| 1 | L1₹18.9 LAdmitted-Finance H NO 07 SHIVAJI NAGAR PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹18.9 L | L1 | Admitted-Finance |
| 2 | L2₹21.5 L+₹2.7 L (14.0%)Admitted-Finance WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | ₹21.5 L+₹2.7 L (14.0%) | L2 | Admitted-Finance |
| 3 | L3₹22.0 L+₹3.1 L (16.3%)Admitted-Finance | ₹22.0 L+₹3.1 L (16.3%) | L3 | Admitted-Finance |
| 4 | L4₹22.1 L+₹3.2 L (17.2%)Admitted-Finance | ₹22.1 L+₹3.2 L (17.2%) | L4 | Admitted-Finance |
| 5 | L5₹23.5 L+₹4.6 L (24.4%)Admitted-Finance | ₹23.5 L+₹4.6 L (24.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KEWAL SONS L6 | M/S SHAKTI ELECTRIC WORKS L1 | G M CONSTRUCTION COMPANY L2 | Micky Traders L5 | M/S VEDHANT ASSOCIATES L4 | JANDIAL ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables, Foundation, filling of poles or stays complete all as specified and directed by Engineer-in-Charge. | 233 | Cum | 30 ₹6,990 Lowest | 80 ₹18,640 | 70 ₹16,310 | 50 ₹11,650 | 100 ₹23,300 | 100 ₹23,300 |
| 2.00 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 34.93 | Cum | 3 ₹104.79 Lowest | 10 ₹349.3 | 5 ₹174.65 | 5 ₹174.65 | 6 ₹209.58 | 6 ₹209.58 |
| 3.00 | Returning, filling in, including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed by Engineer-in-Charge. | 198.07 | Cum | 5 ₹990.35 Lowest | 10 ₹1,980.7 | 7 ₹1,386.49 | 9 ₹1,782.63 | 10 ₹1,980.7 | 6 ₹1,188.42 |
| 4.00 | M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed.
Note: Punned thickness of sand shall be measured. | 69.86 | Cum | 100 ₹6,986 Lowest | 330 ₹23,053.8 | 300 ₹20,958 | 300 ₹20,958 | 400 ₹27,944 | 300 ₹20,958 |
| 5.00 | Supply and laying sub class 'B' bricks of (230x115x75 mm) or of size locally available , laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 2,500 | Each | 3 ₹7,500 Lowest | 6 ₹15,000 | 4 ₹10,000 | 4 ₹10,000 | 5 ₹12,500 | 5 ₹12,500 |
| 6.00 | Laying only old bricks retrieved from item No. 7 here-in-after of any size/type laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 5,000 | Each | 4 ₹20,000 | 2 ₹10,000 Lowest | 4 ₹20,000 | 5 ₹25,000 | 5 ₹25,000 | 2 ₹10,000 Lowest |
| 7.00 | Taking up the existing cables from trenches of any size any type all as specified and directed by Engr-in-Charge. | 1,150 | RM | 1 ₹1,150 Lowest | 2 ₹2,300 | 1 ₹1,150 Lowest | 2 ₹2,300 | 2 ₹2,300 | 2 ₹2,300 |
| 8.00 | Supply and lay cable XLPE insulated armored heavy duty electric cable with aluminum conductor, 1100 volts grade of cross sectional area 16 Sq mm 2 core complete all as specified and directed.
Note: Earth work ( Excavation, Returning & refilling and removal), sand cushioning , cable protection cover, GI protection pipe shall be measured and paid for separately under respective item of Schedule | 250 | RM | 130 ₹32,500 | 118 ₹29,500 Lowest | 200 ₹50,000 | 150 ₹37,500 | 150 ₹37,500 | 200 ₹50,000 |
| 9.00 | All as per item No. 8 here-in-before but of size 16 Sqmm 04 core | 200 | RM | 175 ₹35,000 Lowest | 175 ₹35,000 Lowest | 250 ₹50,000 | 190 ₹38,000 | 180 ₹36,000 | 400 ₹80,000 |
| 10.00 | All as per item No. 8 here-in-before but of size 25 Sqmm 4 core | 150 | RM | 195 ₹29,250 Lowest | 220 ₹33,000 | 300 ₹45,000 | 300 ₹45,000 | 250 ₹37,500 | 500 ₹75,000 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
20 Aug 2026, 6:00 pmClosed
GE SOUTH PATHANKOT
GE SOUTH PATHANKOT
GES/PKT/53/2026-27 REPAIR/MAINT OF LT OH LINES/UG CABLES, LT FEEDER PILLAR BOXES, LT PANELS, POLES, CAPACITOR, PANELS, CONNECTED SWITCH GEARS AND OTHER ALLIED WORKS AT DAMTAL, KANDRORI, NANGAL BHUR, KAUNTERPUR AND MIRTHAL AREA UNDER GE SOUTH PATHANKO
2026_MES_781807_1
GES/PKT/53/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
KANDRORI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE SOUTH PATHANKOT
₹40,000
Yes
10 Sept 2026
30 Jul 2026
22 Aug 2026
30 Jul 2026
20 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables, Foundation, filling of poles or stays complete all as specified and directed by Engineer-in-Charge. | 233 | Cum | 105 | ₹24,465 |
| 2 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 34.93 | Cum | 106 | ₹3,702.58 |
| 3 | Returning, filling in, including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed by Engineer-in-Charge. | 198.07 | Cum | 107 | ₹21,193.49 |
| 4 | M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed.
Note: Punned thickness of sand shall be measured. | 69.86 | Cum | 108 | ₹7,544.88 |
| 5 | Supply and laying sub class 'B' bricks of (230x115x75 mm) or of size locally available , laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 2,500 | Each | 109 | ₹2,72,500 |
| 6 | Laying only old bricks retrieved from item No. 7 here-in-after of any size/type laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 5,000 | Each | 110 | ₹5,50,000 |
| 7 | Taking up the existing cables from trenches of any size any type all as specified and directed by Engr-in-Charge. | 1,150 | RM | 112 | ₹1,28,800 |
| 8 | Supply and lay cable XLPE insulated armored heavy duty electric cable with aluminum conductor, 1100 volts grade of cross sectional area 16 Sq mm 2 core complete all as specified and directed.
Note: Earth work ( Excavation, Returning & refilling and removal), sand cushioning , cable protection cover, GI protection pipe shall be measured and paid for separately under respective item of Schedule | 250 | RM | 111 | ₹27,750 |
| 9 | All as per item No. 8 here-in-before but of size 16 Sqmm 04 core | 200 | RM | 119 | ₹23,800 |
| 10 | All as per item No. 8 here-in-before but of size 25 Sqmm 4 core | 150 | RM | 119 | ₹17,850 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
tender53.pdf
Tender Documents • 1.41 MB
BOQ_875811.xls
BOQ • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .