Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
Closing Date
2 Apr 2021, 6:55 pmClosed
Executive Engineer Mech. Irrigation Div. Baramulla
Mech. Irrigation Div. Baramulla
Electrical work to be carried out at various lift irrigation schemes.
2021_IFC_121341_1
eNIT-49 of 2020-21
Open Tender
Electrical Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹100
Yes
Executive Engineer Mech. Irrigation Div. Baramulla
Exempted
Mech. Irrigation Div. Baramulla
6 Apr 2021
27 Mar 2021
3 Apr 2021
27 Mar 2021
2 Apr 2021
27 Mar 2021
30 Mar 2021
Amount
Repairs to one 5HP 3 phase priming pumping unit of by way of dismantling it from suction and delivery side flanges with the help of skilled labour, loading in private load carrier and shifting it to workshop for repair. The job includes the charge for complete rewinding of stator coils as per sample of copper wire of standard size and quality. The job includes the charge for providing and fitting of insulation material in the slots of stator including bamboo straps, latheride paper etc. and varnishing of winding with good quality varnish. The job includes the charge for providing and fitting of SS sleeve as per sample. The job also includes the charge for providing and fitting of bearing of motor as per sample. Then reassembling the pumping unit at workshop and shifting to site and tested on full load. The job also includes p/f of suction/delivery G.I pipe for connecting the pumping units.
Providing and fitting of 11 KV link set reputed make for lift irrigation scheme Novla 1st.
Repairs to 50 HP manually operated starter of LIS Darpora & Novla 1st by way of: A. Providing and fitting of fixed copper contact points (complete set). B. Providing and fitting of movable copper contact points (complete set). C. Repairs to the handle mechanism by way of providing and fitting of damaged tension springs, nuts and allied accessories. D. Repairs to the trip coil mechanism by way of providing and fitting of magnetic trip coil 415 volt AC. The job involves loading and transportation up to workshop and back to site after repairs and testing on full load.
M/s A. N. Engineering Works Kralpora Chadoora
M/s INFO ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .