| 1 | 1₹5.8 CrAccepted-AOC AMARAVATI COLONY HALDWANI | HALDWANI | UTTARAKHAND | ₹5.8 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹5.9 CrRejected-AOC 254 DOON VIHAR JAKHAN RAJPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹5.9 Cr | 2 | Rejected-AOC 2 |
| Sl No | Description | Qty | Unit | M/s G S Mehra and Sons L1 | M.R.ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00Excavation of earth for laying of sewer manholes, Gully pits, Chambers, sumps etc. in ordinary soil (earth,sand loam and clay) including cutting of joints, pits, trimming, dressing, levelling refilling of trenches in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches :- Excavation in soil mixed with morum,shingle,kankar requaring use of specials T&P. | |||||
| 1.01Soil mixed with moorum, shingle & kankar etc. using of any specials, T&P, if required. (85% of relevant quantity) | |||||
| 1.02 | 0.00m to 1.50m B.G.L. | 9,943.16 | cum | 278 ₹27.6 L | 277 ₹27.5 L |
| 1.03 | 1.50m to 3.00m B.G.L. | 5,487.91 | cum | 368 ₹20.2 L | 375 ₹20.6 L |
| 1.04 | 3.00m to 4.50m B.G.L. | 1,860.52 | cum | 467 ₹8.7 L | 468 ₹8.7 L |
| 1.05 | 4.50m to 6.00m B.G.L. | 174.8 | cum | 555 ₹97,014 | 555 ₹97,014 |
| 1.06Excavation in in medium rock by chiselling including stacking usefull materials within 50m 0.00 to 1.50m below G.L.(15% of relevant quantity) | |||||
| 1.07 | 0.00m to 1.50m B.G.L. | 1,754.67 | cum | 1,150 ₹20.2 L | 1,150 ₹20.2 L |
| 1.08 | 1.50m to 3.00m B.G.L. | 968.45 | cum | 1,251 ₹12.1 L | 1,250 ₹12.1 L |
| 1.09 | 3.00m to 4.50m B.G.L. | 328.33 | cum | 1,385 ₹4.5 L | 1,380 ₹4.5 L |
Tender Value
₹5.9 Cr
EMD Value
₹11.8 L
Closing Date
23 Dec 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Construction Circle, Uttarakhand Peyjal Nigam, Haldwani
Nawabi Road Atal Marg from Durga City Chauraha to Kaladhungi Road Trunk Sewerage Scheme
2025_MDPEY_89709_1
5804 / 613 / 96 Dated 03-12-2025
Open Tender
Pipe Laying Works
540 days
Haldwani
Please refer tender documents
3 documents required · 3 mandatory
₹5,900
Executive Engineer, PIU (AMRUT), UPJN, Haldwani
₹11.8 L
Haldwani
15 May 2026
10 Dec 2025
29 Dec 2025
10 Dec 2025
23 Dec 2025
16 Dec 2025
12 Dec 2025
Excavation of earth for laying of sewer manholes, Gully pits, Chambers, sumps etc. in ordinary soil (earth,sand loam and clay) including cutting of joints, pits, trimming, dressing, levelling refilling of trenches in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches :- Excavation in soil mixed with morum,shingle,kankar requaring use of specials T&P.
Soil mixed with moorum, shingle & kankar etc. using of any specials, T&P, if required. (85% of relevant quantity)
0.00m to 1.50m B.G.L.
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
Excavation in in medium rock by chiselling including stacking usefull materials within 50m 0.00 to 1.50m below G.L.(15% of relevant quantity)
0.00m to 1.50m B.G.L.
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
Provide & fix open timbering (covering1/3rd of surface area by planks), in trenches for the depth Below ground level consisting of 40mm thick approved country wood planks for poling board 125mm × 75mm Indian Salwood walers and 100mm dia Sal ballies for strurts at 1.50m c/c including removal after laying of sewer both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor. 0 to 1.5 mt.
Depth upto 3.00m, below G.L.
Provide & fix close timbering in trenches for the depth Below ground level consisting of 40mm thick approved country wood planks for poling board 125mm × 75mm Indian Salwood walers and 100 mm dia Sal ballies for strurts at 1.50m percent including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
3.00m to 6.00m, Below G.L.
Providing and laying Non Pressure NP-3 class (Medium duty) jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete
150mm dia
0.00m to 1.50m B.G.L.
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
200mm dia
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
250mm dia
1.50m to 3.00m B.G.L.
300mm dia
3.00m to 4.50m B.G.L.
350mm dia
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
400mm dia
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
450mm dia
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
500mm dia
1.50m to 3.00m B.G.L.
3.00m to 4.50m B.G.L.
4.50m to 6.00m B.G.L.
Provide all materials, labour, T&P etc. and construct brick masonry circular manhole i/c supply and fixing of foot steps & extra heavy duty manhole covers as per Jal Nigam specifications and drawings.
upto 1.65m B.G.L.
900mm internal dia
upto 3.00m B.G.L.
1200mm internal dia
upto 4.50m B.G.L.
1500mm internal dia
Variation in depth of shaft to regulate the cost of manhole.
upto 1.65m B.G.L.
900mm internal dia
upto 3.00m B.G.L.
1200mm internal dia
upto 4.50m B.G.L.
1500mm internal dia
Provide all materials, labour, T&P etc. and construct of R.C.C circular manhole i/c supply and fixing of foot steps & extra heavy duty manhole covers as per Jal Nigam specifications and drawings. (Detail measured attached)
upto 6.00m B.G.L.
1500mm internal dia
Variation in depth of shaft to regulate the cost of manhole. (Detail measured attached)
upto 6.00m B.G.L.
1500mm internal dia
Provide all materials, labour, T&P etc. and construct brick masonry house connecting chambers as per Jal Nigam specifications and drawings.
0.90 x 0.60 x 1.50m internal size
Variation in depth of shaft to regulate the cost of house connecting chambers.
0.00m to 1.50m B.G.L.
Interconnection the sewer line of house connecting chamber to sewer manhole :-
Excavation of earth depth upto 1.5 mt. Below G.L. for laying of sewer manholes, Gully pits, Chambers, sumps etc. in ordinary soil(earth,sand loam and clay) including cutting of joints, pits, trimming, dressing, levelling refilling of trenches in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches :- Excavation in soil mixed with morum,shingle,kankar requaring use of specials T&P.
0.00 to 1.50m B.G.L.
Providing and laying Non Pressure NP-3 class (Medium duty) jointed with stiff mixture of cement mortar in the proportion of1:2 (1 cement : 2 fine sand) including testing of joints etc. complete
150mm dia
0.00m to 1.50m B.G.L.
Carting and recarting of excavated earth in the narrow lanes, in which excavated earth is not possible to collect the earth above the trenches. (upto 5km @ Rs. 15.33/qtl./km)
= 1.60 x 10 x 14.02 x 2 = Rs. 448.64 per cum
Disposal of surplus earth upto a distance of 8.0 Km including loading, transporting, unloading to approved dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Shifting of water supply lines and other utility services falls in alignment of sewer line. It also includes the repair and reinstatement of damaged services.
Providing, Carting, laying & jointing fixing and testing of G.I screwed pipe with specials in trenches (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (Medium quality), including cutting, threading etc complete
15 mm dia
32 mm dia
40 mm dia
50 mm dia
65 mm dia
80 mm dia
100 mm dia
Excavation in soil mixed with single, boulders etc. requiring the use of special T&P for pipeline trenches including lift upto 1.5 m and lead upto 30 m, refilling, watering, ramming of excavated earth into the trenches.
Supply and cartage of sluice or reflux valves of following sizes to the site of work, lowering in already prepared trenches and fixing them in position, but excluding jointing which shall be paid separately, including cost of valves, non rising (P.N. 1.00)
50 mm dia
65 mm dia
80 mm dia
100 mm dia
Making connection with existing M.S. galvanised mains of upto 25 mm nominal dia, including cutting and threading of pipe, bailing out water, fixing if required, specials and testing etc. complete, but excluding cost of insertion pipes and specials besides boring out and also subsequent back fill existing main.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer- in-charge. (For RCC Slab in Drain)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (For RCC Slab in Drain)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. - Thermo-Mechanically Treated bars. (For RCC Slab in Drain)
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Bituminous road
Providing and laying in position cement concrete of 1:1½:3 (1 Cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) and finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. Reinstatement of CC Road.
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means
Reinstatement of drains, damaged at the time of laying of sewer lines.
U Type Drain (45 cm X 30 cm)
K.C. Drain
For Bedding Construction of granular sub-base by providing well graded material, spreading in uniform layers , mixing by mix in place method and compacting the material to achieve the desired density. - Using Gravel mix soil using
0.00m to 4.50m B.G.L.
For Bedding Construction of Class Ab Plain Concrete Cradle for Bedding
3.00m to 6.00m B.G.L.
Provision for barricading in two rows and necessary diversion of paths and where as necessary with the help of ballies, ropes, flags, signals and light signals etc. as per requirement. Including supply of all material, T&P, etc complete.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
For RCC Slab in Drain
Dismantling steel cylinder, R.C.C pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-charge : Up to 600 mm diameter
Household Sewer Connection
Temporary bypassing of sewer: Providing a complete sewer bypassing system including, but not limited to, developing a sewer bypassing plan, developing a spill prevention and emergency response plan, submitting and obtaining approval from the Engineer-in-charge for the sewer bypassing plan and the spill prevention and emergency response plan, implementing the bypassing and spill prevention and emergency response plan, providing bypassing in accordance with the approved plans throughout the duration of the work including furnishing labour, materials, equipment, and incidentals required to maintain continuous and reliable wastewater service in all wastewater lines during construction, constructing and maintaining temporary bypass sewers to maintain continuous and reliable wastewater flow in all pipes, including individual service connections, removing and disposing off all offensive matter spilled during the bypass pumping as per the instructions of Engineer-in-charge. In line with the specifications prescribed in IndSTT:201-2018: Code of practice for cured in place pipe Technique suiting Indian Conditions.
For Manhole of pipes upto 300 mm dia.
For Manhole of pipes upto 600 mm dia.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.75 MB
Tender.pdf
Tender Documents • 3.54 MB
BOQ_106351.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid