Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically Qualified |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
8 Apr 2026, 3:00 pmClosed
MANAGING DIRECTOR
STEEL INDUSTRIALS KERALA LTD.SILK Nagar, Athani P. O, Mulamgunnathukavu,Thrissur - 680 581,Kerala, India.
Supply, Installation, Testing, Commissioning and Performance demonstration of Catalytic cutter as per the technical specifications and detailed scope for RVSF at SILK Steel Fabrication Unit, Cherthala, Alappuzha and SILK SBUA,Kannur
2026_SILK_836206_3
SILK/RVSF/SBUA/SFU/2025-26/12
Open Tender
Miscellaneous Works
Item Rate
45 days
Cherthala
As per the tender documents
10 documents required · 10 mandatory
₹2,950
₹50,000
30 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
1 Apr 2026 - 8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STEEL FABRICATION UNIT, CHERTHALA, ALAPPUZHA, KERALA | |||||
| 1.01 | Supply, Installation, Testing, Commissioning and Performance demonstration of Catalytic cutter as per the technical specifications and detailed scope | 1 | Nos | - | - |
| 1.02 | First year AMC (after the Gurantee peiod of 2 years as per the tender conditions) | 1 | LS | - | - |
| 1.03 | Second year AMC (after the Gurantee peiod of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 1.04 | Third year AMC (after the Gurantee peiod of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2SHIP BUILDING UNIT, AZHIKKAL, KANNUR, KERALA | |||||
| 2.01 | Supply, Installation, Testing, Commissioning and Performance demonstration of Catalytic cutter as per the technical specifications and detailed scope | 1 | Nos | - | - |
| 2.02 | First year AMC (after the Gurantee peiod of 2 years as per the tender conditions) | 1 | LS | - | - |
| 2.03 | Second year AMC (after the Gurantee peiod of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2.04 | Third year AMC (after the Gurantee peiod of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
COMPLIANCEMATRIX.pdf
Additional Documents • 0.29 MB
TENDERENQUIRY.pdf
Additional Documents • 0.31 MB
BOQ_1433573.xls
BOQ • 0.29 MB
GCC.pdf
Tender Documents • 0.66 MB
TECHNICALSPECIFICATION.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .