Loading…
Loading…
| Sl No | Description | Qty | Unit | Kasim P A L2 | RAJEEV L1 |
|---|---|---|---|---|---|
| 1.00pond renovation | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 24 | hour | 335.17 ₹8,044.08 | 319.62 ₹7,670.88 Lowest |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 14.03 | cum | 1,161.4 ₹16,299.09 | 1,107.53 ₹15,543.08 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.13 | cum | 348.94 ₹395.7 | 332.74 ₹377.33 Lowest |
| 1.00 | OD258162/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 13.72 | cum | 1,664.4 ₹22,828.91 | 1,587.19 ₹21,769.9 Lowest |
| 1.00 | OD258111/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 40.03 | cum | 3,873.66 ₹1,55,054.86 | 3,693.95 ₹1,47,861.43 Lowest |
| 1.01 | OD258073/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.73 | cum | 7,473.36 ₹1,10,097.54 | 7,126.65 ₹1,04,989.81 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.07 | sqm | 374.58 ₹1,899.12 | 357.2 ₹1,811 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.89 | cum | 8,958.88 ₹25,891.16 | 8,543.27 ₹24,690.05 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 211.41 | kilogram | 109.06 ₹23,056.81 | 104 ₹21,987.06 Lowest |
Tender Value
₹4.1 L
EMD Value
₹10,212
Closing Date
29 Oct 2025, 2:00 pmClosed
AE
Office of the AE, Edavilangu GP
Annual Plan-118/2025-26-Edavilangu GP-Cleaning and Protection of Public ponds in Gramapanchayat-General Civil Work
2025_LSGD_796456_2
31/2025-26
Open Tender
Civil Works - Water Works
Item Rate
Edavilangu
Please refer Tender documents.
7 documents required · 7 mandatory
₹905
Yes
₹10,212
Yes
3 Feb 2026
21 Oct 2025
31 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1356599.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1356599.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
viewnit.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .