Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC BTC KOKRAJHAR ASSAM | ₹3.0 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹3.0 Cr+₹71,417.13 (0.24%)Rejected-AOC GWJWNPURI WARD NO 4 CHIRANG P O CHAPAGURI PS DALIGAON DISTRICT CHIRANG PIN 783373 | KOKRAJHAR | ASSAM | 783373 | ₹3.0 Cr+₹71,417.13 (0.24%) | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | LAJIK BRAHMA L2 | Sri Bishnu Basumatary L1 |
|---|---|---|---|---|---|
| 1.00 | Light Jungles: Clearing light jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work up to a distance of 30 m, etc. complete as directed. (When 30% of the area is covered by shrubs, trees etc.) | 2,200 | Sqm | 12 ₹26,400 | 11.21 ₹24,662 Lowest |
| 2.00 | Collection of river boulder of size 23 cm to 30 cm in average and minimum weight 30 Kg having i. Specific gravity not less than 2.65, ii. Aggregate Chrushing < 30% (Wearing) & < 45% (Non - wearing) iii. Impact Value (%) max < 30% (Wearing) & < 45% (Non - wearing) and iv. Abrasion Value (%) < 30% (Wearing) & < 50% (Non - wearing) (Materials conforming to IS 2386 part III & IV 1963) free from dust, dirt and other foreign materials including necessary carriage and stacking in regular measurable stacks at site, monopoly, etc. complete as directed. (10% under sized (not less than 10 cm) boulder is allowable for packing/filling the gaps occurred during execution of works) Complete as directed. (15% deduction will be made from the stack measured quantities on account of void). | 3,927.23 | Cum | 1,440 ₹56,55,211.2 | 1,431.47 ₹56,21,711.93 Lowest |
| 3.00 | Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m | 92.34 | Cum | 131 ₹12,096.54 | 130.44 ₹12,044.83 Lowest |
| 4.00 | Hexagonal Wire Netting Roll made of 8 SWG wire triply twisted 152 mm mesh of size 15.24 m × 3.66 m longitudinal. Weight of each roll should not be less than 83 Kg/roll. | 57 | Roll | 16,500 ₹9,40,500 | 16,310.79 ₹9,29,715.03 Lowest |
| 5.00 | Supply of Galvanized Wire Netting Sheet made of 8 SWG wire 152 mm square mesh in sheet 2.57 m × 1.66 m with longitudinal wire at 152 mm centre and 76 mm projection of each wire on all sides beyond the net size of 2.42 m × 1.5 m having knots of 12 SWG at every joints, weight of each sheet should not be less than 6.3 Kg/sheet. | 2,968 | Sheet | 1,250 ₹37,10,000 | 1,240.12 ₹36,80,676.16 Lowest |
| 6.00 | Labour charge for dumping boulder in sausage made of hexagonal wire netting rolls of size (15.24 × 3.66) m cutting the netting as required making the sausage by tying the projected ends with 8 G wire including supplying & tying the wire at every joint after filling the sausage with boulders properly and launching in places handling charges including site carriage of boulder from stack yard/ dump site within a distance of 150 m. etc. and complete as directed. (Wire netting rolls to be supplied by the Department free of cost)
Without boat | 923.16 | Cum | 530 ₹4,89,274.8 | 525.01 ₹4,84,668.23 Lowest |
| 7.00 | Labour charge for dumping boulder in cage made of wire netting sheets of size 2.57 × 1.66 m of 8 G galvanized wire making the cage from 2 nos. of wire netting sheet by tying the projected wires, filling boulder inside in cage, launching the same in position, including all handling charges and including site carriage of boulder from stack yard/ dump site within a distance of 150 m. etc. and complete as directed. (Wire netting sheets to be supplied by the Department free of cost)
Without boat | 3,004.07 | Cage | 540 ₹16,22,197.8 Lowest | 544.78 ₹16,36,557.25 |
| 8.00 | Local carriage of boulder, metal, gravel/sand etc. from the approachable site beyond 150 m and up to 3.00 Km from the work site including loading from stack and unloading at work site with 10 (Ten) ton capacity truck, supplying P.O.L. etc. complete as directed. | 3,927.23 | Cum | 295 ₹11,58,532.85 | 288.63 ₹11,33,516.39 Lowest |
| 9.00 | Carriage of wire netting sheets of size 2.57 × 1.67 m made of 8 G wire of 152 mm Sq. mesh including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from divisional store)(Distance=20 km) | 2,968 | Sheet | 8.25 ₹24,486 | 7.97 ₹23,654.96 Lowest |
| 10.00 | Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at least 0.75 m below ground and height above plinth of 2.5 m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos./Rm & Jati Bamboo at the rate of 61.00 nos./Rm) | 76.54 | Sqm | 2,720 ₹2,08,188.8 | 2,707.26 ₹2,07,213.68 Lowest |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer, Water Resources Department, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Anti erosion (A/E) measures to protect Golondi river on its R/B at Kathalguri village and Dandupur area in Udalguri district.
2025_DoWR_49452_1
UDALGURI/2025-16/SOPD-G/IV
Open Tender
Civil Works
Works
365 days
UDALGURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹6.0 L
Yes
19 May 2026
18 Dec 2025
2 Jan 2026
18 Dec 2025
2 Jan 2026
24 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Light Jungles: Clearing light jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work up to a distance of 30 m, etc. complete as directed. (When 30% of the area is covered by shrubs, trees etc.) | 2,200 | Sqm | 11.21 | ₹24,662 |
| 2 | Collection of river boulder of size 23 cm to 30 cm in average and minimum weight 30 Kg having i. Specific gravity not less than 2.65, ii. Aggregate Chrushing < 30% (Wearing) & < 45% (Non - wearing) iii. Impact Value (%) max < 30% (Wearing) & < 45% (Non - wearing) and iv. Abrasion Value (%) < 30% (Wearing) & < 50% (Non - wearing) (Materials conforming to IS 2386 part III & IV 1963) free from dust, dirt and other foreign materials including necessary carriage and stacking in regular measurable stacks at site, monopoly, etc. complete as directed. (10% under sized (not less than 10 cm) boulder is allowable for packing/filling the gaps occurred during execution of works) Complete as directed. (15% deduction will be made from the stack measured quantities on account of void). | 3,927.23 | Cum | 1,431.47 | ₹56,21,711.93 |
| 3 | Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m | 92.34 | Cum | 130.44 | ₹12,044.83 |
| 4 | Hexagonal Wire Netting Roll made of 8 SWG wire triply twisted 152 mm mesh of size 15.24 m × 3.66 m longitudinal. Weight of each roll should not be less than 83 Kg/roll. | 57 | Roll | 16,310.79 | ₹9,29,715.03 |
| 5 | Supply of Galvanized Wire Netting Sheet made of 8 SWG wire 152 mm square mesh in sheet 2.57 m × 1.66 m with longitudinal wire at 152 mm centre and 76 mm projection of each wire on all sides beyond the net size of 2.42 m × 1.5 m having knots of 12 SWG at every joints, weight of each sheet should not be less than 6.3 Kg/sheet. | 2,968 | Sheet | 1,240.12 | ₹36,80,676.16 |
| 6 | Labour charge for dumping boulder in sausage made of hexagonal wire netting rolls of size (15.24 × 3.66) m cutting the netting as required making the sausage by tying the projected ends with 8 G wire including supplying & tying the wire at every joint after filling the sausage with boulders properly and launching in places handling charges including site carriage of boulder from stack yard/ dump site within a distance of 150 m. etc. and complete as directed. (Wire netting rolls to be supplied by the Department free of cost)
Without boat | 923.16 | Cum | 525.01 | ₹4,84,668.23 |
| 7 | Labour charge for dumping boulder in cage made of wire netting sheets of size 2.57 × 1.66 m of 8 G galvanized wire making the cage from 2 nos. of wire netting sheet by tying the projected wires, filling boulder inside in cage, launching the same in position, including all handling charges and including site carriage of boulder from stack yard/ dump site within a distance of 150 m. etc. and complete as directed. (Wire netting sheets to be supplied by the Department free of cost)
Without boat | 3,004.07 | Cage | 544.78 | ₹16,36,557.25 |
| 8 | Local carriage of boulder, metal, gravel/sand etc. from the approachable site beyond 150 m and up to 3.00 Km from the work site including loading from stack and unloading at work site with 10 (Ten) ton capacity truck, supplying P.O.L. etc. complete as directed. | 3,927.23 | Cum | 288.63 | ₹11,33,516.39 |
| 9 | Carriage of wire netting sheets of size 2.57 × 1.67 m made of 8 G wire of 152 mm Sq. mesh including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from divisional store)(Distance=20 km) | 2,968 | Sheet | 7.97 | ₹23,654.96 |
| 10 | Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at least 0.75 m below ground and height above plinth of 2.5 m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos./Rm & Jati Bamboo at the rate of 61.00 nos./Rm) | 76.54 | Sqm | 2,707.26 | ₹2,07,213.68 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
kathalguri_bid.pdf
Tender Documents • 0.58 MB
BOQ_78487.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .