| 1 | L1₹46.0 LAccepted-AOC | ₹46.0 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹47.8 L+₹1.8 L (3.82%)Rejected-AOC 231 JAGGI GARDEN BALDEV NAGAR AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹47.8 L+₹1.8 L (3.82%) | L2 | Rejected-AOC OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | M/S SHANTI SARUP DINESH CHAND L1 | Bairagi Builders L2 |
|---|---|---|---|---|---|
| 1.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 650 | SQUARE METRE | 25 ₹16,250 Lowest | 30 ₹19,500 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 290 | SQUARE METRE | 25 ₹7,250 Lowest | 30 ₹8,700 |
| 3.00 | Demolition of Cement concrete of any description and in any position not otherwise
specifically provided for complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 2.75 | CUBIC METRE | 300 ₹825 Lowest | 350 ₹962.5 |
| 4.00 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 3.4 | CUBIC METRE | 1,400 ₹4,760 | 450 ₹1,530 Lowest |
| 5.00 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. | 30 | EACH | 300 ₹9,000 | 250 ₹7,500 Lowest |
| 6.00 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 30 | EACH | 300 ₹9,000 Lowest | 300 ₹9,000 Lowest |
| 7.00 | Taking down shutter from the frame of any description exc 1 sq. m but n exc 2 sq. m
each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 15 | EACH LEAF | 200 ₹3,000 | 100 ₹1,500 Lowest |
| 8.00 | Taking down shutter of any description not exc 1 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 10 | EACH LEAF | 340 ₹3,400 | 300 ₹3,000 Lowest |
| 9.00 | Taking down shutter of any description exc 1 sq. mtr but not exc 2 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 10 | EACH LEAF | 340 ₹3,400 | 300 ₹3,000 Lowest |
| 10.00 | Taking down aluminium shutter of any description not exc 1 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 12 | EACH LEAF | 1,100 ₹13,200 | 500 ₹6,000 Lowest |
Tender Value
₹44.9 L
EMD Value
₹89,800
Closing Date
11 Jun 2026, 6:00 pmClosed
GE CHANDIGARH
GE CHANDIGARH N AREA OLD AIRPORT CHOWK CHANDIGARH 160003
GE/CHD/T-21/2026-27 REPAIR TO PERISHED WORNOUT JOINERY,CUPBOARDS,KITCHEN SHELVES IN MD ACCN AT NAHAN UNDER GE CHANDIGARH
2026_MES_767251_1
GE/CHD/T-21/2026-27
Open Tender
Civil Works
Item Rate
180 days
NAHAN HP
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹89,800
Yes
17 Aug 2026
22 May 2026
13 Jun 2026
22 May 2026
11 Jun 2026
6 Jun 2026
23 May 2026 - 30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 650 | SQUARE METRE | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 290 | SQUARE METRE | - | - |
| 3 | Demolition of Cement concrete of any description and in any position not otherwise
specifically provided for complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 2.75 | CUBIC METRE | - | - |
| 4 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 3.4 | CUBIC METRE | - | - |
| 5 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. | 30 | EACH | - | - |
| 6 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 30 | EACH | - | - |
| 7 | Taking down shutter from the frame of any description exc 1 sq. m but n exc 2 sq. m
each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 15 | EACH LEAF | - | - |
| 8 | Taking down shutter of any description not exc 1 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 10 | EACH LEAF | - | - |
| 9 | Taking down shutter of any description exc 1 sq. mtr but not exc 2 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 10 | EACH LEAF | - | - |
| 10 | Taking down aluminium shutter of any description not exc 1 sq. mtr and refixing the same after easing and minor alterations complete all as specified and directed by Engineer-in-Charge. | 12 | EACH LEAF | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TENDER21.pdf
Tender Documents • 3.20 MB
BOQ_859263.xls
BOQ • 5.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .