Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69,767Accepted-AOC THOTTIYIL CHITHARI RAVANESHWARAM | KERALA | L1 | Accepted-AOC L1 E/R | |
| 2 | L2₹88,962.63+₹4,229.11 (4.99%)Rejected-AOC | L2 | Rejected-AOC L2 HENCE REJECTED |
| Sl No | Description | Qty | Unit | AJITH KUMAR M L2 | SUKESH M L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING WATER TANK | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.53 | cum | 355.33 ₹543.65 | 338.41 ₹517.77 Lowest |
| 1.00 | 18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | 5,000 | Litre | 12 ₹60,000 | 11.43 ₹57,150 Lowest |
| 1.00 | OD220094/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 3.26 | cum | 6,044.48 ₹19,729.18 | 5,756.65 ₹18,789.71 Lowest |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 0.4 | cum | 9,641.52 ₹3,856.61 | 9,182.4 ₹3,672.96 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.8 | sqm | 381.43 ₹305.14 | 363.27 ₹290.62 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 0.14 | cum | 720.47 ₹97.98 | 686.16 ₹93.32 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 8.4 | sqm | 365.24 ₹3,068.02 | 347.85 ₹2,921.94 Lowest |
| 1.01 | 50.18.7.2.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer -in-Charge 20 mm dia 10 Kgf/cm2- Internal work - Exposed on wall | 5 | metre | 272.41 ₹1,362.05 | 259.44 ₹1,297.2 Lowest |
Tender Value
₹84,734
EMD Value
₹2,118
Closing Date
20 Sept 2025, 11:00 amClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER,LID AND EW ,PALLIKARE GRAMA PANCHAYATH , P.O.BEKAL,PIN 671316
Annual Plan-PALLIKKARE GP 2025-26,PR.NO.157/26-PROVIDING WATER TANK AT THOKKANAMMOTTA UNNATHI-IN PALLIKKARE GP-General Civil Work
2025_LSGD_795046_25
02/AE/LSGD/PK/2025-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
PALLIKARE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,118
Yes
11 Nov 2025
11 Sept 2025
22 Sept 2025
11 Sept 2025
20 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1316590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .