Loading
Loading…
Loading…
Tender Value
₹10.3 L
EMD Value
₹21,000
Closing Date
5 Jun 2026, 5:00 pmDue tomorrow
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
MGCCD 12 ALIGARH
Construction of DRB at Km 1.000 of Alhadadpur Minor.
2026_UPIDC_1147187_20
02/EE/2026-27
Open Tender
Civil Works - Bridges
90 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹516
₹21,000
30 May 2026
30 May 2026
6 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete But excluding G.S.T. | - | cum | - | - |
| 2 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. | - | cum | - | - |
| 3 | Brick Work (M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete. | 1 | cum | - | - |
| 4 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material, labour, T&P etc. Required for the proper complition of work. | 1 | cum | - | - |
| 5 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. | - | sqm | - | - |
| 6 | Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete. | - | sqm | - | - |
| 7 | Steel Reinforcement Work i/c Supplying,Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. | - | MT | - | - |
| 8 | Struck deep pointing in 1:2 C.M. i/c all cost of material T&P etc as per direction of Engineer-in -charge. | - | sqm | - | - |
| 9 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | - | RM | - | - |
| 10 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
thirteen.pdf
Tender Documents • 1.23 MB
BOQ_2162570.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid