| Sl No | Description | Qty | Unit | Fakir Mohamad L2 | ankur mahajan L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundations,trenches etc in earth work in all kind of soil, such as pick work, jumper work, blasting hard or soft rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water with in all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15cm (fifteen centimetres) layers, when required into plinths, of foundations etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth, Complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-Charge. | 23.4 | cum | 350 ₹8,190 | 250 ₹5,850 |
| 2.00 | Laying, Jointing & Testing of Ductile Iron Pipes conforming to IS :8329 : (150 mm dia) Ductile Iron Class K-7 pipes Complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-Charge. | 300 | rmt | 150 ₹45,000 | 50 ₹15,000 |
| 3.00 | Laying push-on-joints to Ductile Iron Pipes including testing of joints and the cost of Ruber Gaskets Conforming to I.S 5382 of S.B.R quality 150mm dia. complete in all respect i/c all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 50 | each | 60 ₹3,000 | 10 ₹500 |
| 3.10 | Providing , Laying, Jointing & Testing of PVC Pipe 150 diameter working pressure not less than 6.00Kg/Sqm i/c filling the joints with approved adhesive, clamps etc. complete in all respect as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts [Diplast/Finolex make]. | 18 | rmt | 900 ₹16,200 | 700 ₹12,600 |
| 3.20 | Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 70.2 | cum | 7,000 ₹4.9 L | 6,000 ₹4.2 L |
| 4.00Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.10 | In suspended floor roofs,landings, shelves and their supports balconies, beams girders bressumers and centilevers upto floor two level i/c carriage of material complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 2.03 | cum | 8,000 ₹16,240 | 7,200 ₹14,616 |
| 5.00 | In foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 3.9 | cum | 8,000 ₹31,200 | 7,500 ₹29,250 |
| 5.10Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 5.20 | Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 345.67 | cum | 350 ₹1.2 L | 280 ₹96,787.60 |
Tender Value
Refer Docs
EMD Value
₹19,400
Closing Date
5 Mar 2026, 11:00 amClosed
EE
JSD DHARMSHALA
Restoration of rain damages to Sewerage Scheme Dharamshala Town in Tehsil Dharamshala District Kangra
2026_HPIPH_129359_1
NO. EE-JSD-EA-I-2026-18349-448
Open Tender
Civil Works
120 days
dsala
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹19,400
9 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
5 Mar 2026
26 Feb 2026
23 Feb 2026 - 26 Feb 2026
Excavation in foundations,trenches etc in earth work in all kind of soil, such as pick work, jumper work, blasting hard or soft rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water with in all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15cm (fifteen centimetres) layers, when required into plinths, of foundations etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth, Complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Laying, Jointing & Testing of Ductile Iron Pipes conforming to IS :8329 : (150 mm dia) Ductile Iron Class K-7 pipes Complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Laying push-on-joints to Ductile Iron Pipes including testing of joints and the cost of Ruber Gaskets Conforming to I.S 5382 of S.B.R quality 150mm dia. complete in all respect i/c all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge.
Providing , Laying, Jointing & Testing of PVC Pipe 150 diameter working pressure not less than 6.00Kg/Sqm i/c filling the joints with approved adhesive, clamps etc. complete in all respect as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts [Diplast/Finolex make].
Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:-
In suspended floor roofs,landings, shelves and their supports balconies, beams girders bressumers and centilevers upto floor two level i/c carriage of material complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
In foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Flat surfaces such as soffits of sunspended floor, roofs landings and the like floors etc upto 200mm thickness complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge..
Providing and laying reinforcement cement concreate work 1:1½:3 (1 cement: 1½ sand:3 graded Stone 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work: In walls(any thickness) and not less than 0.10 mtr thickness attached pillaster buttresses, plinth and string courses etc from top of foundation level up to floor two level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and laying Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and Lifts as per the direction and satisfection of Engineer-In-Charge.
Providing & fixing of precast RCC (SFRC) manhole cover with frame conforming to IS specifications Code- 12592 Part-I & II with latest amendment (Heavy duty) complete in all respect within all leads and lifts as per the directions and to the entire satisfaction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
terms.pdf
Tender Documents • 0.41 MB
BOQ_191255.xls
BOQ • 0.28 MB
form68.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid