Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance WARD NO 4 NETA NAGAR SULTANPUR PATTI TEHSIL BAZPUR U S NAGAR RAMNAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | Admitted-Finance |
| 3 | Admitted-Finance 58 SANGAM VIHAR KANWALI GMS ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹25.0 L
EMD Value
₹75,000
Closing Date
24 Jun 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Distribution Circle Ranikhet
Annual Maintanance work of 33/11 Manila under EDD Bhikiyasain
2021_UPCL9_33224_1
EDC(R)-02/2021-22
Open Tender
Electrical Works
Item Rate
365 days
Manila Bhikiyasain
As per Tender Document
2 documents required · 2 mandatory
₹1,180
Yes
Executive Engineer
₹75,000
Yes
3 Jul 2021
4 Jun 2021
25 Jun 2021
4 Jun 2021
24 Jun 2021
4 Jun 2021
120 days
Amount
Maintenance and preventive maintenance of 33 KV, 11 KV, LT lines and DTR's as per JE instructions.(18 kms 33 KV, 242 kms 11 KV , 372 Kms LT, 215 nos DTR) as per schedule 2 including timely release of NSC & disconnection works as per JE instructions and consumer complaints handling as per UERC Supply Code 2020 and replacement straightening of upto 2 nos damaged / tilted poles and replacement of 50 nos defective mechanical meters including contractor profit.
Operation Work in shifts (4 shifts) for operation of 33/11 KV Substation including contractor profit.
Meter Reading and bill distribution work of consumers as per schedule monthly/ bimonthly basis including SBM and accessories Cartidge Roll etc
R&R of damaged transformers 5 % of 215= 10. Excess damaged transformers will be replaced free of cost by the contractor.
Gani Engineering and construction company
SRI NARAYAN ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .