C.C road and various
other works on Koba - Sabarmati SH-71 Km.10/000 to 12/000 & Gandhinagar - Koba Aerodrome road SH-43 road
BILL OF QUAINTITIES
MEMORANDUM SHOWING THE ITEM OF WORKS TO BE CARRIED OUT
Item Description of Item Quantity Unit Rate In figures Amount
1 Providing Jet Patcher material technology with 1500.00 Sqm. 2031.11
required using aggregate consist of crushed
angular B.T. material which range from 2 to
mm dry fine aggregate using binder emulsion or
asphalt. The cold emulsions either cationic and
have a 60 to 63 percent bitumen content having
medium to rapid setting emulsion as per IS:
8887. Asphalt if shall be used VG-30 grade
bitumen confirming to IS:73-2013 and shall be
used @ 5.50 percent to total weight of material
& tack coat of 25Kg./10 Sq.mt. & it emulsion
used shall be @ 5 percent by weight of total mix
shall be used repair potholes upto 7 mm depth
including scraping to desire of damaged surface
in proper shape, brushing, cleaning, spreading
and compacting to desire density with
geometric shape with all labour materials and
machinery etc. as directed by Engineer in
Item Description of Item Quantity Unit Rate In figures Amount
Dismantling of Flexible Pavements
(Dismantling of flexible pavements and disposal
of dismantled materials up to a lead of
metres, stacking serviceable and unserviceable
materials separately) 1. By Mechanical Means B
Granular courses
Engaged unskilled labour for trimming,
removing roots, loading debries, trees, in
tractor or dumper and spreading the same at
disposal site and final dressing and leveling the
ground including required tools and plants like
pick-axe, pavda, axe, dhariya, ghamela hammer
Hire charges for Engaging various machinery
on road site as and where required including
diesel, lubricant, driver etc. as directed by
engineer in charge (A) Tractor with Trolly
Item Description of Item Quantity Unit Rate In figures Amount
Providing and applying quick fix patch repair
for distressed bitiminous/ concrete surface
using slica fume based material mixed with
approved graded granular material, laid in
required thickness compacted with roller/ hand
compactor to achive firm and even surface
including cost of all materilas, labour tools,
roller. watering, curing (if required) and as
directed by the Engineer - in -charge.
Hire charges of Hydraulic Excavator (1 Cum
buckett, 60 Cum/Hour) including fuel,
operator, maintanance etc. complete.
Rupees Forty two lakhs fourteen thousand seven hundred twenty three and Total Rs.
paise thirty only.
Executive Engineer,
Capital Project Division No.3
Item Description of Item Quantity Unit Rate In figures Amount
I/We am/are willing to carry out the above work @ ____________ % below/above percent (should be written in figures
and words) of the estimated rates mentioned above Amount of my/our tender works out as under.
Estimated cost put to tender Rs. 42,14,723=30 Estimated cost put to tender Rs. 42,14,723=30
Deduct ___________% below Add__________% above
In words In Words
Note 1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
Note 2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Executive Engineer,
Capital Project Division No.3
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
File No.1 E-Tendering Notice.pdf
File No.2 SBD.pdf
File No.3 BOQ.pdf
File No.4 Specification.pdf
File No.5 Clause 501 900 MORTH.pdf
File No.6 Condition GR.pdf
File No.7 Condition GR.pdf
Download all tender documents and submit your bid